Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Utility Infrastructure Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Utility Infrastructure Installation involves the installation of utility systems for prime contractors on construction projects within Georgia. The selected contractor is responsible for providing all necessary labor, tools, and equipment to install utility-grade piping, conduit, and appurtenances in strict accordance with project drawings and specifications. The scope of work specifically requires the use of excavators and trenchers to deliver fully operational utility infrastructure. To be eligible for this project, contractors must hold a valid Georgia Utility Contractor License. The opportunity was posted by the City of Lagrange on October 5, 2026, with a response deadline of November 5, 2026. This procurement falls under NAICS code 237990.

General Info

Documents

This scope was carved out of PE-74150-NONST-2027-000000027.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

South Davis Road (SR14) Water and Sewer Relocations

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Lagrange
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Lagrange
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation of utility systems for prime contractors on Georgia utility construction projects. Furnishes all labor, tools, and equipment to construct utility lines and appurtenances per project drawings and specifications. Utilizes trenchers and excavators to install utility-grade piping and conduit. Requires a Georgia Utility Contractor License. Delivers fully installed and operational utility infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Austin Park Skatepark - Rebid
Solicitation # LF2026(4)
The City of Clearlake is soliciting bids for solicitation number LF2026(4) to construct a new above-ground skatepark at Austin Park, located at 14135 Olympic Drive, Clearlake, California. The project scope encompasses comprehensive site development, including demolition, earthwork, subgrade preparation, and the installation of cast-in-place concrete for flatwork, ledges, and stairs. Specialized requirements include shotcrete application for ramped features following ACI 506 and 506.2 standards, metal fabrication for coping and edging, and strict adherence to ASTM F-2480 safety guidelines. The engineer's estimate for the project is 960,000.00 dollars, and the successful contractor must complete all work within 25 working days from the issuance of the Notice to Proceed. Bids must be submitted electronically via the e-Procurement Portal by 3:00 pm on October 22, 2026, and must remain valid for 90 calendar days. The contract will be awarded to the lowest responsive and responsible bidder based on a balanced bid evaluation. Required submissions include a completed electronic bid schedule, bidder information and experience forms, and a bid bond of at least 10 percent of the total bid price. The winning bidder must provide performance and payment bonds for 100 percent of the contract price and provide proof of current registration with the Department of Industrial Relations. Contract administration includes monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Contractors are required to comply with Buy America requirements, Lake County prevailing wage rates, and maintain a four-foot ADA compliant pedestrian path during construction. Quality control is managed by a City-funded independent testing laboratory, and all soil must be compacted to 95 percent max standard proctor density. Documentation requirements include digital video and photographic records of the site, as well as mill certificates for all component materials provided at the time of delivery.
CITY OF CLEARLAKE

POSTED

about 20 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Georgia → City of Lagrange

Same awarding agency

NAICS: 237110
New
SLED
South Davis Road (SR14) Water and Sewer Relocations
Solicitation # PE-74150-NONST-2027-000000027
The City of LaGrange is soliciting sealed bids for the South Davis Road (SR14) Water and Sewer Relocations project in Georgia. The scope of work involves the installation of water and gravity sewer infrastructure along the South Davis Road corridor, extending from south of Greenville Road (SR 109) to the intersection of South Davis Road and Hogansville Road (SR 14/US 29). Key deliverables include the installation of approximately 1,700 linear feet of 2-inch high density polyethylene pipe, 480 linear feet of 6-inch ductile iron pipe, and 880 linear feet of 8-inch ductile iron pipe, along with new water meters, valves, and fire hydrants. Additionally, the contractor will install approximately 400 linear feet of 8-inch PVC or PVC-replaced sewer main, raise manholes to grade, and abandon existing sanitary sewer manholes. Bidders must possess a Georgia Utility Contractor License and comply with all state requirements. Submissions must be sealed and received at the Office of the Purchasing in LaGrange, Georgia, by 11:00 a.m. local time on November 5, 2026. Each bid must include a bid bond for five percent of the bid amount. The successful contractor will be required to provide performance and payment bonds, each for 100 percent of the bid amount. Payments will be issued within 45 days of monthly applications for payment, which must be accompanied by an Engineer's Certificate for Payment. Digital drawings and specifications for the project are available for purchase through Barge Design Solutions Inc.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS