This Government Contract opportunity from Department Of Defense was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Walla Walla District Dworshak Unit 4

Closed
W912EF26RSN15Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

5 days ago

DEADLINE

in 7 days
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
Solicitation FA8137-26-R-0040 is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for general construction services at Tinker Air Force Base, Oklahoma. The contract encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects. Work execution is categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars, with a minimum guarantee of 500,000 dollars per awarded contract. The period of performance consists of a five-year base period starting March 26, 2027, with one five-year option period. The procurement is divided into a Small Business Pool, which is a 50 percent set-aside, and a Full and Open Pool. Awards are based on the Highest Technically Rated Offeror (HTRO) methodology, utilizing a Minimum Technical Threshold Rating (MTTR) based on validated self-scored matrices for technical experience, design experience, certifications, and staffing. There is no cost or price evaluation at the IDIQ level. Offerors must be registered in the System for Award Management and meet CMMC Level 1 certification requirements. Following several amendments, the final proposal response deadline was extended to November 16, 2026.
FA8137 Afsc Pzioc

POSTED

6 days ago

DEADLINE

in about 4 hours
NAICS: 236210
New
SLED
IFB 06-26 Biochar Facility Construction
Solicitation # IFB-06-26
The Southeastern Public Service Authority of Virginia (SPSA) is soliciting bids for the construction of a 40,872 square foot biochar processing plant located in Portsmouth, Virginia. The facility is designed to manage the organic portion of the SPSA SORT System. The successful contractor will be responsible for providing all labor, materials, and warranties to deliver a fully operational facility, which includes coordinating construction activities with SPSA and AMP regarding the installation and commissioning of specialized equipment. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on technical compliance, the ability to meet quality standards, and the provision of descriptive literature and references for similar completed projects. Key requirements include the submission of performance and labor and material payment bonds totaling 50 percent of the contract amount and adherence to strict safety and accessibility standards, including the Americans With Disabilities Act. Bidders must provide one original and four copies of their bid, along with an electronic copy on a flash drive, by the deadline of November 20, 2026. The contractor is required to provide as-built drawings upon completion and must comply with various federal and state regulations, including drug-free workplace and non-discrimination provisions. All work must be performed in accordance with the CED Project Manual and associated drawings, with specific quality assurance testing for concrete and asphalt as outlined in the inspection criteria.
Southeastern Public Service Authority

POSTED

6 days ago

DEADLINE

in 23 days
NAICS: 236210
Federal
IE181 - WHS Greenhouse Construction
Solicitation # 140A2327Q0297
Solicitation 140A2327Q0297 is a fixed-price contract set aside exclusively for Indian Small Business Economic Enterprises (ISBEE) to design and install an educational greenhouse facility at Wingate High School in Fort Wingate, New Mexico. The project, estimated between $100,000 and $250,000, involves a comprehensive scope of work including foundation installation, utility connections, greenhouse structure and glazing, ventilation, environmental controls, heating, and electrical systems. The work must be performed at a remote high-desert site at an elevation of approximately 6,900 feet on an occupied K-12 campus. The maximum allowable period of performance is 120 calendar days from the Notice to Proceed. Award will be made based on the Lowest Price Technically Acceptable (LPTA) method to a responsible offeror who meets all technical requirements, including the submission of a project-specific Quality Control Plan and a qualified project management team. Key requirements for offerors include registration in SAM.gov, current New Mexico contractor licensure for general building, electrical, and mechanical/gas work, and any necessary Navajo Nation tribal business licenses. Additionally, a bid bond is required for any quote exceeding $35,000. Proposals must be submitted to the Bureau of Indian Education by November 19, 2026, at 12:00 PM MDT, and must include a signed quote, UEI number, and the required Indian Economic Enterprise Representation.
Indian Education Acquisition Office

POSTED

8 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Walla Walla District, is soliciting industry feedback through a special notice for the design-build procurement of a fourth generating unit at the Dworshak Dam Powerhouse on the Clearwater River in Ahsahka, Idaho. The project, identified by solicitation number W912EF26RSN15 and classified under NAICS code 236210, aims to expand the powerhouse by adding a 300MW turbine-generator unit alongside a structural extension of the existing facility, new auxiliary systems, and related site development. The scope includes the design and construction of the powerhouse substructure and envelope, installation and commissioning of the turbine-generator, and full balance-of-plant systems such as isolated phase bus, switchboards, and control systems. The government plans to execute this as a single firm fixed-price contract with on-site construction expected to begin in June 2028. Critical constraints include operating the existing powerhouse throughout construction, limiting work to business hours (6:00 a.m. to 6:00 p.m. Monday through Friday), managing minimal space for equipment staging, and coordinating through single access roads with transport limitations due to bridge capacities. Environmental controls are emphasized due to work near water, and reliance on the government-furnished GSU transformer and intake gate/cylinder may influence schedule success. Industry input is being sought through virtual one-on-one sessions scheduled for May 4–5, 2026, with a designated overflow date of May 11, 2026. Companies must register by April 28, 2026, by submitting attendee information and any advance questions. A key focus of the feedback request involves the use of a Project Labor Agreement (PLA), with detailed questions on its potential impact on cost, labor availability, schedule efficiency, and contractor willingness to bid under such terms. Respondents are asked to provide experience with similar remote projects, insight into long-lead items, strategies to mitigate cost impacts from tiered markups, recommendations for design-build execution, and views on the adequacy of government-furnished documents such as the existing Revit model. The solicitation also explores technical challenges including construction in constrained spaces, delivery methods for heavy materials, potential use of skeleton bays, over-pressure testing of spiral cases under extreme head pressures, and the feasibility of transporting a single-piece 200-inch Francis turbine runner. Responses to PLA-specific questions must be directed to Leanne

General Info

U.S. Army Corps solicits industry input for 300MW hydro expansion at Dworshak Dam, Design-Build, 2028 construction start.

NAICS

236210 - Industrial Building Construction

Place of Performance

Ahsahka, ID, 83520, USA

Set-Aside

NONE

Documents

6

DWA Unit 4 Project Milestones

PDF, High priority: read this firstspecifications
High

DWA Unit 4 Project Overview - Concept Sketch

PDF, High priority: read this firstspecifications
High

DWR Unit 4 Concept Sketches Alternatives 1-3

PDF, High priority: read this first6 pages · specifications
High

Attachment C - Dworshak Civil Structural Existing Reference Drawings

PDF, Low priorityother
Low

Dworshak Photos - Existing Site & Historical Construction

PDF, Low priorityother
Low

Attachment+A.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

special-notice

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more

5/6/2026: Adding attachements


______________________________________________________


4/13/26: Update to clarify one-on-one session dates: 


The multi-functional team within the Walla Walla District and Hydroelectric Design Center will be conducting one-on-one sessions May 4-5, 2026, you will be sent your assigned date and time for these two days. May 11, 2026, has been set aside for overflow sessions only.


_____________________________________________________________________________________________________


Walla Walla District Dworshak Unit 4


Industry Day One-on-One Sessions Announcement


Registration and General Information


W912EF26RSN15


USACE Walla Walla District is developing multiple acquisitions to expand the generation capability of the Dworshak Dam Powerhouse by installing a fourth generating unit (Main Unit 4) and associated powerhouse structure extension.  Dworshak Dam is located on the Clearwater River in Ahsahka, ID, approximately 50 miles east of Lewiston, ID. Additional scope of work can be found on the following pages along with a list of questions and desired information the Government would like to learn about your company regarding this project.  This information is intended to provide you awareness of what the Government would like to learn.  However, you are encouraged to share more information if you believe it will help the Government in developing the solicitation packages.


The multi-functional team within the Walla Walla District and Hydroelectric Design Center will be conducting one-on-one sessions May 4-5, 2026, you will be sent your assigned date and time for these two days. May 11, 2026, has been set aside for overflow sessions only. , in order to share information on the government’s requirements and preliminary acquisition strategy, as well as to obtain industry feedback.  One-on-one sessions will be conducted virtually.  Each company will be allotted one (1) hour for the one-on-one session. Please limit the number of company representatives to no more than three (3) attendees in order to facilitate effective one-on-one dialogue.  The purpose of the one-on-one session is to answer questions and allow the government to obtain specific feedback from your company’s representative.  Marketing/capability briefings are not authorized during the one-on-one session.


For our planning purposes, you are requested to provide the following information if you are interested in participating in the one-on-one session:


  1. Name of Company
  2. Name of each individual attending, his or her contact number and e-mail addresses

Please provide the above information to contact@example.gov and contact@example.gov by April 28, 2026.  Please include the title, “Company Name – Industry Day Attendees” in the email subject line.  You will be notified of your scheduled one-on-one session within two (2) days of receipt of your request. 


If you have questions you would like to submit in advance, please provide them to the above e-mail addresses no later than April 28,2026. If you consider the questions proprietary, please clearly mark them as such.


Note: Project Labor Agreement (PLA) questions will need submitted by notice closing date (April 28,2026) see submission requirements for responding at the end of this notice.


Summary of Scope of Work:


The Government intends to accomplish this work in a single, firm fixed-price procurement with a proposed work breakdown and general scope as follows:


  1. Powerhouse Building Extension and Site Development – Design and construction of preparation of site, construction of powerhouse substructure, and erection of functional building envelope for powerhouse extension.
     
  2. Turbine-Generator – Design, supply, installation and commissioning of a hydroelectric generator with an approximate rating of 300MW.
     
  3. Balance of Plant – Design and construct auxiliary mechanical and electrical systems to support power generation and powerhouse operations.
     
  4. Contractor Access and Work Hour limitations: The office building will be occupied throughout the duration of the project.  Normal business hours for US Army Corps personnel will be 6:00am to 6:00pm Monday through Friday.  On-site construction activities will be limited to specific areas.
     
  5. On-site construction is estimated to begin in June 2028.

Existing Conditions, Constraints & Challenges


  1. The Government intends to extend the configuration and design of the existing powerhouse for Main Unit 4. 
  2. Operation of the existing powerhouse and associated operations and maintenance activities will continue throughout all construction related to the addition of Main Unit 4.  Contractor operations must minimize disruption to Government operations and personnel.
  3. Disruption of the power generating capacity of existing units will not be allowed except during specific defined times when the units are out of use. These periods will be referred to as “outages.” Additional outages necessary for construction may be coordinated by the contractor, subject to Government approval.
  4. The project site has very limited room for contractor operations and equipment staging adjacent to the powerhouse. Access to the powerhouse is currently through a single road which has minimal turnaround and parking spaces. Remote sites, either Government- or Contractor-provided, will likely be necessary for work crew parking, equipment staging, office trailers and tool storage.
  5. Contractor means and methods including the construction of temporary in-water structures in the tailrace or necessary site development of the skeleton bays may be considered to reduce cost and schedule impact of site constraints.
  6. Should it prove advantageous to project cost and/or schedule by providing additional site access, an unmaintained roadbed from the dam’s original construction remains along the east bank of the North Fork Clearwater River between the town of Ahsahka and Dworshak Dam’s spillway.
  7. Transportation and delivery routes for large or heavy equipment may be limited by the capacity of bridges and other public transportation infrastructure.
  8. The work will occur adjacent to, over, or in water. Environmental controls will be critical to avoid oil spills and other impacts.
  9. There may be other prime contractors on-site at the same time for other proposed procurements. Contractors will need to coordinate between other contractors and with the Government

General Questions


  1. The government will be utilizing a Design-Build contract. What are industry’s recommendations to make this approach most successful?
  2. What are the primary risks that drive contractor cost and pricing in a design-build environment? How could the government’s design or contracting terms mitigate those risks?
  3. The government is especially concerned about cost potentially introduced by prime contractor markup on top of turbine-generator manufacturer pricing. What strategies could your firm use to minimize costs due to tiered markups with a combined contract of this size?
  4. What are some areas the government should focus on to minimize risk that would lead to increased proposal pricing?
  5. Do you have existing relationships and past experience with other firms that allow your company or team of companies to be best suited to the full scope of work?
  6. How would a Defense Priorities Allocation System (DPAS) rating for this contract influence your execution, proposal and willingness to bid for this project?
  7. Including both design and construction phases of this contract and assuming the government-furnished GSU transformer and new intake gate/cylinder do not constrain the schedule, what duration would you expect for this contract from award to the completion of turbine-generator commissioning?
  8. Can you provide an estimate of the maximum onsite workforce necessary to perform this contract, and a quantified projection of how that may change over the contract period?
  9. Besides the turbine-generator and provision of the government-furnished GSU transformer, what long-lead items would you want to track most closely?
  10. Are there other long-lead items besides the GSU transformer recommended to be furnished by the government outside of this contract to accelerate schedule or mitigate other risks?
  11. What Contracting considerations does industry want to highlight to maximize participation in this design-build solicitation? (ex. correct NAICS codes, etc.)
  12. What length of proposal time for the Phase 2 solicitation would your organization request, given the scope?
  13. How much more likely would your organization be to participate in this solicitation if a stipend was offered for proposals developed for the Phase 2 solicitation?
  14. The government has developed a Revit model of the existing facility and is considering providing this as a reference during solicitation. Is this preferred? What other documentation of existing conditions would the design-build contractor request?
  15. Would you recommend an advance industry review of the solicitation before the RFP is issued? If so, what duration for that review would you recommend?

Design Process Questions:


  1. The scope of work encompasses three main elements: powerhouse extension and site work, turbine-generator, and balance of plant equipment. How would you structure the post-award design + review process and/or divide scope among design packages to enable fast-tracking of the critical path?
  2. Where design will address scope that is not prescribed by code, the government anticipates providing baseline specs that may in some cases be editable by the contractor’s designer. What experience can you share on the best way to clearly establish contractually required scope from draft spec language intended to be modified to fit the contractor’s proposed design?

Powerhouse Extension and Site Work Questions:


  1. Would site development of the unused skeleton bays adjacent the project site seem likely to be advantageous to cost or schedule of the overall project?
  2. What major temporary features would you anticipate the need to incorporate in your development plan for the construction site and support areas? (ex. batch plant, workforce camp, warehousing, fabrication facilities)
  3. The existing U3 500kV lines are 90’ to 100’ from the top of the parking lot (green). They are being relocated prior to or as part of this contract as shown below (red). The new lowest location will be the take off lines which are approximately 142’ from the parking lot surface. What activities are expected to require significant line outages (greater than 1 day). What is an approximate duration of the requested outage?
  4. What method of delivery would you anticipate employing to deliver the necessary quantities of concrete and other materials into the constrained construction site (ex. tram, cableway, truck & pump, temporary bridge or other structures, crane, turntable, etc.). What can the government’s design do to preserve the maximum flexibility you would prefer during construction?

                            SEE ATTACHMENT A 


Turbine - Generator Questions: 


  1. Are there certain design package submittals that would need to be completed earlier than other portions of the turbine-generator design to allow site construction to begin as early as possible?
  2. Does your team have experience fabricating ~200 inch Francis turbine runners; please provide a reference list including pertinent data?  Does your team have experience designing and manufacturing 300 MW generators; please provide a reference list including pertinent data?  How would your team integrate the turbine and generator designs?
  3. What techniques would be utilized to keep turbine/generator design to be optimized for costs?
  4. Would transportation of a single piece turbine runner to site be possible?
  5. Describe your experience over-pressure testing a spiral case for a 615.5 ft max head and the interaction with the embedding process.
  6. USACE understands there may be a reluctance from larger turbine-generator manufacturers to participate in this solicitation or others with the Corps. From a construction contractor perspective, can you describe how USACE could shape this design-build solicitation to encourage broader turbine-generator OEM interest and facilitate partnering efforts between the design-build contractor and the turbine-generator OEM? 

Balance of Plant Questions: 


  1. Describe your construction experience doing work in operating power generation facilities.  In general, it is the government’s assumption that almost all construction work will occur while Dworshak is operational.  This includes the overhead 500 KV lines which may limit crane access.  Is the contractor comfortable implementing this project with only a few limited short duration outages?
  2. The balance of plant equipment includes installation of isolated phase bus, medium voltage circuit breakers, unit substations, switchboards and interconnecting controls.  Describe your experience installing similar equipment in operating power plants. 
  3. Mechanical piping and electrical conduit around existing generators is concrete embedded.   Does the contractor have any concerns about this type of construction if required to adhere to a similar standard on the new generator.
  4. The Dworshak site is relatively remote, approximately 1 ½ hours from larger regional communities (Lewiston, Id. Moscow, Id.).   Does the contractor have experience managing large workforces at remote locations.  Is this an issue?
  5. The scope of the project involves installing a large 500kV 3-phase GSU transformer sized to the new turbine-generator unit. While the transformer supply would be contracted separately by the government, some amount of transportation and relocation may fall to the installation performed under this contract. This is more likely if site footprint constraints necessitate delivery to an off-site location and/or storage prior to installation. What extent of transportation study or analysis would you want to be performed as part of the government’s design? What timing and permitting issues should the Government anticipate?

Project Labor Agreement (PLA)


Submission Instructions for PLA:  Submit PLA responses in writing by the notice closing date (April 28,2026) and email to contact@example.gov


Please answer all questions if you do not have a response for some questions please indicate with “N/A”


PLA questions:


1) Do you have knowledge that a PLA has been used in the local area on projects of this kind?  If so, please provide supporting documentation. 


 2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project?  If so, please elaborate and provide supporting documentation where possible. 


 3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed?  If so, please elaborate and provide supporting documentation where possible. 


 4) Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 


 5) Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement. 


 6) Identify any additional information you believe the Government should take into consideration regarding the use of a PLA on the referenced project. 


 7) Does your company intend to bid/propose on this project if a PLA requirement is included in the solicitation? Does your company intend to bid/propose on this project if a PLA requirement is not included in the solicitation? 


 8) What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitation?  Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact.  


 (ii) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate): 


 1) Project Name and Location 


 2) Detailed Project Description 


 3) Initial Cost Estimate vs. Actual Final Cost 


 4) Was the project completed on time? 


 5) Number of craft trades present on the project 


 6) Was a PLA used? 


 7) Were there any challenges experienced during the project? 

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting bids for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at Dworshak Dam. This total small business set-aside project, under solicitation W912EF27QA0020001, requires the contractor to provide all personnel, materials, and equipment necessary to transport the bulkheads from the dam to their repair facility and return them upon completion. The scope of work includes the removal of existing coatings, performing weld repairs, and applying new coatings. The project is divided into phases with specific pickup and return windows occurring between November 2026 and July 2027. All transportation must be coordinated with the Contracting Officer at least 15 calendar days in advance and conducted Monday through Thursday during specified hours. Technical requirements are stringent, requiring 100 percent inspection of all welds using Visual Testing and Magnetic Particle Testing in accordance with AWS D1./D1.M. Coating applications must meet specific dry film thickness standards, with a minimum average of 7.0 mils for the completed system. The contractor must provide a third-party certified coatings inspector and ensure all paint materials are certified by the CERL Lab. To be considered technically acceptable, bidders must submit specific pre-award documentation, including SSPC QP 3 or AISC Complex Coating Endorsements, paint product datasheets for System 5-E-Z, manufacturer warranties, and qualifications for both weld inspectors and welding operators. Government representatives will conduct internal inspections at the contractor's facility following the removal of existing coatings.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 811310
New
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

6 days ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS