Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Colorado was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater Reclamation Facility Primary Scum Flushing Loop

Closed
26-005 (WWAN04)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project
Solicitation # W9123626BA011
The Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project, solicitation W9123626BA011, is an unrestricted invitation for bids issued by the U.S. Army Corps of Engineers, Norfolk District. The project involves dredging approximately 2.2 million cubic yards of medium-grained sand from Sandbridge Shoal Areas A and B, as well as various navigation channels and the Rudee Inlet, to nourish a 5.25-mile stretch of beach in Virginia Beach, Virginia. Key technical requirements include the creation of a 50-foot-wide berm at an elevation of 6 feet NGVD and a foreshore slope of 1 vertical foot to 20 horizontal feet. The scope of work encompasses mobilization, dredging, beach fill, and specialized environmental services, including sea turtle response, relocation, and trawling. The contract is a firm-fixed-price award based on the lowest responsive and responsible bidder, with a performance period of 365 calendar days. Bidders must provide pricing for all contract line item numbers, including base and option items such as an onboard MEC technician. Requirements include the submission of a bid guarantee, performance and payment bonds equal to 100 percent of the contract price, and adherence to Davis-Bacon Act wage determinations. Quality control is strictly managed through mandatory gradation tests and hydrographic and topographic surveys. Bids must be submitted electronically via the PIEE Solicitation Module by the specified deadline, and the successful contractor will be required to maintain minimum insurance coverage and comply with federal cybersecurity and environmental regulations.
W2SD Endist Norfolk

POSTED

about 3 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved site south of Oahu, and the repair of the revetted mole through clearing, grubbing, and stone rework. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. The contract is set aside for HUBZone Small Businesses and requires bidders to provide performance and payment bonds, as well as a bid guarantee. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Technical acceptance is based on pre- and post-dredge multi-beam surveys conducted by a third-party qualified surveyor, with strict adherence to USACE accuracy standards and stone quality specifications. Liquidated damages for delays are set at 2,297 dollars per calendar day. Bids must be submitted in sealed envelopes to the USACE Honolulu District office, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 1 day
NAICS: 237990
New
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build procurement issued by the Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Folsom, California. The project scope encompasses the removal and disposal of the existing crane, including the abatement of asbestos and other hazardous materials, and the design, fabrication, and installation of a new 30-ton bridge crane and its associated power supply. Additional requirements include performing a rail system survey with optional repairs or replacement, executing commissioning and load tests, and providing operation and maintenance training. The contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an estimated value between 1 million and 5 million dollars. The period of performance is 600 calendar days from the notice to proceed. Technical requirements are governed by Specifications No. 20-C0942, which detail standards for automation control systems, programmable logic controllers, and electrical components. Award evaluation is based on a technical approach narrative, past performance from the last six years, and price reasonableness. Offerors must provide a 100 percent performance bond and adhere to Davis-Bacon Act wage determinations. Proposals are submitted in three volumes covering business, technical, and pricing details, with a final response deadline of October 8, 2026.
Mp-Regional Office

POSTED

2 days ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
On-Call Emergency Facilities Repair Services Program For Stormwater Maintenance Division
Solicitation # BRC0000677
The County of Los Angeles Department of Public Works is soliciting proposals for the On-Call Emergency Facilities Repair Services Program for the Stormwater Maintenance Division under solicitation BRC0000677. This program seeks qualified firms to provide emergency repair services for a variety of infrastructure, specifically focusing on flood control and stormwater improvement facilities throughout the county. The County may award up to four contracts for a maximum total term of seven years, with the possibility of renewals and extensions. The aggregate annual amount the County will pay all contractors under this program will not exceed 49 million dollars. Proposals are evaluated based on a composite score where proposed price accounts for 50 points, experience for 15 points, the work plan for 10 points, and performance history and references for 5 points. Awarded contractors must comply with Cal/OSHA safety requirements, prevailing wage standards, and the Stormwater Maintenance Division’s Confined Space Manual. Additionally, proposers must demonstrate a record of hiring or a willingness to consider participants from the GAIN and START programs. Invoicing is performed monthly in arrears with payment terms of thirty days via electronic funds transfer. The submission deadline for proposals is October 22, 2026, and they must be submitted via the Infotech/BidExpress portal or as a PDF in a sealed envelope delivered to the Public Works Cashier's Office in Alhambra, California.
County of Los Angeles Department of Public Works

POSTED

3 days ago

DEADLINE

in 23 days
NAICS: 237990
New
SLED
Field 6 Rehabilitation Project
Solicitation # 26-PARKS-02
The Field 6 Rehabilitation Project, solicitation number 26-PARKS-02, is a construction contract issued by the City of Bishop, California, for the removal and replacement of a sports field located at 688 North Main Street. The scope of work includes comprehensive earthwork, grading, and soil import, as well as the installation of sod turf, irrigation systems, fencing, and bordering. Infrastructure improvements involve replacing storm drains, curb and gutter, and pavement patching, alongside electrical upgrades to provide site power. The project is estimated at 1,194,954.00 dollars and requires a 90-working-day construction period, with a specific requirement that turf sod installation begin no earlier than March 27, 2027. Following construction, the contractor must provide 120 days of landscape maintenance to ensure quality playing conditions. The contract will be awarded to the lowest responsive and responsible bidder. Eligible prime contractors must hold a Class A license, while C-27 and C-10 licenses are also required and may be fulfilled via subcontractors. Bids were due by October 15, 2026, and required a 10 percent bid security. All work must adhere to the 2024 Caltrans Standard Specifications and Plans, as well as City of Bishop standard details. The contractor is responsible for quality control and providing all samples, while the City provides quality assurance testing for concrete and compaction. Final acceptance is contingent upon a punch-list walk-through and the submission of final record drawings, product manuals, and controller schedules.
City of Bishop

POSTED

3 days ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Wastewater Reclamation Facility in Pueblo, Colorado is implementing a new scum flushing loop system to address chronic blockages in the 6-inch scum line connecting the Primary Clarifier to the DAF tanks. Currently, inadequate head pressure and limited backflushing capability result in solids compacting within the line, causing pump overloads and frequent shutdowns. The existing system includes a valve that diverts sludge from the Primary Clarifier directly to the DAF tanks, bypassing the Gravity Thickener during its annual maintenance period. The proposed upgrade introduces a new valve and loop configuration that directs high-volume water and sludge through the scum pump intake manifold, enabling aggressive flushing to prevent solid accumulation and maintain flow. This enhancement is designed to significantly reduce equipment strain, minimize operational downtime, and improve overall system reliability by restoring proper scouring action to the scum line. The solicitation, numbered 26-005 (WWAN04), was posted on June 23, 2026, with responses due by July 15, 2026, and is managed by the City of Pueblo’s Wastewater department under the SLED classification. The project aims to secure a contractor to design and install the new flushing loop system, with performance taking place at the facility in Pueblo, Colorado. Primary point of contact for technical inquiries is Jerry Roper, Maintenance Coordinator, reachable via phone or email, while Teresa May Burns, Director of Purchasing, handles procurement-related matters. The initiative reflects a strategic effort to modernize aging infrastructure, reduce maintenance burdens, and ensure uninterrupted wastewater treatment operations through targeted infrastructure improvements.

General Info

Install new scum flushing loop in Pueblo to prevent blockages and improve system reliability.

Documents

(10)

Federal Labor Standard Provisions for Construction Contracts

PDF•10 pages•wage-determination

IFB 26-005 (WWAN04) Wastewater Reclamation Facility Primary Scum Flushing Loop

PDF•ifb

Sample Contract Documents - City of Pueblo

PDF•8 pages•contract-document

Sample Contract Documents for CDOT Projects - Notice of Award and Contract Agreement

PDF•8 pages•contract-document

Section 3 Utilization Plan - City of Pueblo HUD Compliance Guide

PDF•16 pages•policy-guide

City of Pueblo Licensing and Sales Tax Information for Construction Contractors

PDF•6 pages•other

FFATA Reporting Form for City of Pueblo

PDF•1 page•ffata-reporting-form

IMG_1613_flushing_loop.jpeg

JPG

IMG_1614_flushing_loop_Jerry_Markup_(4).JPG

JPG

IMG_1614_flushing_loop.jpeg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Wastewater
Contacts2 people available
OfficePueblo, CO, 81003, USA
Organization / AgencyColorado → Wastewater
Office AddressPueblo, CO, 81003, USA
Contacts
Jerry RoperMaintenance Coordinator
Teresa May BurnsDirector of Purchasing

Interested Companies (5)

Show more
GSE Construction
Livermore, CA
CGRS
Fort Collins, CO
Wilson & Company, Inc., Engineers & Architects
Phoenix, AZ

See All 5 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Currently the flushing system utilizes a 6" scum line from the Primary Clarifier to the DAF tanks and without regular flushing the solids can get compacted, causing pumps to overload and shut off. The system only provides back flushing to the pumps with very little head pressure to scour or push the solids forward. The system has a valve between the Primary Clarifier, DAFT tanks, and Gravity Thickener so that if necessary, the sludge that is normally sent to the Gravity Thickener can be sent directly to the DAF tanks. This allows the Gravity Thickener to be shut down for annual maintenance/refurbishing. A new valve and loop system will allow sludge and water through the intake manifold of the Scum Pumps for high volume cleaning and flushing to avoid solid buildups that stop the Scum Pumps. It is anticipated that the new valve and loop system will significantly reduce maintenance and down time.

More opportunities from Colorado → Wastewater

Same awarding agency

NAICS: 238220
New
SLED
Replacement of Johnson Control Actuator Valves at WRF
Solicitation # 26-049
The City of Pueblo is soliciting bids under solicitation number 26-049 for a qualified commercial plumbing or mechanical contractor to replace eight obsolete Johnson Controls actuator valves in the hot-water circulation loop at the Wastewater Reclamation Facility Administration Building. The project requires the installation of Johnson Controls Series M100 valves, or approved equivalents, that are compatible with the existing 120V power supply and 24V thermostat-control system. The selected contractor must perform a site assessment to verify valve sizes and electrical characteristics, integrate the new valves with the HVAC control system, provide a detailed commissioning report, and conduct operation and maintenance training for city staff. All work must comply with the latest editions of the International Building Code, International Mechanical Code, and National Electrical Code, as well as ANSI and OSHA standards. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical compliance, and past performance. Equipment and materials must be delivered within 30 days of the award, and all work must be completed within 60 days following delivery. Performance is restricted to regular business hours, from 8:00 AM to 5:00 PM, Monday through Friday. Bidders must submit their responses electronically by October 14, 2026, and must hold all necessary licenses and certifications required by the State of Colorado and the City of Pueblo. Final acceptance is contingent upon a joint inspection by the contractor and a city representative to verify proper unit operation and the removal of all debris and waste from the site.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS