Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater Reclamation Facility Primary Scum Flushing Loop

Closed
26-005 (WWAN04)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863039 BRANNAN ISLAND SRA - Marina Rehabilitation
Solicitation # C26863039
The California Department of Parks and Recreation is soliciting bids for the Marina Rehabilitation project at Brannan Island SRA in Sacramento County, California. The scope of work involves the rehabilitation of a half-acre marina, including the demolition of existing docks and piles, the installation of a new dock system, guide piles, and a security gate, and the reuse of the existing gangway and ramp landing structure to ensure ADA compliant access. Additional requirements include dredging and storing dredged material, installing security cameras and LED luminaires, furnishing a fire standpipe system, and performing drainage modifications to the unpaved parking lot and trail repairs. The project requires hydrographic surveys performed by a California registered Independent Surveyor using DGPS capability. Bids are due by 2:00 p.m. on January 7, 2027, and must be submitted electronically in PDF format to [email hidden]. The contract will be awarded using the Low Price Method to the lowest responsive and responsible bidder. A mandatory 6% Disabled Veteran Business Enterprise (DVBE) participation goal is required for a bid to be considered responsive, though an incentive is provided for exceeding this goal. Additionally, a 5% Small Business Preference is available for certified small businesses. All contractors and subcontractors must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. Payment and performance bonds, as well as a Certificate of Insurance, are required.
California Department of Parks & Recreation

POSTED

1 day ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Wastewater Reclamation Facility in Pueblo, Colorado is implementing a new scum flushing loop system to address chronic blockages in the 6-inch scum line connecting the Primary Clarifier to the DAF tanks. Currently, inadequate head pressure and limited backflushing capability result in solids compacting within the line, causing pump overloads and frequent shutdowns. The existing system includes a valve that diverts sludge from the Primary Clarifier directly to the DAF tanks, bypassing the Gravity Thickener during its annual maintenance period. The proposed upgrade introduces a new valve and loop configuration that directs high-volume water and sludge through the scum pump intake manifold, enabling aggressive flushing to prevent solid accumulation and maintain flow. This enhancement is designed to significantly reduce equipment strain, minimize operational downtime, and improve overall system reliability by restoring proper scouring action to the scum line. The solicitation, numbered 26-005 (WWAN04), was posted on June 23, 2026, with responses due by July 15, 2026, and is managed by the City of Pueblo’s Wastewater department under the SLED classification. The project aims to secure a contractor to design and install the new flushing loop system, with performance taking place at the facility in Pueblo, Colorado. Primary point of contact for technical inquiries is Jerry Roper, Maintenance Coordinator, reachable via phone or email, while Teresa May Burns, Director of Purchasing, handles procurement-related matters. The initiative reflects a strategic effort to modernize aging infrastructure, reduce maintenance burdens, and ensure uninterrupted wastewater treatment operations through targeted infrastructure improvements.

General Info

Install new scum flushing loop in Pueblo to prevent blockages and improve system reliability.

Documents

10
PDF, High priority: read this first10 pages · wage-determination
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first8 pages · contract-document
High
PDF, High priority: read this first8 pages · contract-document
High
PDF, High priority: read this first16 pages · policy-guide
High
PDF, Low priority6 pages · other
Low
PDF, Low priority1 page · ffata-reporting-form
Low
JPG
JPG
JPG

Read all 10 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Multiple Award Construction Subcontract (same as above)Open now
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 16 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Wastewater
Contacts2 people available
OfficePueblo, CO, 81003, USA

Interested Companies (5)

CGRSFort Collins, CO
Fischer Enterprises
GSE ConstructionLivermore, California

See All 5 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Currently the flushing system utilizes a 6" scum line from the Primary Clarifier to the DAF tanks and without regular flushing the solids can get compacted, causing pumps to overload and shut off. The system only provides back flushing to the pumps with very little head pressure to scour or push the solids forward. The system has a valve between the Primary Clarifier, DAFT tanks, and Gravity Thickener so that if necessary, the sludge that is normally sent to the Gravity Thickener can be sent directly to the DAF tanks. This allows the Gravity Thickener to be shut down for annual maintenance/refurbishing. A new valve and loop system will allow sludge and water through the intake manifold of the Scum Pumps for high volume cleaning and flushing to avoid solid buildups that stop the Scum Pumps. It is anticipated that the new valve and loop system will significantly reduce maintenance and down time.

More opportunities from Colorado → Wastewater

Same awarding agency

NAICS: 237110
New
SLED
Wastewater Reclamation Facility Improvements for Digester Covers, Mixer, Polymer Building, and Electrical
Solicitation # 26-042
The City of Pueblo is soliciting bids for the Wastewater Reclamation Facility (WRF) Improvements project, identified as solicitation 26-042. The scope of work includes comprehensive electrical and instrumentation upgrades, including the replacement of Motor Control Centers (MCC) and Area Control Panels (ACP) in the Old Headworks and Primary Clarifier buildings, as well as updated SCADA connectivity and HVAC replacements. The project also involves upgrading digester mixing systems, improving the solids area polymer system, and performing sitework consisting of buried piping and pavement demolition, replacement, and the construction of a new cast-in-place foundation. While the City will purchase the digester covers and limited special services under a separate contract, the selected contractor is responsible for all remaining work beyond the cover manufacturer's scope. The contract will be awarded to the responsible bidder who submits the lowest and most responsive bid based on the total base bid and any selected alternates. Bidders must comply with the Davis-Bacon Act, 2010 ADA Standards for Accessible Design, and the City's Section 3 utilization plan for low-income persons and businesses. Contractors are required to provide performance and payment bonds within ten business days of the notice to proceed and must adhere to specific technical standards, including ASME A13.1 for piping markers and the Owner's SCADA cybersecurity standards. Bids are due by December 2, 2026, and must be submitted electronically via the OpenGov procurement portal. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 24 days
View Details
NAICS: 238220
New
SLED
Replacement of Johnson Controls Actuator Valves at WRF - Rebid
Solicitation # 26-049R
The City of Pueblo is seeking a qualified commercial mechanical or plumbing contractor for solicitation 26-049R to replace eight obsolete Johnson Controls actuator valves at the Wastewater Reclamation Facility's Administration Building. The existing valves, installed in the late 1980s, have reached the end of their service life and are no longer repairable due to a lack of available parts. The project requires the installation of Johnson Controls Series M100 valves or approved equivalents that are compatible with the existing 120V power supply and 24V thermostat-control transformers. The scope of work encompasses field verification, the provision of all necessary labor, materials, and equipment for a complete installation, and integration with the current hot-water circulation and heating-control systems. The contract will be awarded to the lowest responsive and responsible bidder whose proposal is most advantageous to the city. Evaluation factors include the bidder's capacity to perform, price, and a review of past performance, which may include up to three references. Bidders must submit sealed bids via the City's e-Procurement portal by December 2, 2026, with a question deadline of November 24, 2026. Requirements include compliance with non-discrimination policies, maintenance of all necessary licenses and insurance in Pueblo, and adherence to safety and environmental standards, including the provision of Material Safety Data Sheets where applicable. There is no specific set-aside status for this solicitation.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

4 days ago

DEADLINE

in 10 days
View Details
NAICS: 237110
New
SLED
Oxic Basin Egger Valves for Wastewater Reclamation Facility (WRF)
Solicitation # 26-062
The City of Pueblo is seeking a contractor for the Oxic Basin Egger Valves project at the Wastewater Reclamation Facility (WRF) in Pueblo, Colorado. The project involves replacing existing 8-inch butterfly valves with eight new 6-inch Egger Brand iris combination pressure reducing and pressure sustaining valves, along with eight Auma brand actuators and Felker custom spool pieces. This upgrade is designed to improve airflow control and energy efficiency, as the current butterfly valves lack the turndown capability required for the facility's current lower airflow demands. The installation of iris valves is expected to provide more linear, laminar airflow, which will optimize the activated sludge process and potentially reduce blower energy consumption by up to 20 percent. The contract will be awarded to the responsible bidder who submits the lowest and most responsive bid. Bidders must provide a bid security of 5 percent and adhere to strict submission guidelines by the December 9, 2026, deadline. The successful contractor must furnish payment and performance bonds within ten business days of the notice of award. Compliance requirements include adherence to the Davis-Bacon Act for labor standards, OSHA safety regulations, and the City's Section 3 Utilization Plan for low-income employment. Additionally, contractors must comply with local licensing and sales tax requirements, including a 3.7% city sales and use tax. There is no specific set-aside status designated for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS