This Solicitation opportunity from Colorado was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Wastewater Reclamation Facility Primary Scum Flushing Loop
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Wastewater Reclamation Facility in Pueblo, Colorado is implementing a new scum flushing loop system to address chronic blockages in the 6-inch scum line connecting the Primary Clarifier to the DAF tanks. Currently, inadequate head pressure and limited backflushing capability result in solids compacting within the line, causing pump overloads and frequent shutdowns. The existing system includes a valve that diverts sludge from the Primary Clarifier directly to the DAF tanks, bypassing the Gravity Thickener during its annual maintenance period. The proposed upgrade introduces a new valve and loop configuration that directs high-volume water and sludge through the scum pump intake manifold, enabling aggressive flushing to prevent solid accumulation and maintain flow. This enhancement is designed to significantly reduce equipment strain, minimize operational downtime, and improve overall system reliability by restoring proper scouring action to the scum line. The solicitation, numbered 26-005 (WWAN04), was posted on June 23, 2026, with responses due by July 15, 2026, and is managed by the City of Pueblo’s Wastewater department under the SLED classification. The project aims to secure a contractor to design and install the new flushing loop system, with performance taking place at the facility in Pueblo, Colorado. Primary point of contact for technical inquiries is Jerry Roper, Maintenance Coordinator, reachable via phone or email, while Teresa May Burns, Director of Purchasing, handles procurement-related matters. The initiative reflects a strategic effort to modernize aging infrastructure, reduce maintenance burdens, and ensure uninterrupted wastewater treatment operations through targeted infrastructure improvements.
General Info
Agency
Place of Performance
Set-Aside
Documents
10AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Multiple Award Construction Subcontract (same as above)Open now
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 16 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (5)
See All 5 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from Colorado → Wastewater
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
