Water Control Structure Modification
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract involves the modification of water diversion structures for prime contractors working on Wildlife Conservation Board projects in California. The primary objective is to alter existing California Department of Fish and Wildlife diversion structures to ensure the sustainability of upstream wetland conditions and the protection of local fish populations. The scope of work includes the installation of culverts, water control gates, or diversion piping, all of which must adhere to strict hydraulic engineering specifications and fish passage standards. The final deliverable is a modified diversion structure capable of effectively maintaining necessary wetland water levels.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of 2025067.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Pickel Meadow Restoration Project
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
