Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on March 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WEDGE Renew Piping Insulation

Closed
70Z085Q250011548Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
The U.S. Navy, through the Navsup Fleet Logistics Center Naples, is soliciting a Firm-Fixed-Price contract for a Vessel Voyage Repair Availability (VRA) for the USS Mt Whitney (LCC 20). The work will be performed in Gaeta, Italy, with a period of performance from December 1, 2026, through December 15, 2026. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, featuring tasks such as barometer calibration, steel repairs, fire room drain piping repairs, LPAC hose hydrostatic testing, and insulation repairs. The contractor must adhere to strict technical standards, including MIL-STD-869 for thermal insulation, ANSI and ISO requirements for calibration, and US Coast Guard and COLREGS Navigation regulations. Award will be based on the Lowest Price Technically Acceptable (LPTA) basis. To be considered, quoters must be rated acceptable regarding their technical capability, which requires providing proof of ISO 9001 or 14001 Quality Management Systems, ABS welding certifications, and laboratory qualifications for calibration. The contract emphasizes rigorous safety and environmental compliance, requiring certified Marine Chemists for gas-freeing and strict adherence to international and local regulations for the handling and disposal of hazardous materials. Invoicing must be processed electronically via Wide Area Work Flow (WAWF). Quotes are due by November 2, 2026, and must include completed Standard Forms 18 and 30, along with specific representations and certifications regarding tax status and defense telecommunications equipment.
Navsup Flc Sigonella Naples Office

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is soliciting proposals for a comprehensive propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project requires a factory-certified Honda Marine Authorized Dealer to decommission and remove two existing Honda BF250A outboard engines and replace them with new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing the removal of legacy rigging, a structural assessment of the transom, installation of new engines and Honda iST electronic control heads at dual helm stations, integration with the existing SeaStar PA1315-2 Power Assist steering and NMEA 2000 network, and a complete fuel system overhaul using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The selected contractor must provide a secure facility for vessel storage and adhere to strict insurance requirements, including at least 1 million dollars in commercial general liability and business auto liability. Financial protections include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Proposals are due by November 13, 2026, and will be evaluated based on a 100-point scale considering technical capability and budget, with specific preferences given to responsible Indian Offerors under TERO and tribal preference laws. All disputes are subject to the jurisdiction of the Colville Tribal Court, and payments are contingent upon the availability of tribal funds.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves providing technical support for the renewal and repair of piping and overhead insulation on the USCGC WEDGE, a Coast Guard vessel located in Mobile, Alabama. The work scope includes removing existing insulation from specified piping systems, installing new insulation in accordance with detailed drawings and standards, and ensuring all surfaces are properly cleaned and painted post-installation. Additionally, the contractor will replace overhead panels and install new overhead insulation in designated areas, with a focus on maintaining vessel habitability and compliance with applicable specifications and standards. The project emphasizes safety, contamination prevention, and proper disposal of removed materials, with the work scheduled to occur between April 1 and April 14, 2025, during regular working hours, though flexibility for additional hours is permitted. The contractor must supply all necessary materials, tools, and qualified personnel, while the government will provide certain panels and oversee acceptance through inspections. Deliverables include a trip report and warranty documentation, with the contract set as a small business set-aside under NAICS code 336611.

General Info

WEDGE Renew Piping Insulation contract seeks small business bids by March 13, 2025.

NAICS

336611 - Ship Building and Repairing

Place of Performance

Mobile, AL, 36615, USA

Set-Aside

SBA

Documents

1

USCGC WEDGE Piping and Overhead Insulation SOW

DOCX, High priority: read this first4 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA

Full Description

Show more
THIS IS TO BE AWARDED OFF OF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE. STATEMENT OF WORK (SOW) FOR USCGC WEDGE Renew Piping Insulation, Overhead Insulation and Conduct Overhead Repairs WEDGE has an immediate need for technical support for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL Background The 75 WLR asset, USCGC WEDGE needs approximately 500 linear feet of pipe insulation, 1500 square feet of overhead insulation, and 300 sq ft of overhead panels. Scope The scope of this contract is defined by the efforts and tools required to support USCGC WEDGE (WLR 75307). The Contractor shall provide all labor, materials, and tools necessary to install insulation and bulkhead panels. Table 1 -Pipe Insulation Renewal Description (System/ Pipe Diameter/ Linear Feet) Location Drawing Tender Chill Water/ Potable Water Piping / .5 in / 50 ft Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room See below Tender Chill Water/ Potable Water Piping / .75 in / 50 ft Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room See below Tender Chill Water/ Potable Water Piping / .875 in / 50 ft Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room See below Tender Chill Water/ Potable Water Piping / 1 in / 100 ft Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room See below Tender Chill Water/ Potable Water Piping / 1 .25 in / 125 ft Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room See below Tender Waste Water Piping / 1.5 in / 50 ft Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room See below Tender Waste Water Piping / 1.75 in / 25 ft Galley/Mess deck/Crew Berthing/ Crew See below Tender Waste Water Piping / 2.0 in / 50 ft Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room See below Table 2 - Overhead Insulation Renewal Description (Area/Approximate Square feet) Location Insulation Material Overheads/1500 sq feet Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room BFG 261 (MIL-C-20079) or equivalent Table 3 - Overhead Repairs Description (Area/Approximate Size) Location Drawing 300 sq ft of overhead panels Galley/Mess Deck See below OBJECTIVE The goal is to return CGC WEDGE habitability areas to an appropriately insulated area. APPLICABLE DOCUMENTS Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details Coast Guard Drawing 75D-WAGL-3801-1 Vent Heating & A/C Coast Guard Drawing 75D-WAGL-3901-1, Insulation & Sheathing Schedule (75306-75307) Coast Guard Drawing 75D-WAGL 3902-1 Rev 1, JOINER DETS ENG RM (75306-75307 Coast Guard Drawing 75D-WAGL 3902-2 Rev 2, JOINER DETS MN DK & UPPER DK (75306-75307) Coast Guard Drawing 75D-WAGL 3902-3 Rev 2, JOINER DETS WHEELHOUSE (75306-75307) SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC WEDGE (WLR 75307) in Mobile, AL. 2.1 RENEW CHILLWATER PIPING IINSULATION The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). NOTE Although most of the chill water piping is exposed due to previous remediation work; the Contractor will have to remove some overhead and bulk head paneling to access some of the piping. Renewal. The Contractor shall renew all piping system insulation identified in Table 1 and using the relevant Coast Guard Drawing(s) as guidance. NOTE Although pipe lengths, routes, and sizes are detailed in the specified drawings, the as-built configuration may vary slightly in routes, lengths, and sizes. Removal. The Contractor shall remove all existing insulation material over the designated pipe surfaces, including associated pipe hangers, valves, fittings, and flanges. Disposal. The Contractor shall dispose of all removed materials in accordance with all applicable federal, state, and local regulations. NOTE Other surfaces/fittings affected include: brackets, bulkhead penetrations, flat work, and all other protrusions or fixtures that will condense due to relative humidity from surrounding atmosphere. Surface preparation. The Contractor shall clean all exposed pipe and pipe component surfaces with a soft bristle brush and a mild detergent solution to remove all visible surface contaminants. New insulation installation - interior refrigerant, hot water and cold and chill water piping systems (Temperature Range: -20 to +180 Deg. F). The Contractor shall install new insulation material over the exposed pipe surfaces, including associated pipe hangers, valves, fittings, and flanges, in accordance with details in NAVSEA Drawing 804-5959214; select appropriate insulation materials and thicknesses for the application and temperature ranges specified in ASTM F683, Tables S1.1 and 5. Preservation. The Contractor shall paint the newly installed insulation system, in accordance with SFLC Std Spec 6310, using the system specified for - Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam in Appendix B (Cutter and Boat Interior Paint Systems). 2.2 RENEW OVERHEAD INSULATION The Contractor shall ensure all pipe insulation has been renewed by preforming a walkthrough of all spaces identified in section 2.1 with the Engineer Petty Officer (EPO) or the EPO's designated representative. Renew insulation. The Contractor shall renew/install overhead insulation as identified in Table 2 and using the relevant Coast Guard Drawing(s) as guidance. Overhead Repairs The Contractor shall remove all overhead panels in all spaces identified (exception being Galley). The contractor shall identify all overhead mounted components to include but not limited to overhead cables, light fixtures, detectors, etc. and install brackets or new mounts to accommodate new overhead insulation. The contractor shall identify paint any remaining exposed surfaces as necessary. Renew galley overhead panels. The Contractor shall replace overhead panels that were previously removed as identified by ships force and Table 3. CONTRACTOR PERSONNEL 3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. OTHER APPLICABLE CONDITIONS 4.1 PERIOD of Performance The period of performance for this contract shall start April 1, 2025 and end no later than 14 days after commencement of work. 4.2 PLACE OF PERFORMANCE The primary place of performance will be at CGC WEDGE at 1500 15TH St., Mobile, AL 36615 unless an alternate location is approved by the Coast Guard. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship's operations. 4.4 TRAVEL Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government. 5.0 GOVERNMENT FURNISHED RESOURCES Bulkhead and Overhead panels previously removed during remediation efforts. 6.0 CONTRACTOR FURNISHED PROPERTY The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0. GOVERNMENT ACCEPTANCE PERIOD The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted. 8.0 DELIVERABLES The Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office. RDD/POP: 04/01/2025- 04/14/2025 Delivery address and ATTN to: MKC Zachary Mason CGC Wedge (WLR-75307) 1500 15TH St., Mobile, AL 36615 +1 (555) 000-0000

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS