This Solicitation opportunity from Utah was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Well #10 - Exterior Cathodic Protection System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the installation of an exterior cathodic protection system for Orem City Well #10, targeting the construction and commissioning of an impressed current, deep well anode grounded system complete with a new anode, well casing header cables in rigid hot-dipped galvanized conduit, a new well casing test wire, a rectifier, and a junction box. The work must be performed in Utah within 90 days of the Notice to Proceed, with strict adherence to technical specifications and drawings prepared by Hansen, Allen & Luce, Inc. and Infinity Corrosion, designated as CP-1 through CP-5. All components must meet detailed packaging and labeling requirements, including original manufacturer tags on rectifiers and junction boxes, coiled and bound lead wires, and marked downhole wires with footage identification. The deep anode well must be drilled by a Utah-licensed water well driller in compliance with state regulations. Payment is structured around progress estimates submitted no more than monthly and at least ten days prior to each due date, requiring detailed documentation of work performed, materials stored on-site, and all change orders listed separately with values rounded to the nearest dollar. The Engineer has ten days to approve or deny each payment request with written justification. The contractor is required to submit comprehensive testing reports and a final field report documenting system installation and performance, with functional testing verified by a certified Corrosion Expert to ensure AC power delivery to the rectifier and full DC output capacity. All work is subject to inspection, and the contractor must provide a seven-day advance notice prior to final acceptance testing, which involves participation from the Owner, Engineer, and the contractor’s superintendent and quality control personnel. A punch list must be prepared prior to final inspection, and all deficiencies rectified before acceptance. The system carries a one-year warranty from substantial completion, backed by a performance bond and payment bond equal to the total contract amount, issued by a surety company listed in Treasury Department Circular 570 and executed within ten days of award. Insurance requirements include commercial general liability, business auto, and workers’ compensation coverage meeting ISO standards, with the contractor responsible for all associated costs. Wage rates must meet or exceed the general prevailing rate in the area, and all work must comply with OSHA and other federal, state, and local safety codes. Bids must be submitted via Bonfire or in person by the July 7 deadline, accompanied by a completed Contractor Qualification Form with Items 1, 2, and 6 filled out, and
General Info
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
