Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wellhead and Pump Station Maintenance

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221111
SLED
Relicensing of Helms Pumped Storage ProjectThe project involves the relicensing of Pacific Gas and Electric Company’s Helms Pumped Storage Project under FERC No. 2735, with the goal of continuing operations while enhancing environmental protections and public access. PG&E seeks to maintain water transfers between Courtright Lake and Lake Wishon for power generation and storage, while replacing and rehabilitating recreation facilities, redesignating approximately 36 miles of roads and one mile of trails as official Project infrastructure, and adjusting the FERC Project boundary to better reflect operational needs. The Project includes underground tunnels, penstocks, a powerhouse, switchyard, transmission lines, and ancillary facilities, all situated within Fresno and Madera Counties along the North Fork Kings River. Environmental compliance is central to the license renewal, requiring adherence to a suite of state and federal regulations including the Clean Water Act, Endangered Species Act, and California Environmental Quality Act. Numerous condition-specific obligations are embedded in the licensing framework, enforced through detailed exhibits that serve as operational mandates rather than standard federal contract clauses. These include maintaining minimum water flows and quality, implementing adaptive management strategies, monitoring fish populations and hatchery performance, protecting endangered and threatened species, conducting archaeological surveys, controlling erosion, restoring disturbed areas, and limiting noise and seasonal operations. PG&E is responsible for annual reporting, public notifications, emergency response, cultural resource protection, wildlife habitat management, and providing public recreation access under approved plans. Oversight is coordinated by the State Water Resources Control Board, with key contacts for environmental compliance and project management provided. Submissions for environmental certification are due by December 19, 2025, and compliance is measured through annual reports and agency inspections rather than traditional procurement metrics. While no formal contract value, pricing structure, or acquisition type is specified, the project’s scope implies long-term operational and environmental management responsibilities spanning the lifetime of the new FERC license, with no indication of small business set-asides or socioeconomic classifications applying to the contractor.
State Water Resources Control Board

POSTED

about 1 month ago

DEADLINE

N/A
NAICS: 221111
SBIR / STTR
Energy Technologies
Solicitation # EN
The Energy Technologies solicitation seeks innovative proposals across a broad spectrum of energy generation, storage, and conversion systems with a focus on mobile and off-grid applications. It welcomes ideas that offer compelling advantages over existing solutions, particularly in emerging areas such as carbon conversion, disruptive improvements to conventional energy resources like natural gas extraction, and nature-inspired processes aimed at reducing carbon and resource intensity throughout the energy lifecycle. Proposals that integrate data and computational technologies with energy systems are strongly encouraged, especially where the synergy between digital innovation and energy application is central to the proposed solution. The scope spans from microscopic energy storage for wearable devices to large-scale power plant technologies, emphasizing technological scalability and sustainability. This is a small business set-aside opportunity under the SBIR/STTR mandate, restricted to organizations with fewer than 500 employees, and is classified under NAICS code 221111 for electric power generation. Managed by the National Science Foundation, the solicitation was posted on May 22, 2026, with a submission deadline of July 7, 2027. While no specific physical place of performance is required, applicants must demonstrate the potential for practical implementation and impact in the U.S. energy landscape. The initiative prioritizes breakthroughs that advance clean, efficient, and resilient energy technologies while fostering innovation within small businesses to address critical national energy challenges.
National Science Foundation

POSTED

3 months ago

DEADLINE

in 10 months
NAICS: 221111
SLED
Camp Far West Hydroelectric Relicensing Project
Solicitation # CFW-amend_2021100570_NOD_signed
The Camp Far West Hydroelectric Project, a 6.8-megawatt facility on the Bear River in Yuba County, California, operates under a revised water quality certification issued by the State Water Resources Control Board on October 22, 2025, amending the original certification dated May 16, 2022. The project includes Camp Far West Reservoir, dam, spillway, intake tower, powerhouse, switchyard, and two recreation areas, and the amendment primarily updates two conditions: Condition 2(D) concerning the evaluation of flows under State Clearinghouse Number 2021100570 and Condition 16 regarding the auxiliary spillway project under SCH No. 2018092009. The South Sutter Water District serves as the Lead Agency, with oversight and approval responsibilities resting with the State Water Resources Control Board, which determined that the amended certification complies with the California Environmental Quality Act, supported by a Negative Declaration finding no significant environmental impacts. There is no formal contract value, pricing structure, or procurement mechanism identified, as this is an environmental regulatory action rather than a federal procurement contract; consequently, no Federal Acquisition Regulation clauses, payment terms, invoicing systems, or contractor assessment criteria apply. Performance obligations center on continued compliance with revised flow conditions and spillway design standards to ensure water quality and ecological integrity, with no specified timeline for implementation or delivery milestones outlined. While physical access to supporting environmental documentation such as the Environmental Impact Report and Negative Declaration is available at the Water Rights Library in Sacramento, there are no formal packaging, inspection, acceptance, or reporting procedures defined within the regulatory amendment itself. Key point of contact for environmental compliance is James Kyle Noss, Environmental Scientist at the State Water Resources Control Board, and Hayden Cornwell of the South Sutter Water District, though neither is formally designated as a contracting officer or representative. The project operates under state environmental law and Federal Energy Regulatory Commission licensing, but no federal acquisition systems, contractual forms, clauses, or socioeconomic certifications are involved, distinguishing it from traditional contracting frameworks.
South Sutter Water District

POSTED

10 months ago

DEADLINE

N/A
NAICS: 221111
SLED
Yuba River Development Project and the Narrows Hydroelectric Project FERC Relicensings
Solicitation # 2025FG-00026
The Yuba County Water Agency is seeking relicensing from the Federal Energy Regulatory Commission for the Yuba River Development Project and the Narrows Hydroelectric Project for 50-year terms. Located across Yuba, Sierra, and Nevada Counties, the projects aim to ensure the continued operation and maintenance of hydropower facilities. While the Narrows Project requires no new facilities, the Yuba River Development Project includes the construction of a new Tailwater Depression System at the New Colgate Powerhouse, installation of outlet pipes at the Our House and Log Cabin Diversion Dams, and the replacement of a gate at the Lohman Ridge Diversion Tunnel. Additionally, the agency plans to enhance recreation at New Bullards Bar Reservoir by adding two campgrounds, a picnic site, and a trail. The projects are subject to rigorous environmental compliance under CEQA and NEPA, requiring adherence to the Clean Water Act Section 401 and the Federal Power Act Section 4(e). Key regulatory requirements include permits from the USACE, USFS, and CDFW. A Mitigation Monitoring and Reporting Program has been established to manage impacts on biological resources, including mandatory preconstruction surveys for semi-aquatic species and migratory birds, and strict prohibitions on heavy equipment operation in flowing water. Contractors must also implement utility coordination plans and follow the USFS Transportation System Management Plan for work on National Forest System lands. The project has undergone public review and received a Notice of Determination certifying that it will not have a significant environmental effect provided mitigation measures are adopted.
Yuba County Water Agency

POSTED

10 months ago

DEADLINE

N/A

AI Contract Overview

Show more

This contract focuses on the preventive and corrective maintenance of wellheads, submersible pumps, and control systems at California Highway Patrol (CHP) water sites. The goal is to ensure the continuous and reliable operation of water supply systems essential for CHP facilities. It covers routine upkeep as well as repairs to maintain optimal functionality and prevent service disruptions. Scheduled as a subcontract opportunity with the NAICS code 221111, the contract was announced on May 20, 2026, with proposals due by July 7, 2026. The Department of the California Highway Patrol is the contracting agency overseeing this effort. While specific location details and point of contact information were not provided, the contract is aimed at supporting critical infrastructure maintenance within CHP water operations in California.

General Info

Preventive and corrective maintenance of CHP water system components, proposals due July 7, 2026.

Agency

Department of the California Highway PatrolView Agency

NAICS

221111 - Hydroelectric Power GenerationView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26C875000.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REBID Invitation for Bids (IFB) Number 26C875000 entitled, CHP Mountain Pass, Joint Port of Entry (JPOE) Water Testing Services and Osmosis System Maintenance

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment of the California Highway Patrol
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department of the California Highway Patrol
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Preventive and corrective maintenance of wellheads, submersible pumps, and control systems across CHP water sites to ensure reliable water supply operations.

More opportunities from Department of the California Highway Patrol

Same awarding agency

NAICS: 561730
New
SLED
26C450001 - CHP Madera - Landscaping Services
Solicitation # 26C450001
The Department of the California Highway Patrol is soliciting bids from certified Small Businesses, Micro Businesses, or Small Business Public Works entities for landscaping services at the CHP Madera Area Office. The project focuses on creating a low-water-use landscape, which involves removing approximately 9,500 square feet of turf, weeds, and dead plants, and converting the existing sprinkler system to a commercial-grade drip irrigation system. Key deliverables include the installation of specific plant species, the planting of palm and pine trees flanking the CHP sign, and the construction of a border around the southwest corner sign. The work must be completed within 45 working days and is subject to a two-year warranty on equipment and labor, with a 90-day guarantee on plants. The agreement is intended to be effective from November 1, 2026, to October 31, 2027, with performance occurring during normal business hours. Award will be granted to the responsive and responsible bidder offering the lowest cost. Bidders must submit their proposals via email in a non-fillable PDF format by the deadline, ensuring all required certifications, including DGS and DVBE status, and the Payee Data Record are included. The contract requires compliance with prevailing wage laws, the Americans with Disabilities Act, and various building and safety codes. Additionally, performance and payment bonds are required if the contract exceeds specific monetary thresholds, and all personnel must undergo security clearance before accessing state premises.
Landscaping Services

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
SLED
CHP Hollister-Gilroy Area office - Roof Repair Services - IFB #26C725001
Solicitation # 26C725001
The Department of the California Highway Patrol (CHP) is soliciting bids under IFB 26C725001 for roof repair services at the CHP Hollister-Gilroy Area office located at 740 Renz Lane, Gilroy, CA 95020. The scope of work includes removing and disposing of rocks from the roof surface, pressure washing the entire roof, and ensuring all drainage systems remain free of debris to deliver a completely watertight system. The anticipated term of the agreement is from January 1, 2027, to December 31, 2027. A mandatory walk-through was scheduled for September 8, 2026, and the final response deadline is September 24, 2026. The contract will be awarded to the responsive and responsible bidder offering the lowest cost, with adjustments made for DVBE, Small Business, and Micro Business preferences. Bidders must hold a valid California C-39 Roofing Contractor License and be registered with the Department of Industrial Relations (DIR) for prevailing wage compliance. A mandatory minimum DVBE participation of 5% is required. The successful contractor must provide an unconditional two-year guarantee for materials and labor and comply with Cal/OSHA safety regulations and ADA standards. Submission requires a physical bid package containing specific certifications, including a non-collusion affidavit and a conflict of interest statement, and must be delivered via mail or hand delivery.
Roofing Contractors

POSTED

9 days ago

DEADLINE

in 25 days
View Details