WO 1908042 -- UEM-16 - Provide Crane Support to Offload MUSE Equipment Provide 40-Ton crane, certified operators, rigging crew, flagging crew and associated dunnage to offload (4) 900kW generators and (2) 2MVA step-up substations.

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Work Order 1908042 through Navfac Washington requires the provision of a 40-ton crane, certified operators, a rigging crew, and a flagging crew to support the Central Utility Plant at the Bethesda PDC. The primary objective is to offload four 900kW Aggreko generators and two 2MVA step-up substations from Mobile Utilities Support Equipment, placing them on level surfaces with necessary dunnage according to an approved lay down plan. The scope of work further includes the installation of conductors to transfer power between the generators, substations, and the main power feeder of Building 16, which may involve core drilling and the implementation of cable roll-over protection. Additionally, the contractor must provide and install a containerized fuel tank to refuel generator day tanks, with an option to connect this tank to the existing fuel distribution system in Building 16 via hard piping or sufficient hose length.

General Info

Navfac Washington contract for crane services, equipment offloading, power installation, and fuel tanks.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

W: BETHESDA PDC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Washington
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
28OCT25 -- Through conversations with FMD and ROICC, the H84 is for: Crane support to offload (4) generators and (2) substations and place on a level surface with dunnage as required according to an approved lay down plan. A separate eProjects WO# is being generated for the cabling and associated connections/terminations. The Central Utility Plant (CUP) will be receiving electrical power equipment from Mobile Utilities Support Equipment (MUSE) on approximately 07 November 2025. This includes: (4) Aggreko Generators, 900kW, 480V, 60Hz , Approximately 20 ft long by 8 ft wide footprint (2) Step-up substations, 2MVA, 13,200/480V, 60Hz. Approximately 36 ft long by 8 ft wide footprint. Requirement: 1. Crane support to offload (4) generators and (2) substations and place on a level surface with dunnage as required according to an approved lay down plan. 2. Provide and install conductors for transfer of power between generators, substation, and building 16's main power feeder. a) May require core drilling to route cable from outside to building basement b) Requires roll-over protection for cables. Fuel truck and forklift access is required. 3. Provide and install a containerized fuel tank to facilitate refuel of generator day tanks. a) Option to connect this tank to the existing fuel distribution system in building 16 for easy refueling b) Sufficient hose length or hard piped distribution to generator day tanks

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signals and lighting, along with environmental support through storm water pollution prevention. Required materials include precast concrete, ready mix supply, manhole materials, and various valves and fittings. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certified entities. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. A critical requirement is that subcontractors and material contractors must provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the bond premiums. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving, culvert replacement, drainage improvements, and signage. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in a stone trench, and 2,800 feet of modified concrete curb and gutter. The project is entirely funded by the City of Zeeland with an engineer's estimate of 1,111,000 dollars, and all work must be completed by April 30, 2027. Encrypted bids must be submitted via the Bid Express site by 11 a.m. local time on Thursday, November 12, 2026. Only bidders prequalified by the City of Zeeland will have their bids opened. Proposals must be based on unit prices and must be accompanied by a proposal guarantee of five percent of the bid amount. Award evaluation is primarily based on the total bid price and the competency of the bidder. Successful contractors are required to provide performance and lien bonds each totaling 100 percent of the contract value, as well as certifications for Workmen's Compensation Insurance and manufacturer certifications for sewer pipes. Project direction is managed by Scott A. Smith, P.E. of ZEEZON LLC, with inspection services provided by Moore & Bruggink, Inc.
Moore & Bruggink, Inc

POSTED

about 9 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Department Of The Navy → Navfac Washington

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS