Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Wohler Culvert Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Sonoma County Regional Parks

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Wohler Road and Eastside Road, CA

Set-Aside

NONE

Documents

(1)

Wohler Culvert Repair Notice of Exemption 12-02-2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County Regional Parks
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County Regional Parks
Office AddressN/A
Contacts
Laura SaundersPlanning Technician

Full Description

Show more
The project is to repair a culvert occurring on Sonoma County Regional Parks' property near Wohler Road. Last winter this culvert backed up substantially causing flooding on Wohler Road and causing water to flow over the road and reroute around a portion of the drainage with riparian vegetation restoration. The purpose of the project is to repair and stabilize the existing culvert so that water can flow to the restoration area, downstream sedimentation is avoided, and Wohler Road does not flood. In summer of 2025, under guidance of the Northern California Regional Water Quality Control Board, Regional Parks retained Miksis Services to unblock the culvert and stabilize deteriorating culvert ends. Once the work to remove about 20 feet of roots grown into the culvert and resulting trapped sediment had been performed, Miksis determined that the culvert needed to be lined to preserve long-term function. Regional Parks approved the additional scope and work was scheduled to be conducted during the remaining small window of dry weather. This became impossible because, when Miksis came to begin work on the culvert lining, they discovered that the culvert changes size from 18” to 24” partway through. The intended culvert lining, Dynaliner, can only expand 1 culvert size (for instance, to 21” would be possible, but not all the way to 24”). To maintain functional stability over the long term, the culvert needs to be lined with one continuous liner. Miksis Services will remove the upstream 17’ of the 18” CMP upstream of the 22-degree bend, digging to the culvert invert in the existing road, and replace it with 24” CMP. A confined space crew will clean the damaged 40’ of 24” CMP with a dry-vacuum industrial loader truck. Once the preparatory work is completed, a 24” Dynaliner seamless thermoformed PVC pipe liner will be installed to achieve a continuous diameter pipe. Both ends of the culvert will be stabilized. The project will benefit residents of Sonoma County by protecting water quality and winter users of Wohler Road by preventing or limiting flooding.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS