Orange County Water District Anaheim Lake Sediment Disposal Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Orange County Water District is undertaking the removal and disposal of approximately 20,000 cubic yards of sediment from Anaheim Lake, an artificial groundwater replenishment basin located in Anaheim, California, as part of routine operations and maintenance. The material, previously excavated during standard upkeep activities, will be sorted, loaded onto trucks, and hauled to off-site locations for reuse by a private aggregate contractor, with no new facility construction or operational changes involved. The project is classified as a ministerial activity under California’s Environmental Quality Act (CEQA) and is exempt from environmental review pursuant to Class 1, Section 15301, which covers the maintenance of existing facilities without expansion. A Notice of Exemption was filed on September 1, 2025, and certification of this exemption is a required compliance step. No formal solicitation, contract number, or competitive procurement process has been established, as the work is treated internally by the district rather than through a public bid process. There is no identified contract value, pricing structure, or payment mechanism documented, and no formal contracting officer, contracting representative, or invoicing protocol is specified. The place of performance is clearly defined as Anaheim Lake, with a ZIP code of 92806, though the off-site disposal locations are not named. Contact for the project is Shawn Nevill, Principal Planner, reachable at the Orange County Water District’s administrative office in Fountain Valley, California. No federal acquisition regulations apply, and no representations, certifications, socioeconomic set-asides, packaging standards, or inspection criteria beyond CEQA compliance are referenced or required. The entire effort is framed as an internal operational task with no contractor selection, evaluation factors, or award logic.

General Info

Orange County Water District removes 20,000 cubic yards of sediment from Anaheim Lake for off-site reuse under CEQA Class 1 exemption.

Agency

California → Orange County Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Miraloma Avenue/N. Tustin Avenue, Anaheim, CA, 92806

Set-Aside

NONE

Documents

(1)

Anaheim Lake Sediment Disposal CE September 2025

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Orange County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Orange County Water District
Office AddressN/A
Contacts
Shawn NevillPrincipal Planner

Full Description

Show more
The Project consists of the sorting and removal of approximately 20,000 cubic yards of material from the site that was previously excavated from the basin during the course of ordinary operations and maintenance activities. The materials would be hauled away by trucks to be utilized as-needed by a private aggregate/materials contractor for other purposes at off-site location(s).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.