This project involves the replacement of the failing 15kv main electrical switchgear at the FDR VA Medical Center in Montrose, New York. The scope of work includes renovating rooms in building 24, performing asbestos and lead abatement, installing a new main electrical switchgear with associated accessories, and constructing a new duct bank. Additionally, the contractor is responsible for installing new primary electrical conductors, grounding, and updating the HVAC, plumbing, and sprinkler systems within the work areas. The project requires coordination with the local utility company for cutovers and a final commissioning of the equipment. The contract is a firm fixed price award classified as a full recompete opportunity with a high confidence level. It is specifically set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 237130. The estimated cost for the project ranges between 2 million and 5 million dollars, with a period of performance of 480 calendar days from the notice to proceed. The current incumbent is OCS Industries Inc, and the potential end date for the existing contract is September 30, 2026.
General Info
Place of Performance
NY, 105481454, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Current Contract: 36C24221C0065 Incumbent: OCS INDUSTRIES INC Contract Value: $2,459,448 Potential End Date: 2026-09-30T00:00:00.000Z Competition: FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES Pricing: FIRM FIXED PRICE Classification: full-recompete (Confidence: high - 90/100)
Page 2 of 3 This notice is for Solicitation Number 36C24220B0055, Project No. 620-12-108 Replace Failing Main Switchgear at the FDR VA Medical Center, 2094 Albany Post Road, Montrose, NY 10548. This shall be a Service-Disabled Veteran Owned Small Business Set-Aside (SDVOSB). Bids will only be accepted from SDVOSBs that are determined to be responsible and responsive contractors. This project is classified under NAICS Code 237130, Power and Communication Line and Related Structures Construction, and has a Size Standard of $36.5 million. The cost estimate range for this project is between $2,000,000 and $5,000,000. Scope of Work: The Contractor shall furnish materials, equipment, tools, personnel and supervision in order to accomplish the work as described in the contract documents and any amendments issued prior to the Bid opening for Project 620-12-108, Replace existing 15kv Switchgear at Montrose Campus of the Hudson Valley Health Care System, New York. Work shall comply with VA Specifications and regulations, all applicable Federal, State and Local codes including specific regulations related to working at the VA Medical Center at Montrose, NY Contractor shall be responsible to complete the work within the contractual period of performance, and within the work hours as defined in the contract. Contractor shall be responsible to plan and develop activities, phasing and project scheduling. The Bidding Contractors shall inspect the areas of work prior to bidding. Scope of Work includes the following description of work, but not be limited to: 1. The contractor shall renovate existing rooms in building 24 to accommodate the installation of a new main electrical switchgear to replace the existing gear 2. The contractor shall perform asbestos and lead abatement as per the contract documents 3. The contractor shall install a new main electrical switchgear and associated accessories such as battery system, mimic panel, VA metering, utility metering, arc chute, etc. 4. The contractor shall remove the existing electrical switchgear and associated accessories after the existing switchgear has been installed and energized 5. The contractor shall install a new duct bank from building 24 to manhole 5D 6. The contractor shall install new primary electrical conductors from the street to the new main switchgear and from the new main switchgear to the first sectionalizing switch of each campus feeder circuit 7. The contractor shall remove existing primary electrical conductors being replaced by new conductors. Existing conductors shall be removed only after new conductors are installed and energized 8. The contractor shall install a new grounding outside building 24 and connect to the new switchgear 9. The contractor shall remove existing and install new HVAC system(s) in the areas of work within building 24 10. The Contractor shall remove existing and install new plumbing system(s) and fixture(s) in the areas of work within building 24 11. The contractor shall remove existing and install new sprinkler heads and piping in the areas of work within building 24 12. The contractor shall coordinate with the local utility company to meet their requirements and ensure smooth cutover(s) from existing to new equipment 13. The contractor shall provide Commissioning of the new Electrical Switchgear and coordinate with AE and the Utility company as per the contract documents The Period of Performance shall be 480 calendar days from Notice to Proceed. Contractor will be responsible to coordinate and schedule work to minimize construction duration and shall be expected to plan work typically during duty hours of the Medical Center, other than utility tie-ins or work required in the COR s opinion to be performed during off duty hours. Maintain all access to and egress from the building at all times for facility s fire protection requirements and to meet the requirements of regulatory codes, laws, etc. All other details and information shall be contained in the solicitation which shall be posted on beta.SAM.gov. The solicitation will be released on or about August 4, 2020. The response submittal address, date and time will be included in the solicitation. This project requires bonding and all responses/submissions shall be in electronic format followed by hardcopies; faxed bids will not be accepted. All prospective bidders must be currently registered in www.sam.gov and be registered and verified as a SDVOSB in www.vip.vetbiz.gov at the time of offer submission and before award of this procurement. Responses to this notice with your firm s capability statement must be in writing (email) and must be received not later than August 3, 2020 at 4PM. Point of Contact is Aletha Bourke at contact@example.gov. No telephone inquiries will be accepted. End of Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS