Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Yeager Well Replacement Project

Forecast
2025070681State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Yeager Well Replacement Project, approved by the State Water Resources Control Board on October 27, 2025, involves the construction of a replacement potable water supply well, Yeager Well 4, at the Yeager-Vale Plant in Morongo Valley, California. The project includes the acquisition and preparation of a southern parcel to expand the plant to approximately 0.77 acres, requiring the removal of vegetation and a 25-foot cottonwood tree. Once Yeager Well 4 is established, the existing Yeager Well 2 will be decommissioned. The new well is expected to have a capacity of 300 to 400 gallons per minute and will reach a depth of approximately 300 feet. Construction is scheduled to begin in August 2025 and last five to six months, with drilling occurring over approximately 150 days, including some 24-hour operations. To comply with local noise ordinances, 24-foot-high sound walls will be installed. Environmental compliance is managed through a Mitigated Negative Declaration under the California Environmental Quality Act and the State Water Board National Permit Discharge Elimination System. To manage excess water during development, a 500-foot temporary discharge pipeline and two settling tanks will be utilized to protect the Big Morongo Canyon Preserve. Project administration is led by District Engineer Hector Cazares.

General Info

Construction of Yeager Well 4 in Morongo Valley to replace Yeager Well 2.

Agency

California → State Water Resources Control Board

Place of Performance

11083 Vale Drive, intersection of Mojave Dr. & Vale Dr., CA, 92256

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Hector CazaresDistrict Engineer
OMAR TINOCOAssociate Water Quality Engineer

Full Description

Show more
GSWC is planning to construct and operate replacement potable water supply well, Yeager Well 4, at its Yeager-Vale Plant. Yeager Well 2 will be decommissioned once Well 4 has been established. An adjacent GSWC-owned parcel to the south (APN: 058326107) has been identified by GSWC as the proposed location for the replacement well. The parcel is approximately 130 feet (east to west) by 100 feet (north to south). The addition of the parcel to the south would expand the total area of the Yeager-Vale Plant to approximately 0.77-acre. The Proposed Project would be part of GSWC’s Morongo Del Sur System, which delivers groundwater pumped from the Morongo Valley portion of the Morongo Basin located east and west of the Twenty-Nine Palms Highway between Morongo Valley and Yucca Valley. GSWC is proposing to decommission Yeager-2 once Yeager Well 4 has been established. Yeager-2 is approximately 300 feet deep, and the new Yeager-4 well would reach approximately the same depth. The facility would not require a crew or staff; therefore, no bathroom facilities would be built. The southern parcel, Parcel B, of the Project Site is undeveloped land, with mesquite dominated vegetation and cottonwood tree (Populus sp.) towards the eastern side, and overhead power lines parallel to the northern property line between the southern parcel and the Yeager-Vale Plant. The overhead power lines proceed north along the eastern perimeter of the Yeager-Vale Plant. As part of the construction, the vegetation and the large cottonwood tree will need to be removed and the ground leveled and prepared (i.e., temporary gravel bed) for heavy equipment prior to construction activities. The cottonwood tree measures 25 feet tall and has a 14.6-inch diameter at breast height (DBH). The Project ingress/egress would be on the western property boundary from Vale Drive (see Figure 3). The Yeager-Vale Plant has several permanent structures that would be protected in place: the Yeager-Vale Plant treatment building, generator, motor control center, and chemical building. The existing onsite discharge pond located on Parcel A would also remain in place. To manage excess water volumes generated during the well development phase that exceeds the capacity of the existing discharge pond, a temporary above-ground high-capacity discharge pipeline would be installed. The line will extend east along Mojave Drive and then continue north along East Drive before terminating south of the East Drive and Covington Drive intersection, with the line discharging into an upland area (see Figure 3). The pipeline would span approximately 500 linear feet and be completely contained within the developed roadway and shoulder of Mojave Drive and East Drive. This alignment has been selected to avoid encroachment on wetland habitat within the Big Morongo Canyon Preserve. GSWC maintains regulatory coverage for this discharge under the State Water Board National Permit Discharge Elimination System (NPDES) Permit for Drinking Water System Discharges (Order No. WQ 2014-0194-DWQ, WDID No. 4DW0623), administered by the State Water Board Division of Water Quality. In June 2015, GSWC received a Notice of Applicability (NOA) for the Statewide Drinking Water System Discharge Permit, identification number 4DW0623, which asserts coverage under Order No. WQ 2014-0194-DWQ. Under this NOA, GSWC is authorized to discharge water from GSWC’s Morongo Del Sur Drinking Water system into the Big Morongo Creek (located within the Big Morongo Canyon Preserve). To ensure NPDES permit compliance, two temporary settling tanks would be deployed on Parcel B to remove suspended solids, reduce turbidity, and decrease flow velocity prior to discharge. These tanks operate based on gravitational sedimentation principles and serve as a best management practice for the discharge. The temporary discharge pipeline and settling infrastructure would be fully decommissioned and removed upon completion of construction activities. The highest pumping rate at Yeager-2 was 415 gallons-per-minute (gpm) when measured in 1990, and the pumping rate has declined nearly 50 percent in recent years. Yeager-4 is anticipated to have a capacity of 300-400 gpm. Pumping rates would be determined during drilling and are impacted by several factors including well interference at the well field, the nearby domestic wells across the street, and water quality. To meet the local noise ordinances, 24-foot-high sound walls would be required during well drilling. It is expected that the Project Site would need to be partially enclosed with sound walls strategically placed to minimize impacts to sensitive receptors to the west and south sides of the Project Site. Project construction, consisting of grading, well drilling, and equipping, would begin in August 2025 and take approximately five to six months to complete. Drilling would occur for approximately 150 days. Some components of the well drilling would require 24-hour operations. This is to advise that the State Water Resources Control Board (Lead Agency) approved the above-described Project on October 27, 2025 and has made the following determinations regarding the above-described Project:

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
CPK2504 - Eldridge Park Improvements
Solicitation # 2026-ITB-049
The City of Sugar Land has issued Invitation for Bid 2026-ITB-049 for the Eldridge Park Improvements project located at 2511 Eldridge Rd, Sugar Land, TX. The scope of work requires all labor, materials, and supervision to complete a Base Bid consisting of site preparation, tree protection, selective demolition, parking lot pavement and curb construction, waterline installation and connection to the City main, irrigation, grading, hydroseeding, ADA-compliant sidewalks, playground walls, and dumpster enclosure renovation. Additionally, the project includes two optional add-alternates: Add Alternate 1 for building improvements and Add Alternate 2 for the construction of a 210 by 345 foot synthetic turf field featuring an underground detention system, fencing, and furnishings. Bids must be submitted electronically via the OpenGov procurement portal by November 12, 2026, at 11:00 am. Respondents are required to submit a detailed bid pricing form covering the Base Bid, Owner Set Cash Allowances, and both Add Alternates, as well as complete a mandatory vendor questionnaire and acknowledge compliance with all insurance requirements. The selected contractor will be required to enter into the City of Sugar Land Standard Contract for Civil Engineering Construction Projects. The contract will be awarded by the City Council based on the terms provided in the Invitation to Bid.
Engineering

POSTED

about 21 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
PIER B ON-DOCK RAIL SUPPORT FACILITY RAIL YARD ACCESS IMPROVEMENTS
Solicitation # HD-S3215
Solicitation HD-S3215, issued by the Long Beach Harbor Department for the Port of Long Beach, covers rail yard access improvements for the Pier B On-Dock Rail Support Facility. The scope of work includes the realignment, relocation, resurfacing, and rehabilitation of existing railroad tracks and the construction of new lead tracks within the Pier B rail yard and Pico Avenue corridor. Key technical requirements involve the installation of new railroad signal systems, modification of the signal system at CP Gaspur, and the implementation of special trackwork such as turnouts and crossovers. The project also encompasses extensive demolition of tracks, pavement, and utilities, as well as earthwork, grading, storm drain improvements, and the relocation of street lighting, all phased around active railroad operations. The contract requires strict adherence to AREMA manuals and CPUC General Orders, with a heavy emphasis on quality control and safety. Deliverables include a Site-Specific Safety Plan, a Railroad Work Plan, and certified Acceptance Test Reports, with testing for equipment and cabling performed by a NETA-certified independent agency. Bidders must submit electronic bids through the Port of Long Beach PB System, including a comprehensive proposal package and an SBE/VSBE Commitment Plan. The project is subject to various federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Americans with Disabilities Act. Performance security is required in the form of payment and performance bonds for 100% of the contract price, and bid security must be at least 10% of the base bid.
Port of Long Beach

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
46108 CONSTRUCTION
Solicitation # 46108-C
Project No. 46108-C is a unit price construction contract for the Cayuga Inlet Flood Risk Reduction and Restoration project located at 900 Taber Street in Ithaca, New York. Issued by the New York State Department of Environmental Conservation and the Office of General Services, the project has an estimated value between 23 million and 24 million dollars. The scope of work encompasses comprehensive site preparation, earthwork, and hydraulic dredging operations, including the management of filtrate from geotextile tube dewatering and the off-site disposal of organic, dredge, and construction debris. Key deliverables include a Marine Traffic Control Plan, daily hydraulic dredge reports, and detailed subsurface investigation reports. The project also requires pre-construction and progress bathymetric and topographic surveys, as well as the establishment of a site management facility for staging and spoil management. Bids are due by December 9, 2026, and must be submitted via Bid Express or as sealed paper bids to the Office of General Services in Albany. The contract will be awarded to the apparent low bidder based on a determination of bid responsiveness and bidder responsibility, which includes an evaluation of financial data, past performance on similar contracts, and the qualifications of key personnel such as the Project Manager and Site Safety Officer. Bidders must provide bid security of 599,200 dollars and, upon award, furnish performance and labor and material bonds for 100 percent of the contract price. Compliance with New York State Labor Law, prevailing wage schedules, and MWBE/SDVOB utilization plans is required. All imported materials must be approved by the Director's Representative and verified by a qualified geotechnical testing laboratory.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS