Z1DA--537-26-200 FY26 Facility Cooling Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract pertains to Facility Cooling Improvements at the Jesse Brown VA Medical Center in Milwaukee, Wisconsin under project number VA 537 26 200, with the primary objective of replacing AHU-AC21 serving Nutrition Food and Service. The work involves replacing 60% propylene glycol with 30% propylene glycol in hydronic distribution systems, upgrading heat tracing and thermostatic controls, installing a matching space heater and new UV light system within the AC-21 enclosure, and replacing all lighting and switches with LED IP65 lamps and NEMA 3R switches. The contract includes a base requirement to be completed in 76 calendar days from Notice to Proceed, divided into five phases including preconstruction, VA review, and 40 days of construction, plus an optional CLIN that may be exercised by November 1, 2026, with a 245-day completion window. All work must be delivered FOB destination and is governed under Standard Form 1449 as a commercial services procurement with NAICS code 238220. Safety requirements are stringent: the Prime Contractor must maintain a full-time Site Safety and Health Officer (SSHO) with a current professional safety certification and at least three years of dedicated construction safety experience, who must be present onsite at all times during construction; alternates and designated representatives are permitted only under strict conditions aligned with EM 385-1-1 and 29 CFR 1926. Subcontractor personnel must have either 30-hour OSHA Construction Safety Training (for supervisors) or 10-hour training (for workers), and each subcontractor must designate one or more Competent Persons for specialized tasks such as asbestos, fall protection, cranes, scaffolds, and trenching, with the SSHO required to be separate from the Superintendent or Quality Control Manager. All equipment must be installed in readily accessible locations, with non-compliant installations to be corrected at no additional cost to the government. The contract mandates comprehensive documentation including electronic CPM schedules, commissioning plans, shop drawings, product data, and samples, all submitted as searchable PDFs under a strict submission protocol with electronic delivery thresholds. Payments are governed by FAR 52.232-5 and VAAR 852.232, with monthly applications through VA Form 10-6001a or AIA G702/G70
General Info
Contract Value
$4,403,098Place of Performance
WI, USASet-Aside
Awardee
JV6 CONTRACTING V2 LLCAward Issued Date
Timeline
Organization & Contact Information
Full Description
A0003 PROJECT #: VA 537 26 200 PROJECT TITLE: FACILITY COOLING IMPROVEMENTS AT THE JESSE BROWN VAMC This addendum forms a part of the proposal and documents. It modifies the documents of the solicitation posted on May 6, 2026, and June 4, 2026, for the REPLACEMENT OF AHU-AC21 Serving Nutrition Food and Service.
CONSTRUCTION STATEMENT OF WORK
Under Part 5: Applicable Performance Standards Delete Contractor and Subcontractor staff must have completed the 30-Hour OSHA Construction Safety Training Program . And substitute it with General Contractor and subcontractor supervisors must have completed the 30-hour OSHA Construction Safety Training Program. While other workers must have completed the 10-hour OSHA Construction Safety Training Program.
PROJECT MANUAL
SPECIFICATION SECTION 01 35 26
Under this specification, sub-section 1.9 SITE SAFETY AND HEALTH OFFICER (SSHO) AND COMPETENT PERSON (CP) is missing. On page 68 of 582 of the Project Manual, after 1. 8 SAFETY MEETINGS , PLEASE INSERT 1.9 AS FOLLOWS:
1.9 SITE SAFETY AND HEALTH OFFICER (SSHO) AND COMPETENT PERSON (CP): The Prime Contractor shall provide a Safety oversight team that includes a minimum of one (1) person at each project site, for each shift, to function as the Site Safety and Health Officer (SSHO). The Prime Contractor shall provide a minimum of one Full-Time SSHO at each project site for each shift (with no other duties) who holds a current professional safety certification with at least 3 years of dedicated construction safety-related experience. The SSHO shall ensure that the requirements of the VA and of 29 CFR 1926.16 are met for the project. The SSHO must be at the work site at all times, during construction activities, to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. If the SSHO is off-site for a period longer than 8 hours or one shift, but not exceeding 40 hours or 5 shifts, a pre-approved Alternate Safety Officer shall be provided and shall fulfill the same roles and responsibilities as the primary SSHO. The Alternate Safety Officer shall have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17 and all associated subparagraphs. When the SSHO is temporarily (not to exceed 8 hours) off-site, a Designated Representative (DR) from the Prime Contractors staff, as identified in the AHA, may be used in lieu of an Alternate Safety Officer and shall be on the project site at all times when work is being performed. Note that the DR is a collateral-duty safety position, with safety duties in addition to their full-time occupation. Each subcontractor shall designate a minimum of one CP in compliance with 29 CFR 1926.20 (b)(2) who will be identified as a CP to administer their individual safety programs. Further, all specialized Competent Persons for the work crews will be supplied by the respective contractor as required by 29 CFR 1926 (i.e., Asbestos, Electrical, Cranes, & Derricks, Demolition, Fall Protection, Fire Safety/Life Safety, Ladder, Rigging, Scaffolds, and Trenches/Excavations). These Competent Persons can have collateral duties as the subcontractor s superintendent and/or work crew lead persons as well as fill more than one specialized CP role (i.e., Asbestos, Electrical, Cranes & Derricks, Demolition, Fall Protection, Fire Safety/Life Safety, Ladder, Rigging, Scaffolds, and Trenches/Excavations). However, the SSHO must be a separate qualified individual from the Prime Contractor s Superintendent and/or Quality Control Manager, with duties only as the SSHO The SSHO or an equally qualified Designated Representative/alternate will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor. CPs will maintain a presence during their construction activities in accordance with the above-mentioned clause. A listing of the designated SSHO and all known CPs shall be submitted prior to the start of work, as part of the APP, along with the training documentation and/or AHA, as listed in Section 1.8. The repeated presence of uncontrolled hazards during a contractor s work operations will result in the designated CP being deemed incompetent and in the required removal of the employee in accordance with FAR Clause 52.236-5: Material and Workmanship, Paragraph (c). EXCEPT AS MODIFIED HEREIN, ADDENDUM #2 AND THE PREVIOUSLY ISSUED BID DOCUMENTS SHALL REMAIN IN FULL FORCE AND EFFECT.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
