Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on December 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--ALBANY 8C,9D & 10C Door install/retrofit 2.0

Closed
36C24226Q0220Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 1 hour ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes site preparation, structural modifications such as saw cutting reinforced concrete walls, and the installation of an ADA-accessible route featuring ramps, landings, and handrails. The contractor is responsible for all permitting, structural engineering, weatherproofing, and ensuring that interior and exterior finishes match the existing clubhouse architecture. Project acceptance is contingent upon successful inspections by the Authority Having Jurisdiction and final approval by Colville Fuels. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements per Colville Tribal Code Chapter 10-3. Bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Required insurance includes Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability, and Worker's Compensation. Bids are due by November 20, 2026, with a targeted contract award date of December 4, 2026, and a weather-dependent completion goal of March 31.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract entails the furnishing and installation of entrance and security doors at three locations within the Albany VA Medical Center, specifically buildings 10C, 9D, and 8C. Identified under solicitation number 36C24226Q0220 and titled "Z1DA--ALBANY 8C,9D & 10C Door install/retrofit 2.0," this solicitation was posted on December 16, 2025, with a response deadline of December 31, 2025. The project falls under the NAICS code 236220, covering commercial and institutional building construction, and is managed by the 242-NETWORK Contract Office 02 located in Albany, NY. The contract specialist overseeing this procurement is Terry Fraser, whose contact information is provided for communication. Work is to be performed within the Albany region, supporting facility upgrades to enhance security infrastructure. Wage Determination No. 2015-4157 Revision 29 applies to this contract, mandating compliance with the Service Contract Act and specifying prevailing wage rates and fringe benefits for applicable labor categories in New York’s Nassau and Suffolk counties, updated per recent Executive Orders to ensure fair labor standards. Additionally, the contract requires adherence to the Buy American Act, as indicated by FAR 52.225-2, necessitating certification that all end products are domestic unless otherwise specified, promoting the use of American-made materials and compliance with federal procurement policies. These regulations ensure that the contract supports both high-quality workmanship and compliance with federal labor and procurement standards.

General Info

Furnish and install security doors at Albany VA Medical Center buildings with labor and Buy American compliance.

Contract Value

$58,800

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

NY

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment 0001 to Solicitation 36C24226Q0220 - SOW Update for Albany VAMC Door Install

DOCX, High priority: read this firstamendment
High

Pre-Solicitation Notice for Albany VAMC Door Install/Retrofit 2.0 - Solicitation 36C24226Q0220

DOCX, High priority: read this first4 pages · presolicitation
High

Solicitation 36C24226Q0220 - Security Entrance Doors Installation at Albany VA Medical Center

DOCX, High priority: read this first39 pages · ifb
High

SOW for Entrance/Security Door Installation at Stratton VA Medical Center

PDF, High priority: read this first25 pages · sow
High

SOW Furnish & Install Entrance/Security Doors at Albany VAMC

PDF, High priority: read this firstsow
High

VA Notice of Limitations on Subcontracting - Certificate of Compliance (NOV 2022)

PDF, High priority: read this firstcertificate-of-compliance
High

Wage Determination NY20250002 for New York Construction Projects

PDF, High priority: read this firstwage-determination
High

FAR 52.225-2 Buy American Certificate (Feb 2021)

PDF, Low prioritycertification
Low

NABCO Door Operator Cut Sheet

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Dec 31, 2025 to Dec 26, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)
Contacts1 person available
OfficeALBANY, NY, 12208, USA
Office AddressALBANY, NY, 12208, USA
Contacts
Terry FraserContract Specialist

Full Description

Show more
Stratton VA Medical Center Albany, New York Statement of Work (SOW) FURNISH & INSTALL ENTRANCE/ SECURITY DOORS at 10C & 9D
General Scope of Work: Stratton Veterans Administration Medical Center, located at 113 Holland Avenue, Albany NY 12208 is requesting a contract to provide all labor and materials to furnish, install and rework Security/Entrance doors at the following location: 10C: Existing storefront door with side light system, must have door with opposite swing. New door inset to be provided. New window film to be included. 9D: Relocate storefront door system from 10D and add missing door to system. Work Required: 9D Relocate existing storefront sidelight system from 10C to 9D and add door to system.
Contractor will provide all materials, labor and travel to relocate existing storefront door system from 10C to 9D. Contractor will provide all materials, labor and travel to return the 10D walls and flooring to original by matching existing finishes upon removal of storefront system. 10C Contractor will provide all materials, labor and travel to provide NEW storefront door (from Right Hand Reverse(RHR) to Left Hand Reverse (LHR). Contractor will provide all materials, labor and travel to install NEW hardware and door to LHR swing door. Existing door hardware includes: Four heavy duty ball bearing butt hinges. Push side Von Duprin 99 rim exit device with quiet latch retraction (QEL). Push side request to exit with jamb mounted strike. Push side Nabco GT 710 low energy operator bronze finish. Pull side bronze finish thought bolted wire pull handle with cylinder hole.
Contractor will provide all materials, labor and travel required to adapt existing access control system to a LHR swing door system. Contractor will provide all materials, labor and travel required to install new window film as indicated in attached photos. Vendor will be required to confirm all measurements on-site.
Provided by VA: 115VAC power above ceiling for operator & exit device power supply All required relocations of sprinkler heads VA Police Physical Security will provide port and address information for programming the system into the existing Lenel platform
The following is required for this contract: All work will be in accordance with: NFPA 72: National Fire Alarm and Signaling Code. NFPA 70E: Standard for Electrical Safety in the Workplace. NFPA 70: National Electrical Code Articles 517, 645 & 800. NFPA 77: Recommended Practice on Static Electricity. NFPA 99: Healthcare Facilities. NFPA 101: Life Safety Code. Period of Performance One (1) Week after contract award- Submittals due. One (1) Week-Required submittal review. One (1) Week after all materials arrive- Work starts One (1) Week-To complete work. TOTAL Four (4) Weeks plus material lead time.
Attachments: Door sample and placement. Door locations. Aluminum Door Spec. Glazing Spec.


Location of Door on 9D Relocated from 10C


10C WINDOW FILM SAMPLE




SECTION 08 44 13 GLAZED ALUMINUM CURTAIN WALLS
GENERAL DESCRIPTION: This section specifies glazed aluminum curtain wall system. Thermally isolated, pressure equalized on interior. Type: Unit and Mullion system to include following: Uninsulated Metal Panels. Closures, trim, subsills and flashings. Column covers. Fasteners, anchors, and related reinforcement. RELATED WORK: Glazing: Section 08 80 00, GLAZING. QUALITY ASSURANCE: Qualifications: Approval by Contracting Officer Representative (COR) is required of products or services of proposed manufacturer, suppliers and installers, and will be based upon submission by Contractor of certification that: Manufacturers Qualifications: Manufacturer with five (5) years continuous documented experience in fabrication, of glazed aluminum curtain wall systems of similar types and for projects of equivalent size. Installer: Manufacturer approved in writing who has continuously installed glazed aluminum curtain walls systems of similar types and for projects of equivalent size for previous five (5) years.
DELIVERY, STORAGE AND HANDLING: Refer to AAMA CW 10 for care and handling of architectural aluminum from shop to site. Prior to packaging for shipment from factory, mark wall components to correspond with shop and erection drawings and their placement location and erection sequence. Prior to shipment from factory, place knocked down lineal curtain wall members in cardboard containers and cover finished surfaces of members with protective covering of adhesive paper, waterproof tape, or strippable plastic. Do not cover metal surfaces that will be in contact with sealants after installation. PROJECT CONDITIONS: Field Measurements: Where glazed aluminum curtain wall systems are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication and indicate measurements on shop drawings. Coordinate fabrication schedule with construction progress to avoid delaying Work. APPLICABLE PUBLICATIONS: Publications listed below form a part of this specification to extent referenced. Publications are referred to in text by basic designation only. American Architectural Manufacturers Association (AAMA): MCWM-1-89 Metal Curtain Wall Manual CW 10-12 Care and Handling of Architectural Aluminum from Shop to Site CW 13-85 Structural Sealant Glazing Systems (A Design Guide) 503-08 Field Testing of Metal Storefronts, Curtain walls and Sloped Glazing Systems American Society of Civil Engineers (ASCE): ASCE 7-10 Minimum Design Loads for Buildings and Other Structures ASTM International (ASTM): A36/A36M-12 Structural Steel A123/A123M-13 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products A193/A193M-14a Alloy Steel and Stainless-Steel Bolting Materials for High Temperature Service A307-14 Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength B209-14 Aluminum and Aluminum Alloy Sheet and Plate B211-12 Aluminum and Aluminum Alloy Bar, Rod, Wire B221-14 Aluminum and Aluminum Alloy Extruded Bars, Rods, Wire, Shapes and Tubes B316/B316M-10 Aluminum and Aluminum Alloy Rivet and Cold-Heading, Wire, and Rods C578-14a Rigid Cellular Polystyrene Thermal Insulation C920-14a Elastomeric Joint Sealants C794-10 Standard Test Method for Adhesion-In-Peel of Elastomeric Joint Sealants. C1193-13 Guide for Use of Joint Sealants C1363-11 Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus C1521-13 Practice for Evaluating Adhesion of Installed Weatherproofing E84-14 Surface Burning Characteristics of Building Materials E413-10 Classification for Rating Sound Insulation American Welding Society, Inc. (AWS): D1.2/D.1.2M-06(R2014) Structural Welding Code Aluminum National Association of Architectural Metal Manufacturers (NAAMM): 500 Series (2006) Metal Finishes Manual Society for Protective Coatings (SSPC) Paint 25-97 (2004) Zinc Oxide, Alkyd, Linseed Oil Primer for Use Over Hand Cleaned Steel Type 1 and Type II Paint 20-82 (2019) Zinc-Rich Coating, Type I-Inorganic, and Type II-Organic. U.S. Veterans Administration: Physical Security Design Manual for VA Facilities (VAPSDG); Life Safety Protected Architectural Design Manual for VA Facilities (VASDM) Environmental Protection Agency (EPA): 40 CFR 59(2014) National Volatile Organic Compound Emission Standards for Consumer and Commercial Products WARRANTY: Construction Warranty: Comply with FAR clause 52.246-21, Warranty of Construction . PRODUCTS SYSTEM DESCRIPTION: Design Requirements: Shop unitized assembly.  Maximum wall framing member deflection, in a direction normal to plane of wall: 1/175 of its clear span or 20 mm (3/4 inch), whichever is less, when designed in accordance with requirements of AAMA TIR A11 and tested in accordance with ASTM E330/E330M. Maximum wall framing member deflection when a gypsum wallboard surface is affected: 1/360 of span. Maximum Framing Member Permanent Deformation: 0.2 percent of its clear span when tested in accordance with ASTM E330/E330M for a minimum test period of 10 seconds at 1.5 times design wind pressures indicated as part of structural drawing wind load requirements. No glass breakage, or damage to fasteners, hardware or accessories is permitted due to deformation design requirements indicated. Provide system complete with framing, mullions, trim, fasteners, anchors, accessories, concealed auxiliary members, and attachment devices for securing wall to structure as specified or indicated. Unless noted otherwise, comply with AAMA MCWM 1. Obtain all components from single manufacturer. Fully coordinate system accessories directly incorporated and adjacent to contiguous related work and ensure materials compatibility, deflection limitations, thermal movements, and clearances and tolerances as indicated or specified. Coordinate continuity with adjacent thermal, weather, air and vapor barriers. Provide system with adequate allowances for expansion and contraction of components and fastenings to prevent buckling damage, joint seal failure, glass breakage, undue stress on fastening or other detrimental effects. For design purposes, base provisions for thermal movement on assumed ambient temperature range of from 18 degrees C to 49 degrees C (0 degrees F to 120 degrees F). Provide wall system to accommodate tolerances in building frame and other contiguous work as indicated or specified.
MATERIALS: Extruded Aluminum Framing Members: ASTM B221M (B221); 6063-T5 extruded aluminum for non-structural components or 6063-T6 extruded aluminum for structural members; temper and alloy as recommended by manufacturer. Sheet Aluminum: ASTM B209M (B209); 6065-T5 temper and alloy as recommended by manufacturer. Formed flashing and closures: Minimum 1.58 mm (0.062 inch) thick aluminum, in finish as selected. Extruded sill members: Minimum 1.58 mm (0.062 inch) thick aluminum, in finish as selected. Fasteners: For Framework Connections: ASTM B211M (B211) 2024 T4 aluminum, ASTM A193/A193M B8 300 series, stainless steel, and ASTM B316 aluminum rivets, as required by connection. For Anchoring Glazed Aluminum Curtain Wall to Support Structure: ASTM A307 zinc plated steel fasteners. Shims: Metal or plastic. Glazing Materials: As specified under Section 08 80 00, GLAZING. Glazing Gaskets: Interior: Continuous, closed cell PVC foam sealant tape, sealed at corners. Glass Sizes and Clearances: Accommodate up to 1/4-inch glazing. Sizes indicated are nominal. Verify actual sizes required by measuring frames. Coordinate dimensions for glass and glass holding members to meet applicable minimum clearances as recommended by glass manufacturers. Do not nip glass to remove flares or to reduce oversized dimensions. All cutting is to occur in factory. Glass Setting Materials: Provide head bead and drive wedge required for glass installation to suit curtain wall system in accordance with manufacture s recommendations. FABRICATION: Curtain wall components are to be of materials and thickness indicated in construction documents. Details indicated are representative of required design and profiles. Maintain sightlines. Unless specifically indicated or specified otherwise, methods of fabrication and assembly are to be at discretion of curtain wall manufacturers. Perform fitting and assembling of components in shop to maximum extent practicable. Anchorage devices are to permit adjustment in three directions. No exposed fasteners are permitted. Joints: Joints exceeding +1.5 mm (+1/16") are to be mechanically fastened. Protection and Treatment of Metals: Remove from metal surfaces lubricants used in fabrication and clean off other extraneous material before leaving shop. Provide protection against galvanic action wherever dissimilar metals are in contact, except in case of aluminum in permanent contact with galvanized steel, zinc, stainless steel, or relatively small areas of white bronze. Paint contact surfaces with one coat bituminous paint conforming to MIL C 18480 or apply appropriate caulking material or nonabsorptive, noncorrosive, and non-staining tape or gasket between contact surfaces. Metal sills and Closures: Fabricate accessories, spandrel panels, trim closures of sizes and shapes indicated from similar materials and finish as specified for wall system. METAL FINISHES: In accordance with NAAMM AMP500 series. Anodized Aluminum: AA C22A44 Chemically etched medium matte with electrolytically deposited metallic compound, integrally colored coating Class 1 Architectural, 0.7 mil thick finish. Dyes will not be accepted. Dark bronze. EXECUTION PREPARATION: Take field dimensions and examine condition of substrates, supports, and other conditions under which work of this section is to be performed to verify that work may properly commence. Do not proceed with installation until unsatisfactory conditions have been corrected. Contact between aluminum and dissimilar metals are to receive a protective coating of bituminous paint for prevention of electrolytic action and corrosion. INSTALLATION: Install and erect glazed curtain wall system and all components in accordance with written directions of curtain wall manufacturer. Match profiles, sizes, and spacing indicated on approved shop drawings. Install glazed aluminum curtain wall system so as to maintain a virtually flat face cap, with no visible bowing. Install entire system so that fasteners are not visible. Tolerances: Maximum variation from plane or location shown on approved shop drawings: 3 mm per 3657 mm (1/8 inch per 12 feet) of length up to not more than 13 mm (1/2 inch) in any total length. Maximum offset from true alignment between two (2) identical members abutting end to end in line: 0.8 mm (1/32 inch). Sealant Space Between Curtain Wall Mullion and Adjacent Construction: Maximum of 19 mm (3/4 inch) and minimum of 6 mm (1/4 inch). ADJUSTING: Adjust doors to provide a tight fit at contact points and operate easily. Adjust weather-stripping to make even contact with surfaces. Adjust operating hardware and moving parts. CLEANING: Install curtain wall frame and associated metal to avoid soiling or smudging finish. Clean metal surfaces promptly after installation, exercising care to avoid damage to coatings. Remove excess glazing and sealant compounds, dirt, and other substances. Follow recommendations of manufacturer in selection of cleaning agents. Do not use cleaning agents containing ammonia or other compounds that might damage finished metal surfaces. Replace cracked, broken, and defective glass with new glass at no additional cost to Government. Just prior to final acceptance of curtain wall system clean glass surfaces on both sides, remove labels, paint spots, compounds, and other defacements, and clean metal fixed panels. Remove and replace components that cannot be cleaned successfully. DEMONSTRATION, TESTING, AND ACCEPTANCE: Instruct Government s personnel in proper operation and maintenance of door equipment. Train personnel in procedures to follow in event of operational failures or malfunctions. Acceptance: At completion of project, and as a condition of acceptance, door and systems are to be operated for a period of fifteen (15) consecutive calendar days without breakdown. PROTECTION: After installation, protect windows, and other exposed surfaces from disfiguration, contamination, contact with harmful materials, and from other construction hazards that will interfere with their operation, or damage their appearance or finish. Protection methods are to be in accordance with recommendations of product manufacturers or of respective trade association. Remove paper or tape factory applied protection immediately after installation. Clean surfaces of mortar, plaster, paint, smears of sealants, and other foreign matter to present neat appearance and prevent fouling of operation. In addition, wash with a stiff fiber brush, soap and water, and thoroughly rinse. Where surfaces become stained or discolored, clean or restore finish in accordance with recommendations of product manufacturer or respective trade association. END -



SECTION 08 80 00 GLAZING GENERAL DESCRIPTION This section specifies the following: Glass. Glazing materials and accessories for both factory and field glazed assemblies. RELATED WORK Section 08 44 13, GLAZED ALUMINUM CURTAIN WALLS Glazed Curtain Walls: Glazed Curtain Walls. LABELS Permanent labels: Locate in corner for each pane. Label in accordance with ANSI Z97.1 and SGCC label requirements. Tempered glass. PERFORMANCE REQUIREMENTS General: Design glazing system consistent with guidance and practices presented in the GANA Glazing Manual, GANA Laminated Glazing Manual, and GANA Sealant Manual, as applicable to project. Installed glazing is to withstand applied loads, thermal stresses, thermal movements, building movements, permitted tolerances, and combinations of these conditions without failure, including loss or glass breakage attributable to defective manufacture, fabrication, or installation; failure of sealants or gaskets to remain watertight and airtight; deterioration of glazing materials; unsafe engagement of the framing system; deflections beyond specified limits; or other defects in construction. Glazing Unit Design: Design glass, including engineering analysis meeting requirements of authorities having jurisdiction. Thicknesses listed are minimum. Coordinate thicknesses with framing system manufacturers. Design glass in accordance with ASTM E1300, and for conditions beyond the scope of ASTM E1300, by a properly substantiated structural analysis. Maximum Lateral Deflection: For glass supported on all four edges, limit center-of-glass deflection at design wind pressure to not more than the structural capacity of the glazing unit, the threshold at which frame engagement is no longer safely assured, 1/100 times the short-side length, or 19 mm (0.75 inch), whichever is less. DELIVERY, STORAGE AND HANDLING Delivery: Schedule delivery to coincide with glazing schedules so minimum handling of crates is required. Do not open crates except as required for inspection for shipping damage. Storage: Store cases according to printed instructions on case, in areas least subject to traffic or falling objects. Keep storage area clean and dry. Handling: Unpack cases following printed instructions on case. Stack individual windows on edge leaned slightly against upright supports with separators between each. Protect laminated security glazing units against face and edge damage during entire sequence of fabrication, handling, and delivery to installation location. Provide protective covering on exposed faces of glazing plastics, and mark inside as "INTERIOR FACE" or "PROTECTED FACE": Treat security glazing as fragile merchandise and packaged and shipped in export wood cases with width end in upright position and blocked together in a mass. Storage and handling to comply with manufacturer's directions and as required to prevent edge damage or other damage to glazing resulting from effects of moisture, condensation, temperature changes, direct exposure to sun, other environmental conditions, and contact with chemical solvents. Protect sealed-air-space insulating glazing units from exposure to abnormal pressure changes, as could result from substantial changes in altitude during delivery by air freight. Provide temporary breather tubes which do not nullify applicable warranties on hermetic seals. Temporary protections: The glass front and polycarbonate back of glazing are to be temporarily protected with compatible, peelable, heat-resistant film which will be peeled for inspections and re applied and finally removed after doors and windows are installed at destination. Since many adhesives will attack polycarbonate, the film used on exposed polycarbonate surfaces is to be approved and applied by manufacturer. Edge protection: To cushion and protect glass clad, and polycarbonate edges from contamination or foreign matter, the four (4) edges are to be sealed the depth of glazing with continuous standard thickness thermoplastic rubber tape. Alternatively, continuous channel shaped extrusion of thermoplastic rubber are to be used, with flanges extending into face sides of glazing. PROJECT CONDITIONS: Field Measurements: Field measure openings before ordering tempered glass products to assure for proper fit of field measured products. APPLICABLE PUBLICATIONS: Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only. American Architectural Manufacturers Association (AAMA): 800 Test Methods for Sealants 810.1-77 Expanded Cellular Glazing Tape American National Standards Institute (ANSI): Z97.1-14 Safety Glazing Material Used in Building Safety Performance Specifications and Methods of Test ASTM International (ASTM): C542-05(2017) Lock-Strip Gaskets C716-06(2020) Installing Lock-Strip Gaskets and Infill Glazing Materials C794-18 Adhesion-in-Peel of Elastomeric Joint Sealants C864-05(2019) Dense Elastomeric Compression Seal Gaskets, Setting Blocks, and Spacers C920-18 Elastomeric Joint Sealants C964-20 Standard Guide for Lock-Strip Gasket Glazing D635-18 Rate of Burning and/or Extent and Time of Burning of Self-Supporting Plastic in a Horizontal Position E84-20 Surface Burning Characteristics of Building Materials E119-20 Standard Test Methods for Fire Test of Building Construction and Material E1300-16 Load Resistance of Glass in Buildings F1233-08(2019) Standard Test Method for Security Glazing Materials and Systems F1642/F1642M-17 Test Method for Glazing and Glazing Systems Subject to Airblast Loadings Code of Federal Regulations (CFR): 16 CFR 1201-10 Safety Standard for Architectural Glazing Materials Glass Association of North America (GANA): 2010 Edition GANA Glazing Manual 2008 Edition GANA Sealant Manual 2010 Edition GANA Protective Glazing Reference Manual International Code Council (ICC): IBC International Building Code Intertek Testing Services Warnock Hersey (ITS-WHI) National Fire Protection Association (NFPA): 80-16 Fire Doors and Windows 252-12 Fire Tests of Door Assemblies National Fenestration Rating Council (NFRC) Safety Glazing Certification Council (SGCC) 2012: Certified Products Directory (Issued Semi-Annually). Underwriters Laboratories, Inc. (UL): 9-08(R2009) Fire Tests of Window Assemblies 263-14 Fire Tests of Building Construction and Materials Department of Veterans Affairs: Architectural Design Manual for VA Facilities (VASDM)
PRODUCT
GLASS Provide minimum thickness stated and as additionally required to meet performance requirements. Provide minimum 6 mm (1/4 inch) thick glass units unless otherwise indicated. Obtain glass units from single source from single manufacturer for each glass type. Clear Glass: ASTM C1036, Type I, Class 1.
GLAZING ACCESSORIES As required to supplement the accessories provided with the items to be glazed and to provide a complete installation. Ferrous metal accessories exposed in the finished work are to have a finish that will not corrode or stain while in service. Fire rated glazing to be installed with glazing accessories in accordance with the manufacturer s installation instructions. Spacers: ASTM C864: Channel shape having a 6 mm (1/4 inch) internal depth. Flanges not less 2.4 mm (3/32 inch) thick and web 3 mm (1/8 inch) thick. Lengths: 25 to 76 mm (1 to 3 inches). Shore A hardness of 40 to 50 Durometer. Glazing Tapes: Semi solid polymeric based closed cell material exhibiting pressure sensitive adhesion and withstanding exposure to sunlight, moisture, heat, cold, and aging. Shape, size and degree of softness and strength suitable for use in glazing application to prevent water infiltration. Complying with AAMA 800 for the following types: AAMA 810.1, Type 1, for glazing applications in which tape acts as the primary sealant. AAMA 810.1, Type 2, for glazing applications in which tape is used in combination with a full bead of liquid sealant. Spring Steel Spacer: Galvanized steel wire or strip designed to position glazing in channel or rabbeted sash with stops. Glazing Clips: Galvanized steel spring wire designed to hold glass in position in rabbeted sash without stops. Glazing Points (Sprigs): Pure zinc stock, thin, flat, triangular or diamond shaped pieces, 6 mm (1/4 inch) minimum size. Glazing Gaskets: ASTM C864: Firm dense wedge shape for locking in sash. Soft, closed cell with locking key for sash key. Flanges may terminate above the glazing beads or terminate flush with top of beads.
EXECUTION EXAMINATION Verification of Conditions: Examine openings for glass and glazing units; determine they are proper size; plumb; square; and level before installation is started. Verify that glazing openings conform with details, dimensions and tolerances indicated on manufacturer is approved shop drawings. Review for conditions which may adversely affect glass and glazing unit installation, prior to commencement of installation. Do not proceed with installation until unsatisfactory conditions have been corrected. Verify that wash down of adjacent masonry is completed prior to erection of glass and glazing units. PREPARATION For sealant glazing, prepare glazing surfaces in accordance with GANA Sealant Manual. Determine glazing unit size and edge clearances by measuring the actual unit to receive the glazing. Shop fabricate and cut glass with smooth, straight edges of full size required by openings to provide GANA recommended edge clearances. Verify that components used are compatible. Clean and dry glazing surfaces. Prime surfaces scheduled to receive sealants, as determined by preconstruction sealant-substrate testing. INSTALLATION GENERAL Install in accordance with GANA Glazing Manual, GANA Sealant Manual, IGMA TB-3001, and IGMA TM-3000 unless specified otherwise. Glaze in accordance with recommendations of glazing and framing manufacturers, and as required to meet the Performance Test Requirements specified in other applicable sections of specifications. Set glazing without bending, twisting, or forcing of units. Do not allow glass to rest on or contact any framing member. Glaze doors and operable sash, in a securely fixed or closed and locked position, until sealant, glazing compound, or putty has thoroughly set. Tempered Glass: Install with roller distortions in horizontal position unless otherwise directed. INSTALLATION INTERIOR WET/DRY METHOD (TAPE AND SEALANT) Cut glazing tape to length and install against permanent stops, projecting 1.6 mm (1/16 inch) above sight line. Place setting blocks at 1/4 points with edge block no more than 150 mm (6 inches) from corners. Rest glazing on setting blocks and push against tape to ensure full contact at perimeter of pane or unit. Install removable stops, spacer shims inserted between glazing and applied stops at 600 mm (24 inch) intervals, 6 mm (1/4 inch) below sight line. Fill gaps between pane and applied stop with sealant to depth equal to bite on glazing, to uniform and level line. Sealant type is to be compatible with glazing tape. Trim protruding tape edge. REPLACEMENT AND CLEANING Clean new glass surfaces removing temporary labels, paint spots, and defacement after approval by COR. Replace cracked, broken, and imperfect glass, or glass which has been installed improperly. Leave glass, putty, and other setting material in clean, whole, and acceptable condition. PROTECTION Protect finished surfaces from damage during erection, and after completion of work. Strippable plastic coatings on colored anodized finish are not acceptable.
Autodesk Build Construction Management Platform
Autodesk build construction management platform: The Contractor shall utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform. The Contractor shall accomplish and complete the following tasks upon award of contract: Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR within 14 days of contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) Contractor staff granted access to the ACC platform shall complete ACC training through ProductivityNOW eLearning platform and provide certificates of completion to COR within 12 Calendar days of access being granted. Initial access to ProductivityNOW eLearning platform shall expire after 12 Calendar days after online access is granted. D) Additional Staff and Subcontractors can be added at any time with a request submission to the project COR. The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration include but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. Contractor shall inform the COR of any staff changes within 2 business days from the change. Staff changes pertain to staff granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor s ability to maintain required utilization of the platform. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.

More opportunities from Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)

Same awarding agency

NAICS: 811210
New
Federal
J065- Q2 SERVICES (BASE+4) Globus NYH Service Contract (VA-27-00004429)
Solicitation # 36C24227Q0068
The Department of Veterans Affairs Network Contracting Office 2 intends to award a sole source contract to Globus Medical, Inc. for the annual preventative maintenance, corrective maintenance, and repair of proprietary Global Surgical Equipment. This includes the ExcelsiusGPS robotic system and ExcelsiusE3D system. The services will be performed at the VA New York Harbor Healthcare System's Manhattan and Brooklyn campuses. The base period of performance is scheduled from January 1, 2027, to December 31, 2027, with the possibility of four additional option years. The procurement falls under NAICS code 811210 for Electronic and Precision Equipment Repair and Maintenance, which has a small business size standard of 34 million dollars. It is noted that Globus Medical, Inc. has an exclusive authorized Service-Disabled Veteran Owned Small Business partner, SDV Office Systems, LLC, for sales of this equipment to federal government facilities. While this is a notice of intent for a sole source award, interested firms may submit written notification and supporting evidence of their ability to perform the requirements to Kaitlyn Morgan via email by October 27, 2026, at 12:00 p.m. EST. The government maintains sole discretion on whether to compete the procurement based on the responses received.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 5 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238220
New
Federal
W045--Boiler Rental
Solicitation # 36C24227Q0042
The Department of Veterans Affairs is seeking a firm-fixed price contract for the temporary rental, installation, and maintenance of a fire tube steam boiler at the VA Hudson Valley Healthcare System Montrose Campus. The period of performance is scheduled from November 1, 2026, through March 31, 2027, with a required installation date of November 1, 2026, and a ready-for-service date of December 1, 2026. The equipment must be an 800 HP unit capable of a 95 PSI operating pressure to support a historical peak steam load of 120,000 lb/hr. While a 9 PPM NOx requirement is listed, the government has indicated that a unit rated at 30 PPM NOx is acceptable to ensure the delivery schedule is met. The government will furnish the fuel, and the boiler will be located on the east side of the plant. The contractor is responsible for providing approximately 200 feet of 6-inch diameter piping, supports, valves, and fittings for boiler feedwater, as well as independent controls to monitor key parameters and emergency stop capabilities. Maintenance requirements include a minimum of 10 hours of monthly service and the submission of two internal inspection reports, one prior to delivery and one at the end of the rental period. Compliance with the VHA Safety Device and Testing Manual is mandatory, and the vendor must obtain all necessary hot work and confined space permits. This is a total small business set-aside under NAICS 238220. Award evaluations will be based on a combination of price and technical factors, including past performance, with technical and past performance weighted equally to price.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in about 1 hour
View Details
NAICS: 621511
New
Federal
Q301--FY27 (BASE+4) STAT Laboratory Testing - Syracuse (VA-27-00010334)
Solicitation # 36C24227Q0069
The Department of Veterans Affairs VISN 2 Network Contracting Office intends to award a firm fixed-price contract for STAT laboratory testing services at the Syracuse VA Medical Center. The proposed contract structure includes a base period followed by four option periods. The government intends to sole source this requirement to University Pathologists Laboratories under FAR 6.302-1(a)(2), though this special notice serves as market research to identify other capable providers, including various small business socioeconomic categories. The scope of work involves the 24/7, 365-day-a-year analysis, monitoring, and reporting of clinical and surgical specimens, utilizing advanced methods such as electron microscopy and molecular studies. Key operational requirements include picking up specimens within 30 minutes of a request and delivering final written reports within five working days. Critical results require immediate notification to authorized providers. To be eligible, the contractor must employ board-certified pathologists and accredited technologists and maintain mandatory certifications, including a NYS Department of Health Clinical Laboratory Permit, a CLIA license, and CAP or Joint Commission accreditation. This acquisition falls under NAICS code 621511. Interested parties must provide documentation of their technical expertise and socioeconomic status to the contracting officer within 10 calendar days of the notice publication.
Medical Laboratories

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 541330
New
Federal
C1DA--NRM A/E- 528A7-27-112 Fire Alarm Panel Upgrade
Solicitation # 36C24227Q0070
The Department of Veterans Affairs, through Network Contracting Office 02, has issued a Request for Information to identify qualified Architect-Engineer firms for the upgrade of an obsolete Edwards EST-3 fire alarm system at the Syracuse VA Medical Center in New York. This is a sources sought notice and not a formal solicitation for proposals. The scope of work involves providing complete design and cost estimation services, including the upgrade of fire alarm control panels and remote annunciators, the installation of a new master control panel and fiber loop network, the expansion of the addressable system to additional campus buildings, and the removal of the existing fireman telephone system. The selected firm must also develop a phasing plan to ensure continuous fire alarm protection during construction and provide construction period services. A critical requirement for this project is that the prime firm must have a registered Fire Protection Engineer (FPE) on staff, and all drawings must be stamped by an FPE with no exceptions. All designs must comply with the latest editions of NFPA 70, NFPA 72, and the NEC, as well as applicable VA construction standards and fire protection design criteria. This opportunity falls under NAICS code 541330 for Engineering Services. Interested and capable sources must submit a written capability statement to the designated contract specialist by November 3, 2026, at 10:00 EST.
Engineering Services

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS