Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

ADKINS WATER TRUCK SERVICE

UEI: TKUSWJYFKAB3

ADKINS WATER TRUCK SERVICE is a federal contractor, registered under UEI TKUSWJYFKAB3. It has been awarded $1,947,080 in federal contracts. Primary work spans Other Heavy and Civil Engineering Construction. Top awarding agencies include Department Of Defense (dod).

Contact Information

Registration and classification details

Registration

UEI Code

TKUSWJYFKAB3

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Adkins Water Truck Service provides specialized water truck operations and support. Their core capabilities center on the delivery and management of water resources to support heavy and civil engineering construction projects. The company has established a performance history with the Department of...

Adkins Water Truck Service provides specialized water truck operations and support. Their core capabilities center on the delivery and management of water resources to support heavy and civil engineering construction projects. The company has established a performance history with the Department of Defense, where they provide water truck services to support agency requirements. Their industry focus is centered on Other Heavy and Civil Engineering Construction, specializing in the logistical support and equipment operations necessary for large-scale infrastructure and construction environments.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

2

All time

Active

0

Currently performing

Completed

2

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with ADKINS WATER TRUCK SERVICE

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ADKINS WATER TRUCK SERVICE

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ADKINS WATER TRUCK SERVICE's top NAICS codes and agencies

NAICS: 237990
New
SLED
CSP-26-08-06 Kingwood Campus Flood Mitigation Project
Solicitation # CSP-26-08-06
The Lone Star College System has issued Competitive Sealed Proposal CSP-26-08-06 for the Kingwood Campus Flood Mitigation Project. The primary objective is to protect ten campus buildings previously damaged by Hurricane Harvey through the design, construction, and implementation of a new continuous structural flood wall, passive flood gates, and new site detention measures for stormwater management. The scope of work is strictly limited to the site and excludes modifications to existing buildings. Key deliverables include a functional flood mitigation system and updated site infrastructure, such as new sidewalks, lighting, and landscaping. All work must comply with approved plans, City of Houston standards, and TCEQ requirements. Proposals are due by January 22, 2027, and will be evaluated using a Best Value procurement method. Scoring is weighted heavily on price (50 points), followed by experience, reputation, and references (20 points), quality of goods and services (10 points), and safety records (5 points). Qualified offerors must provide a detailed cost proposal, a safety record for 2023-2026, and documentation of experience with FEMA-funded and public entity projects. Key personnel, such as the Project Manager or Superintendent, must possess at least 10 years of construction experience, including participation in two flood mitigation projects and one project exceeding 10 million dollars. The contract requires strict adherence to material standards, including ASTM specifications for thin brick, calcium silicate, and granite, with independent laboratory testing required for masonry units. Financial protections include performance bonds for bids over 100,000 dollars and payment bonds for bids over 25,000 dollars. Additionally, the agreement is subject to annual budget appropriations, and vendors must certify compliance with the Davis-Bacon Act, the Buy America Act, and various non-discrimination and critical infrastructure security regulations.
LONE STAR COLLEGE SYSTEM

POSTED

about 5 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237990
New
SLED
(RFP) 27-27, Richard Craig Park Athletic Complex Renovation
Solicitation # 27-27
Henry County is soliciting proposals for a complete turnkey renovation of the Richard Craig Park Athletic Complex in McDonough, Georgia. The project focuses on modernizing baseball and softball facilities and converting four tennis courts into eight dedicated pickleball courts to enhance public access and support league play and community events. The work is structured in two phases to minimize operational disruptions: Phase One covers the renovation of Fields 1 through 5, while Phase Two includes Fields 6 through 8, the Sunshine League therapeutic field, the concession building, and batting cage improvements. Key technical deliverables include laser grading, drainage improvements, irrigation system replacement, and the installation of certified 419 Bermuda sod and new athletic infield mix. Qualified contractors must hold a valid license from the State Licensing Board for Residential and General Contractors and provide a minimum one-year warranty on all labor and materials. Proposals are due by 3:00 PM on December 17, 2026, and must be submitted via the county's eProcurement portal or delivered in person to the Purchasing Department. Submissions must include a base bid lump sum, a detailed schedule of values, a bid bond of at least 5 percent, and a completed W9 form. The successful bidder will be required to provide 100 percent Performance and Payment Bonds within 15 days of the award. Evaluation is based on a 100-point scoring system, with potential additional points for oral presentations, and all work must strictly adhere to ADA accessibility requirements and OSHA safety standards.
Henry County Board of Commissioners

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Y--NAMA 326209 East Potomac Seawall Design Build
Solicitation # 140D0427RP001
The Department of the Interior, through the Interior Business Center and National Park Service, is seeking a firm-fixed price contract for the NAMA 326209 East Potomac Seawall Design Build project in Washington, DC. The project involves the rehabilitation of approximately 20,700 linear feet of shoreline and seawall infrastructure, specifically utilizing Z-panel and stamped concrete structures. Key objectives include restoring shoreline functionality, improving drainage, preserving historic and environmental resources, and ensuring Architectural Barriers Act-compliant public access. The estimated period of performance is 51 months after award, with a total project value exceeding 10 million dollars and a required bonding capacity of at least 322 million dollars. The procurement will follow a two-phase design-build selection procedure per FAR 36.101-2. In Phase One, up to three contractors will be selected based on their general technical approach, technical qualifications, and past performance, with price not being a consideration. Phase Two will utilize a best-value tradeoff approach where non-price factors are significantly more important than price. Proposals must be submitted via email to the Contracting Officer, Ericka Graham. The contract includes specific requirements for small business participation, including targets for WOSB, SDVOSB, HUBZone, and DOI Indian Small Business Economic Enterprises, and mandates compliance with Davis-Bacon wage determinations.
Ibc Acq Svcs Directorate (00004)

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
USACE SPK DBB Construction - LAR C3B South - Sacramento, CA
Solicitation # W9123827BA002
The United States Army Corps of Engineers Sacramento District anticipates a design-bid-build construction requirement for the Lower American River Contract 3B South project in Sacramento, California. This effort focuses on erosion control and levee strengthening along approximately 1.5 miles of the south bank, extending from Watt Avenue upstream toward Mayhew Drain. The scope of work includes constructing launchable rock toes and trenches, installing bank protection and tie-backs, regrading riverbank slopes, and placing instream wood structures on planting benches. The project is organized into four phases: tree clearing and transplant, two years of erosion protection, and a final greening phase. In-water work is restricted to the window between July and October. The government estimates a target price range between 45 million and 60 million dollars, with a construction period of 510 calendar days. The requirement is anticipated to be a small business set-aside under NAICS 237990, solicited as a firm-fixed price contract via an Invitation for Bids in October 2026. Key compliance requirements include CMMC Level 1 Self Certification, E-Verify participation, and the requirement for the successful offeror to enter into a Project Labor Agreement. Bidders must be registered in both SAM and the Procurement Integrated Enterprise Environment. Notably, the project is subject to pending litigation that currently prohibits ground or vegetation disturbing activities; therefore, the government reserves the right to delay or cancel the solicitation without liability.
W075 Endist Sacramento

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Arcadia Wet Well Rehabilitation_Amendment 0004
Solicitation # W912BV26RA033
Solicitation W912BV26RA033 is a firm fixed price contract issued by the U.S. Army Corps of Engineers, Tulsa District, for the rehabilitation of wet well low flow gates at Arcadia Dam in Oklahoma County, Oklahoma. The project magnitude is estimated between $1,000,000 and $5,000,000 with an estimated duration of 500 calendar days. The scope of work includes the fabrication of two structural steel bulkheads, the removal and disposal of existing low flow gates in the north wet well, and the installation of new ductile cast iron low flow inlet and low flow gates. Additionally, the contractor must replace all angle H frames and structural bolts in both the north and south wet wells. Optional tasks may include similar removal and installation services for the south wet well and the procurement of six additional ductile cast iron inlet gates. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process, where proposals are evaluated for acceptability based on non-cost factors including past performance, key personnel, and performance capability. To be technically acceptable, offerors must demonstrate experience with at least one to two recent relevant projects exceeding $250,000 in value involving hydraulic steel structures, water control gates, or heavy lifting in confined environments. All key personnel must be U.S. citizens or documented U.S. workers. The contractor is required to implement a three-phase control system under a Contractor Quality Control Plan and adhere to EM 385-1-1 safety requirements. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 16, 2026, at 2:00 PM CDT.
W076 Endist Tulsa

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Veterans Parkway Fitness Station Replacement Project (D-933)
Solicitation # E1312-26C
The Veterans Parkway Fitness Station Replacement Project (D-933), solicitation E1312-26C, is a public works project managed by the City of Manhattan Beach Public Works Department. Located at 1104 N. Valley Drive, the scope of work includes mobilization, demolition, grading, and erosion control to replace existing exercise equipment and pads. Key deliverables include the installation of City-provided exercise equipment with reinforced PCC foundations, the replacement of a drinking fountain, the installation of signage, and the reconstruction of two ADA parking stalls using permeable concrete. The project also involves the restoration of irrigation, planting, and water quality improvements. Work must be performed in strict accordance with the California Building Code, City/County standards, and the Municipal Separate Storm Sewer System National Pollutant Discharge Elimination System permit. The project is scheduled for an anticipated award in January 2027, with a total duration of 60 working days, split between 20 days for preconstruction and 40 days for construction. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on financial standing, general competency, and bid accuracy. Bidders must submit their proposals via the OpenGov portal by December 10, 2026, including a signed Contractor's Statement, references, a noncollusion declaration, and evidence of signing authority. Required bonding includes a bid bond of 10%, performance and payment bonds at 100% of the contract price, and a one-year warranty bond of 10%. As a public work, the project is subject to Labor Code Section 1770 et seq., requiring all contractors and subcontractors to pay prevailing wages as determined by the Department of Industrial Relations.
Public Works

POSTED

about 20 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a qualified contractor to provide all labor, equipment, and materials necessary to stabilize eroding areas, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. All work must be completed no later than December 31, 2026, and must conform to industry standards of strength, quality, and workmanship. To be considered for the award, bidders must submit a signed cover page, a completed Contractor's Qualification Form, and a signed bid schedule. Evaluation is based on best value, with mandatory requirements including evidence of at least three successful projects of similar scope completed within the last five years. Bidders must also comply with prevailing wage rates per Texas Government Code and certify adherence to various state and federal regulations, including E-Verify and the Buy American Act for iron and steel. Contract administration is managed by the Infrastructure Division, with payments typically issued within 30 days of invoice acceptance. For projects exceeding 25,000 dollars, bid security in the form of a bond for at least five percent of the total amount is required. The selected contractor will be responsible for the security of all on-site materials and must ensure all work is tested and operational prior to final acceptance by the department.
Parks and Wildlife Department

POSTED

about 23 hours ago

DEADLINE

in 6 days
View Details