Y--NAMA 326209 East Potomac Seawall Design Build
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Place of Performance
VASet-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation ONLY. While the Government is not requesting proposals currently, a draft solicitation and pertinent attachments are attached for review and consideration.
Proposed Solicitation Issuance Date: On or around 11/30/2026 with Phase One submittals due within 15 days of issuance. See the draft solicitation for instructions and evaluation factors for Phase One.
This is currently an unfunded requirement with a high expectation that funds will be available.
Project Title: NAMA 326209 EAST POTOMAC SEAWALL DESIGN BUILD
Description:
NPS requires Design-Build (DB) services for the rehabilitation of approximately 20,700 linear feet of shoreline and seawall infrastructure at East Potomac Park in Washington, DC. The project area includes the shoreline along both the Potomac River and Washington Channel and encompasses associated improvements required to provide long-term shoreline protection, improve drainage performance, preserve public access and protect Park resources.
The Contractor shall develop rehabilitation alternatives for NPS evaluation and approval, and implement solutions that satisfy the following project objectives:
* Rehabilitate or replace deteriorated shoreline protection infrastructure;
* Restore shoreline functionality and reduce impacts associated with daily tidal cycles, minor storm events, erosion, debris loading, ice forces, and long-term settlement;
* Evaluate and establish the appropriate historic functional height for shoreline segments within the Park based on historical documentation, engineering analysis, site conditions, and the NPS objectives;
* Evaluate opportunities to accommodate future shoreline adaptation measures consistent with NPS planning objectives;
* Reuse and repurpose existing seawall materials where feasible and appropriate;
* Maintain drainage and flood recovery performance;
* Maintain, restore, and develop continuous public access to include Architectural Barriers Act (ABA)-compliant and universal access circulation routes;
* Protect existing utilities and adjacent infrastructure;
* Preserve historic, cultural, and environmental resources;
* Incorporate sustainable, durable, and low operations and maintenance solutions that minimize future operational burden on the NPS.
Type of Procurement:
Two-Phase Design-Build Selection Procedures (FAR 36.101-2 as deviated). The Government anticipates awarding one firm-fixed price contract for the design and construction services required. One solicitation will be issued with the Phase 1 and Phase 2 requirements. A draft solicitation is attached for review and consideration.
Estimated Price Range: More than $10,000,000.
Estimated Period of Performance: 51 months after award
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Interior → Ibc Acq Svcs Directorate (00004)
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
