This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

14816 Polyalphaolefin (PAO) Chiller Skid System

Closed
FA822-26-14816V2Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The solicitation FA822-26-14816V2 seeks a Firm Fixed Price contract for the supply, installation, and commissioning of a Polyalphaolefin (PAO) chiller skid system at Building 1513, Hill Air Force Base, Utah. The system is designed to provide precise cooling for aircraft representative equipment and includes two redundant PAO chiller skids, six manifolds with remote HMI panels, pumps, distribution piping, controls, instrumentation, and associated components. Installation must occur without disrupting ongoing operations and includes construction of a sound-attenuated chiller room, routing of piping above the drop ceiling, and integration of all subsystems per strict technical standards including UFC, IBC, NFPA, NEC, ASHRAE, and Hill AFB IFS. All materials must be new, commercial-grade, TAA-compliant, and furnished with complete documentation, including AutoCAD drawings free of proprietary markings, maintenance manuals, wiring diagrams, and redline revisions submitted within 30 days of award. The contractor is responsible for crating and vacuum-packing equipment for transport, with delivery required to the specified FOB point at Hill AFB, and must ensure all equipment meets preservation standards to prevent moisture and contamination. The contract requires compliance with stringent security protocols tied to Special Access Program Facilities (SAPF), including limitations on wall penetrations, use of metal conduit with nonconductive mounting, specific shielded data cabling, and E-stop circuitry using copper transmission lines. All contractor personnel must be cleared by the SWEG Security Office and identify as contractors while on-site, with the Government reserving the right to remove personnel for security or behavioral concerns. Technical submittals, including design drawings and operation manuals, are subject to review and approval by the Government Project Engineer, with strict timelines for revision and resubmission. Payment must be processed through Wide Area Workflow (WAWF), with all expenditure documentation submitted to the Contracting Officer’s Representative prior to invoicing. The evaluation factors for award are price, past performance, and technical capability in that order, with award based on the most advantageous proposal under FAR Part 12, not necessarily the lowest price. The contract has a performance period of 365 days following award, and offerors must be registered in SAM with a valid UEI and CAGE code, and must comply with numerous FAR clauses related to whistleblower rights, subcontracting, labor, trafficking, Buy American, and cybersecurity.

General Info

Firm Fixed Price contract for redundant PAO chiller system delivery, installation, and commissioning at Hill AFB with strict compliance and security requirements.

NAICS

333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

Place of Performance

Hill Air Force Base, UT, 84056, USA

Set-Aside

NONE

Documents

4

RFQ FA822-26-14816-04242026 for PAO Chiller Skid System

PDF, High priority: read this firstrfq
High

RFQ FA822-26-14816V2 PAO Chiller Skid System

PDF, High priority: read this firstrfq
High

SOW 14816 Install PAO Chiller System Hill AFB Jan 2026

PDF, High priority: read this first32 pages · sow
High

14816 PAO Chiller Q&A

DOCX, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8222 Afsc Ol H Pzie
Contacts2 people available
OfficeHILL AFB, UT, 84056-5805, USA
Office AddressHILL AFB, UT, 84056-5805, USA

Full Description

Show more

This requirement was previously posted under Notice ID 14816/Solicitation No. FA8222-26-14816 and has been reissued under full and open competition basis.


-------------------------------------------------------------------


Solicitation Number: FA822-26-14816V2 is issued as a Request for Quote (RFQ) for 14816 Polyalphaolefin (PAO) Chiller Skid System. The requirement consists of installing a new PAO chiller, pump, manifolds, distribution piping, controls, and instrumentation. The system will provide cooling for aircraft representative equipment.



This acquisition is not a set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.


See attached combined synopsis/solicitation document for full description of the requirment, along with SOW.


-------------------------------------------------------------------


Amendment 1 05.07.2026 - 14816 PAO Chiller Q&As attachment

More opportunities from Department Of Defense → FA8222 Afsc Ol H Pzie

Same awarding agency

NAICS: 238220
Federal
16292 Steam Boiler Replacement
Solicitation # FA822226Q3345
Solicitation FA8222-26-Q-3345 is a firm fixed price, total small business set-aside contract for the design and construction of a replacement heating system at Building 1515, Hill Air Force Base, Utah. The project objective is to transition the facility from an existing steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system. The scope of work includes complete mechanical, electrical, and controls engineering, the demolition and disposal of existing steam systems, and the installation of high-efficiency boilers, such as the RBI Futera III, along with necessary piping and venting. The new system must be integrated into the facility's Direct Digital Control and Energy Management Control System via BACnet. The estimated project value is between 1 million and 5 million dollars. The period of performance is weather-dependent, with design and material acquisition required before the typical April-May steam shut-off, followed by a 60-day construction window. Award may be based on either Lowest Price Technically Acceptable or Best Value Trade-Off criteria, with the latter emphasizing technical soundness and a demonstrated history of similar design-build projects. Key requirements include the provision of a Utah-licensed Professional Engineer, adherence to Davis-Bacon Act wage determinations, and compliance with Hill AFB Installation Facilities Standards. Final acceptance is contingent upon successful system commissioning, delivery of as-built drawings, and the completion of operator training for government personnel.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

8 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS