Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on March 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-494DOT-FINAD-B-51281 | REBID CO Vertical Bridge Port Mill FY26

Closed
26-494DOT-FINAD-B-51281State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
This Davis Bacon construction project, managed by Parsons for the FAA Airport Technology Research and Development branch, involves the construction of a concrete test pavement at the William J. Hughes Technical Center in Atlantic City, New Jersey. The scope of work includes the controlled demolition of existing pervious runway pavement, minor design adjustments, and the installation of an aggregate subbase and concrete test slabs measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. The project also requires updating the asphalt base course to a stabilized drainable base course. The subcontractor is responsible for procuring materials, removing construction waste, and providing geotechnical engineering and roadway materials testing services. Construction will be subject to rigorous material characterization tests, including California Bearing Ratio and Plate Load tests, with operations phased to allow for continuous subgrade adjustments. Work is generally scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This solicitation is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

37 minutes ago

DEADLINE

in 3 months
NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Dalton Utilities

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation 26-494DOT-FINAD-B-51281, posted on March 3, 2026, by the Illinois Department of Finance and Administration, seeks the procurement of a heavy-duty manual knee-type vertical milling machine for performance in Springfield, Illinois. The required equipment must feature a minimum 12 by 58 inch table, a 5 HP motor with a digital variable speed range of 70 to 4,000 RPM, and an NT40 taper. Technical requirements specify Turcite-B coated ways, hardened and ground box ways, and a milling head capable of 360 degree swiveling and specific tilt ranges. The machine must include a 3 phase motor with low voltage control and a safety feature to prevent self-starting after power failure. Essential accessories include a digital readout system, power feeds on the table and saddle, a motorized rapid knee positioning system, an 8 inch Kurt vise with swivel base, a 52 piece clamping kit, and various lubrication and coolant systems. The contract is governed by the State of Illinois standard terms and conditions, requiring vendors to maintain compliance with the Illinois Procurement Code and provide mandatory certifications regarding legal status, tax compliance, and ethical conduct. Key administrative requirements include adherence to the State Prompt Payment Act for invoicing and a twelve month warranty against defects. Vendors must comply with equal opportunity regulations, prevailing wage laws, and specific insurance mandates, including one million dollars in auto liability coverage. The State retains the right to terminate the contract for cause immediately or for convenience with thirty days notice, and all work is considered work for hire with exclusive ownership granted to the State of Illinois.

General Info

Illinois contract for vertical bridge port mill construction in Springfield, requiring compliance with state laws.

Place of Performance

2420 S Dirksen Parkway, Springfield, IL, 62704, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first5 pages · standard-illinois-certifications
High
PDF, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline added: Mar 11, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Finance & Administration
Contacts1 person available
OfficeSpringfield, IL, 62704, USA
Office AddressSpringfield, IL, 62704, USA
Contacts
Eric SteffenPurchaser

Full Description

Show more
REBID CO Vertical Bridge Port Mill FY26

More opportunities from Illinois → Finance & Administration

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS