Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

726-6UT-1853 - Conduit Installation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 7 has authorized Fiber Asset Co LLC dba Zayo to install new conduit and one Crown Castle vault along State Routes 1 and 213 at post mile 13.112 in Los Angeles, involving 333 linear feet of directional boring and 6 linear feet of trenching with a maximum excavation depth of 48 inches, an average width of 12 inches, and a total length of 339 feet. The project includes temporary traffic control measures but does not require the relocation of any public utilities or the acquisition of additional right-of-way. All work is confined to existing state infrastructure and right-of-way, ensuring minimal disruption to public services and transportation corridors. The permit is issued under project number 726-6UT-1853 and is managed by Caltrans personnel stationed in Los Angeles, with direct contact available through Mojgan Abbassi at the provided phone and email for permitting and compliance inquiries.

General Info

Zayo to install conduit and vault along SR 1 and 213 with 339 feet of trenching and boring, no right-of-way acquisition needed.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSEN ENV SCI (SPEC)

Full Description

Show more
Caltrans approves the encroachment permit for Fiber Asset Co LLC dba Zayo, authorizing Video Voice Data (VVD) to bore 333 Linear Feet and trench 6 Linear Feet to place new conduit and one Crown Castle vault, as well as perform temporary traffic control activities on State Routes (SR) 1 and 213, at post mile 13.112, in the City and County of Los Angeles. Excavation will have a maximum depth of 48 inches, an average width of 12 inches, and a maximum length of 339 feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Perimeter Intrusion Detection System (PIDS) Phase IIIThe Port of Seattle’s Aviation Project Management Group is preparing for Phase III of the Perimeter Intrusion Detection System (PIDS) Infrastructure project, scheduled for release in August 2026. This initiative focuses on deploying critical power and communication infrastructure to support PIDS technology components including Lidar, Radar, and camera systems designed to enhance perimeter security. The work will involve the installation and integration of these underlying systems to enable full operational capability of the intrusion detection network. The project is classified under NAICS code 237130, indicating it pertains to utility system construction, suggesting significant civil and electrical infrastructure development. Primary point of contact for the forecast is Yanet Maldonado, reachable via email or phone, with Michelle Carioto serving as the Project Manager. While no solicitation number has been issued yet and details such as the exact location, set-aside status, or procurement type are not specified, the announcement signals upcoming procurement activity by the Port of Seattle for infrastructure services essential to aviation security. Stakeholders are encouraged to monitor the provided UI link for formal solicitation release, which may include specific technical requirements, bid submission guidelines, and performance expectations tied to the deployment timeline.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237130
New
UTILITY & BACKUP POWER INDEPENDENCE, MISSION CONTROL STATION
Solicitation # utility-backup-power-independence-mission-control-station
The contract seeks small businesses to deliver comprehensive, multi-disciplined support services for the construction and ongoing maintenance of an independent backup power plant located in Colorado, ensuring uninterrupted mission-critical operations. Scope of work encompasses a full range of systems including plumbing, HVAC, fire suppression, mechanical equipment and piping, electrical controls, telecommunications, fire alarm systems, lightning protection, cybersecurity measures, physical security escorts, and system commissioning, with a specific focus on generator installation and reliability. All work must be performed by eligible small business entities, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, in alignment with the SBA’s set-aside requirements under NAICS code 237130. The solicitation, issued by BSGI-Weston JV, LLC, is open for responses until September 1, 2026, with a posted date of August 5, 2026. Proposals must be submitted through the federal opportunity portal, and all contractors must demonstrate proven capability across multiple technical disciplines to support the complex integration and long-term operation of a standalone power infrastructure. The primary point of contact for inquiries is Erica Vecchio, whose email and phone number are provided for official correspondence. Performance will occur exclusively in Colorado, and no specific office address or facility details are provided beyond the state location.
BSGI-Weston JV, LLC

POSTED

about 2 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
SLED
Spacer Cable and Partial Pole Replacement
Solicitation # BD-27-1293-MAR15-MAR15-131753
The Town of Marblehead is seeking qualified contractors for the Spacer Cable and Partial Pole Replacement project under solicitation number BD-27-1293-MAR15-MAR15-131753, issued by the Electric Light department. The request for proposals was posted on August 4, 2026, with a firm deadline for submissions set for August 19, 2026, at 3:00 PM Eastern Time. All proposals must be submitted through the town’s procurement portal, and copies of the solicitation documents can be accessed via https://procurement.opengov.com/portal/marblehead. The work will take place at Commercial Street in Marblehead, Massachusetts, 01945, and contractors must be prepared to perform all work at this location. The project involves replacement of partial utility poles and installation of spacer cables, requiring skilled labor and adherence to local infrastructure standards. The primary point of contact for inquiries is Jonathan Blair, the Purchaser, who can be reached through the official procurement system. The solicitation is designated under the SLED category (State, Local, or Education), and no specific set-aside provisions apply. Interested parties must use the provided Commbuys link to view detailed bidding instructions and submission requirements, ensuring full compliance with all technical, administrative, and timeline expectations outlined in the proposal packet.
MAR15 - Electric Light

POSTED

about 17 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
SLED
Tennyson Park Streetlight Project
Solicitation # 06950
The Tennyson Park Streetlight Project, solicited under number 20260803048 by the City of Hayward Department of Public Works, entails comprehensive streetlighting upgrades along Panjon Street and Huntwood Avenue in Hayward, California. The scope includes horizontal directional boring, installation of conduit, pull boxes, and hand holes; furnishing and mounting streetlight poles with LED luminaires featuring dimmable and smart control systems integrated with a central traffic management platform; pulling conductors and wiring; connecting to electrical service; saw cutting; excavation; backfill and compaction; restoration of asphalt pavements, concrete curbs, gutters, and sidewalks; and implementation of traffic and pedestrian control systems. All work must adhere to the 2018 State of California Standard Specifications and Standard Plans, with modifications to interpret state-level references as applying to the City of Hayward. The City of Hayward Standard Details also apply, and specific clauses from the state specifications have been amended, deleted, or supplemented—including removal of partnering, dispute resolution, and arbitration sections—while bonding, insurance, labor, and indemnification clauses have been revised to align with municipal requirements. The project demands strict compliance with safety, environmental, and labor regulations, including prevailing wage rates under California Labor Code, mandatory DIR registration, and insurance requirements of at least $1 million per occurrence for commercial general and automobile liability coverage from California-admitted insurers with an A.M. Best rating of no less than A:XI. Bidders must qualify as responsible contractors with a record of successful project completions on time and without defects or disputes, having completed at least three comparable contracts. DBE participation is a mandatory pass/fail gate, requiring either meeting the established goal or demonstrating good faith efforts to engage disadvantaged business enterprises. The bid must include a certified or cashier’s check or bond equal to 10% of the bid amount, and upon award, the contractor must provide performance and payment bonds each for 110% of the bid value. The contract time is limited to fifty working days, commencing within ten calendar days of receiving a Friday Notice to Proceed. All materials must be labeled per California OSHA standards, pull box lids must be clearly marked “Streetlighting” and not bolt-down style, and temporary no-parking signs must be poly-coated cardboard, 12x18 inches, red and white. Final acceptance requires formal engineering certification, submission of a notice of completion within ten days, and payment of retainage within thirty days post
City of Hayward

POSTED

about 17 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237130
New
Federal
New CS Fiber Optics Infrastructure Rehoming Project-156th WG PR ANG
Solicitation # W50S9326QA011
The 156th Wing at Muñiz Air National Guard Base in Carolina, Puerto Rico is soliciting bids for a firm fixed-price contract to relocate and install new fiber optic infrastructure across multiple buildings on the base. The project involves installing 12-strand and 72-strand single-mode fiber optic cables between key facilities, terminating all strands with APC LC connectors, testing each fiber for insertion loss and OTDR trace results, and delivering comprehensive as-built documentation. All work must comply with TIA-606-D labeling standards and TIA/EIA installation guidelines. The contract has a strict 60-day performance period beginning upon award, and the Government’s target price range is between $250,000 and $500,000. This is a 100% Small Business Set-Aside under NAICS code 237130 with a size standard of $19 million. The contractor must provide all labor, materials, equipment, supervision, and quality control except for government-furnished items specified in the Statement of Work. All offerors must be registered in SAM.gov and submit a completed SF-1449 with pricing for CLIN 0001, a detailed list of required equipment and labor disciplines, and a realistic project schedule. Proposals are due by August 17, 2026 at 10:00 AM EST and must be emailed to angel.solis.2@us.af.mil with a specific subject line format. Site visits were held on August 3, 2026, and required prior registration with government-issued ID, vehicle registration, and proof of insurance. Security at the installation is highly restricted: firearms are prohibited, and all personnel must pass background checks and complete mandatory antiterrorism and OPSEC training within 10 days of contract start. Far clauses 52.212-1, 52.212-2, and 52.222-55 apply, and the Wage Determination must be adhered to despite the rescission of Executive Order 14026, as the FAR clause remains in effect. The award will be made to the most advantageous offeror based on price and technical merit without discussions, and past performance may serve as a disqualifying factor. Payment will be processed electronically through WAWF using the Invoice as 2-in-1 (Services Only) format, and all
W7PA Uspfo Activity Prang 156

POSTED

about 18 hours ago

DEADLINE

in about 8 hours
View Details
NAICS: 237130
New
SLED
Ironwood Transmission Line ProjectThe Ironwood Transmission Line Project involves the construction, operation, and maintenance of an approximately 86-mile-long 500 kV overhead transmission line connecting the APS North Gila Substation in western Yuma County, Arizona, to SDGE’s Imperial Valley Substation in Imperial County, California. The project will traverse a mix of federal, state, and private lands, including areas managed by the Bureau of Land Management, and will require the installation of transmission structures, foundations, conductors, fiber optic communication lines, and both temporary and permanent access roads. Construction activities will include vegetation clearing, grading, excavation, foundation placement, structure assembly, and conductor stringing, supported by staging areas, work zones, and existing route improvements. Heavy equipment and construction vehicles will be used throughout the multi-phase build, with traffic control measures implemented to manage impacts during active construction. Upon completion, temporary work areas will be restored to the extent feasible, while the permanent transmission infrastructure will remain operational as a critical component of the regional power grid. The project is managed under the oversight of the California Public Utilities Commission, with primary point of contact Michelle Wilson serving as Program and Project Supervisor, supported by Project Manager Allyson Little from NextEra Energy and Anne Surdzial of Ecorp Consulting as the lead for CEQA/NEPA services. The project was posted as a forecast on August 4, 2026, and key coordination for permitting and environmental compliance will be conducted through California’s CEQA network, with ongoing engagement required across multiple jurisdictions and landowners along the corridor.
California Public Utilities Commission

POSTED

about 23 hours ago

DEADLINE

N/A
View Details