Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Transportation was posted on November 13, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

99--Broad Agency Announcement (BAA) - Rotorcraft Damage Tolerance (RCDT) for Metallic Materials

Closed
6158Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541715
New
Federal
Request for Information (RFI): Verification and Compliance Checking for Natural-Language Network Requirements (FastVacc)
Solicitation # DARPA-SN-27-13
The Defense Advanced Research Projects Agency (DARPA) Information Processing Techniques Office (IPTO) has issued a Request for Information (RFI) under solicitation number DARPA-SN-27-13 titled Verification and Compliance Checking for Natural-Language Network Requirements (FastVacc). The agency is seeking information on tools, practices, and approaches to reduce the time and cost of verifiable compliance checking for network security requirements by two to three orders of magnitude. The objective is to develop a capability that can process natural-language requirements documents, such as Zero Trust Architecture or Commercial Solutions for Classified packages, and concrete network configurations to identify inconsistencies, redundancies, and incompleteness in an offline phase, while providing near real-time verification of configurations with human-understandable output. This RFI is not a formal solicitation for proposals and does not constitute a binding contract. Interested respondents must submit their information by November 13, 2026, via email to [email hidden]. Submissions should consist of a one-page narrative and up to two slides featuring visual depictions of key concepts, including a completed version of Table 1. All responses must be submitted at the unclassified level in unprotected Microsoft Word, PowerPoint, or PDF formats, adhering to specific formatting guidelines including 12-point font and one-inch margins. Any proprietary information must be clearly labeled as Proprietary, and the use of the term Confidential is strictly prohibited for proprietary business data.
Defense Advanced Research Projects Agcy

POSTED

about 12 hours ago

DEADLINE

in 15 days
NAICS: 541715
New
Federal
FTA Broad Agency Announcement (FY26) -- “Research Initiatives in Support of Safety, Accessibility, and Mobility in Public Transportation
Solicitation # 693195-26-BAA-0001
The Federal Transit Administration (FTA) Office of Research, Demonstration, and Innovation has issued Broad Agency Announcement 693195-26-BAA-0001 to solicit applied research projects aimed at enhancing the safety, reliability, efficiency, and accessibility of public transportation in the United States. This unrestricted solicitation is open to any responsible source, excluding Federal Government-owned businesses, and encourages teaming and collaboration. The program focuses on technology readiness levels 3 through 6, with a specific preference for proof-of-concept testing. Research topics include community connectivity, accessibility for automated vehicles, urban rail innovations, ferry safety, and transit safety data analytics. Individual awards are typically valued between $150,000 and $500,000 and may be structured as firm-fixed-price or level-of-effort term contracts. While cost sharing is not mandatory, projects that include transit operator partnerships and cost sharing are preferred. The selection process is a two-phased approach starting with a five-page concept paper and a one-page quad chart, followed by a formal proposal for invited offerors. Evaluation is based on technical merit, importance to agency programs, and cost, with technical factors weighted significantly higher than price. The response deadline has been extended to October 30, 2026. Awardees must comply with various Federal Acquisition Regulation clauses, including Section 889 prohibitions on certain telecommunications and video surveillance equipment. Key deliverables include periodic reports, annual research summaries for multi-year projects, and a final technical report, all of which must be submitted 30 days prior to the end of the performance period.
693195 Office Of Acquisition Mgt

POSTED

about 12 hours ago

DEADLINE

in 8 days
NAICS: 541715
New
Federal
Bolstering Underutilized Industry by Leveraging Technology Transfer (BUILTT) pilot program
Solicitation # 10292026-LR-27
The Department of Energy, in partnership with the National Nuclear Security Administration, has announced the Bolstering Underutilized Industry by Leveraging Technology Transfer (BUILTT) pilot program. This initiative, conducted by the Nevada National Security Sites, Y-12 National Security Complex, and Kansas City National Security Campus, aims to assist qualified U.S. small and medium-sized businesses in manufacturing low-volume, high-impact technologies developed by DOE/NNSA Labs, Plants, and Sites. These technologies, which include specialized optical imaging, radiation and chemical sensing systems, precision electrical components, and advanced materials, often have limited commercial markets but are critical for government mission requirements. Under the program, selected businesses may receive a Cost Reduction License (CRL) for a nominal fee, granting them the rights to produce specified technologies for sale to the DOE, NNSA, and other government customers at pre-negotiated prices. Eligibility is limited to U.S.-based SMBs, with preference given to those near participating sites or those with SBA 8(a) or HUBZone designations. Interested parties are evaluated based on their technical and manufacturing capabilities, financial capacity, and ability to meet regulatory and security requirements. Responses must be submitted to the Technology Partnerships and Intellectual Property Office by April 1, 2027, and are categorized under NAICS code 541715.
Msts – DOE Contractor

POSTED

about 12 hours ago

DEADLINE

in 5 months
NAICS: 541715
New
Federal
REQUEST FOR INFORMATION – PACIFIC GREENFIELD INITIATIVE (ADVANCED MANUFACTURING AND INDUSTRIAL RESILIENCE OPPORTUNITY ON OAHU, HI)
Solicitation # RFI-PGI-20260929
The Department of the Navy is issuing Request for Information RFI-PGI-20260929 to gather industry feedback for the Pacific Greenfield initiative. This effort aims to establish advanced manufacturing and industrial resilience capabilities on existing non-excess Navy property on Oahu, Hawaii. The primary goal is to reduce reliance on long-lead continental United States supply chains by enabling theater-scale production of critical components, including metals, composites, electronics, and large-format printing, with a target capacity of hundreds to thousands of units. The Navy is seeking information on industrial-scale facility concepts, modern manufacturing footprints, and the integration of robust utility infrastructure, such as microgrids and circular resource-recovery systems, while emphasizing the development of the local Hawaii workforce through training pipelines. This RFI is strictly for market research and planning purposes and does not constitute a solicitation or a commitment to award a contract. The Navy is exploring various acquisition and partnership models, including Enhanced Use Leases, Other Transaction Agreements, and joint ventures, to leverage private investment and reduce federal capital requirements. Interested parties, including specialized small businesses, are invited to submit high-level concepts addressing site requirements, financing approaches, and development timelines. Responses are limited to 20 pages and must be submitted by 17:00 HST on November 10, 2026. Potential respondents are cautioned regarding possible organizational conflicts of interest related to the project's advisory and real-estate requirements.
Navfacsyscom Pacific

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 541715
New
Federal
ACC-DTA Commercial Solutions Opening (CSO)
Solicitation # W912CH-26-S-0001
The Army Contracting Command – Detroit Arsenal (ACC-DTA) Commercial Solutions Opening (CSO), solicitation W912CH-26-S-0001, serves as a rapid-acquisition gateway to transition cutting-edge commercial technologies into active defense programs. This vehicle supports a diverse customer base, including the Intelligence and Security Command (INSCOM) and six Portfolio Acquisition Executives, focusing on the development, integration, and sustainment of ground vehicle systems to enhance Army modernization and readiness. The CSO utilizes a streamlined, merit-based, multi-phased evaluation process consisting of solution briefs, presentations, and commercial solution proposals. Awards may be issued through 2028 via FAR Part 12 commercial procedures or non-FAR agreements, such as transaction agreements under 10 U.S.C. 4022 and Cooperative Agreements under 31 U.S.C. 6305. The solicitation encompasses various Areas of Interest (AoI) targeting critical capabilities, including the FALCONS prototype for long-range reconnaissance, TIGER Readiness for the Abrams Main Battle Tank engine supply chain, Counter-Unmanned Aircraft Systems (C-UAS) detection, and the Light Tactical Trailer Heavy Chassis (LTT-HC). Funding ceilings for specific prototypes, such as FALCONS, range from 24 million to 30 million dollars depending on the use of government-provided kits. Key requirements include strict adherence to the Buy American Act and Specialty Metals clauses, with a prohibition on reliance on adversarial foreign nations for critical minerals. Technical evaluations focus on mission viability, affordability, and schedule realism, while administrative requirements include SAM registration, a Unique Entity ID, and compliance with NIST SP 800-171 for handling controlled unclassified information.
W6QK Acc- Dta

POSTED

about 12 hours ago

DEADLINE

in about 2 years
NAICS: 541715
New
Federal
ARTIFICIAL INTELLIGENCE AND NEXT GENERATION DISTRIBUTED COMMAND AND CONTROL
Solicitation # FA875023S7006
The Department of the Air Force, Air Force Materiel Command, AFRL Rome Research Site, is soliciting research and development for Artificial Intelligence and Next Generation Distributed Command and Control under BAA FA8750-23-S-7006. The primary objective is to transform Joint Force Command and Control capabilities by leveraging AI to enhance battlespace assessment, plan selection, and force monitoring in distributed and contested environments. A significant focus is placed on the Battle Management of AI, which seeks technologies to monitor, adapt, and deploy AI capabilities during mission execution to counter model drift and ensure operational safety. This is an open, two-step BAA effective until August 30, 2028, with total estimated funding of approximately $99 million. Individual awards typically range from $200,000 to $20 million and may be awarded as FAR-based procurement contracts, grants, cooperative agreements, or Other Transactions. Initial submissions are limited to three-page white papers, with formal proposals accepted by invitation only. Evaluation is based on a trade-off process considering overall scientific and technical merit, related experience, solution maturity and openness, and cost realism. Prospective offerors must adhere to strict guidelines, including the Gold Standard Science principles for reproducibility and transparency, and must disclose any potential Organizational Conflicts of Interest. Submissions require a CAGE code, unique entity identifier, and an approved DD Form 2345. The government may provide Government Furnished Software for specific technical areas, and all research must comply with National Industrial Security Program standards for the protection of classified information.
FA8750 Afrl Rik

POSTED

about 12 hours ago

DEADLINE

in almost 2 years

AI Contract Overview

Show more

The Federal Aviation Administration is soliciting proposals through Broad Agency Announcement TCBAA-08-0002 to conduct research on Rotorcraft Damage Tolerance for metallic materials. The primary goal is to support FAA rulemaking and the implementation of damage tolerance requirements for rotorcraft structures and dynamic components, moving beyond the traditional safe-life approach. Research areas of interest include the development of material databases, threat assessments of flaws, validation of computational algorithms, and the creation of certification compliance handbooks. Interested parties must first submit a three-page technical summary, including current and target Technology Readiness Levels, for initial review. If requested, a formal technical proposal of no more than 50 pages must be submitted. Eligible projects can span up to five years, with funding capped at 300,000 dollars per fiscal year. Proposals are evaluated based on technical merit, utility to regulations, team competency, and risk mitigation strategies, with awards issued on a rolling basis until funding for fiscal year 2008 is exhausted.

General Info

FAA seeks research proposals on rotorcraft damage tolerance for metallic materials and certification.

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

Place of Performance

NJ

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → AAQ600 692M15 Acquisition & Grants
ContactsNo contacts available
OfficeATLANTIC CITY, NJ, 08405, USA
Office AddressATLANTIC CITY, NJ, 08405, USA
ContactsNo contact information available

Full Description

Show more
Broad Agency Announcement (BAA) TCBAA-08-0002 Rotorcraft Damage Tolerance (RCDT) For Metallic Materials *****The FAA will host the Rotorcraft Damage Tolerance (RCDT) Broad Agency Announcement (BAA) meeting on November 15, 2007 starting at 9:00am. The RCDT BAA meeting is to be held at the FAA William J. Hughes Technical Center. Attendees are required to contact Felix Abali (+1 (555) 000-0000, contact@example.gov) by November 5 to register for the meeting and to obtain additional meeting detailed information.***** 1. Background The FAA is currently considering the damage tolerance requirement for rotorcraft structures and dynamic components. While the damage tolerance methodology has been extensively and successfully used in fix-wing aircraft structures, rotorcraft has just begun to use it in addition to the safe-life approach. Generally, safe-life, in flight hours, is experimentally determined using the mission profile, flight loads, and S-N data. Using Miner's cumulative fatigue damage rule, a fatigue damage rate for each flight condition is typically calculated by assessing the damaging load cycles per hour from the flight spectrum and loads data, the ratio of the alternating load to the endurance limit, and the cycles-to-failure from a standard component S-N curve. A reciprocal summation of each fatigue damage rate for each flight condition then determines the retirement life of the part being analyzed. In contrast to safe-life, the damage tolerance (DT) approach assumes that an inherent flaw or crack exists in the manufactured part. The life of the part is determined using fracture mechanics methodologies, load spectrum, manufacturing process and operating environment. Based on the computed crack growth life of the inherent flaw or crack, suitable inspection intervals are established so that cracks can be found and repaired long before they achieve a critical length. The effectiveness of the damage tolerance approach depends on several factors that include fatigue crack growth data, initial crack sizes, fracture mechanics and computational methods, effects of shot-peening and cold working, and inspection techniques. The success of implementing the damage tolerance approach to fixed-wing aircraft structures, coupled with the FAA's goal to enhance aircraft safety has lead to RCDT research and development (R&D) efforts for rotorcraft. In 2005, the FAA assessed the current state of RCDT and fracture mechanics technologies. During the assessment, the FAA asked the rotorcraft community for their inputs on fracture mechanics and RCDT-related technologies. The FAA then conducted the gap analysis to identify research needs for supporting FAA rulemaking. Identified RCDT research tasks were then prioritized using the FAA prioritization process and criteria. Finally, a roadmap for RCDT was developed to guide the research to support FAA rulemaking and the implementation of RCDT requirement. 2. Purpose The objective of this BAA is to solicit proposals to conduct the RCDT research to support FAA rulemaking. Particularly, this effort shall support FAR 29.571, 27.571, AC 29-2A, AC 27-1A, AC-29-2C, FAA Order 8110.9 which can be downloaded using the following link: http://www.airweb.faa.gov/Regulatory_and_Guidance_Library/rgAdvisoryCircular.nsf/MainFrame?OpenFrameSet 3. Submission Deadlines Technical proposals shall be prepared according to guidelines described in sections 4 (Submission Requirements), 5 (Three-Page Technical Summary Requirements), and 6 (Formal Proposal Requirements). Technical proposals will be accepted until fiscal year 2008 (FY-08) funding for this effort is fully committed. Offerors are therefore encouraged to submit the technical summary proposal as soon as possible before FY-08 funding is fully committed or exhausted. Upon request from the FAA, formal technical proposals addressing the research requirements described in section 6 (Formal Proposal Requirements) shall be submitted not more than thirty (30) business days after the date of the request sent by email. FAA's request will be made via email. 4. Submission Requirements Offerors will submit a three-page technical summary in original and three additional hardcopies of the technical summary prior to submitting a formal proposal. A cover page can be used, but the total number of pages cannot exceed three. The three-page technical summary shall meet the requirements described below. Mail the three-page technical summary and three hardcopies to: Air Traffic Organization Federal Aviation Administration William J. Hughes Technical Center Airport and Aircraft Safety R&D Division Airworthiness Assurance R&D Branch Code AJP-6360, Building 210 (Attn: Felix Abali) Atlantic City Int'l Airport, NJ 08405 In addition (not as a substitute for the paper copy), an electronic version of the technical summary proposal will need to be emailed to Dy Le, contact@example.gov. The electronic version shall be provided in Microsoft Word. Submitted electronic proposals shall not have any security protection requiring the FAA to obtain a password or an authorization from the offeror prior to opening the proposal or file. The FAA will not review submitted proposals having security or password protection. Sixty (60) business days or earlier, after receipt of the three-page technical summaries, the FAA will respond to offerors in one of three ways: a. Request for the submission of a formal technical proposal. b. Recommendation to submit a formal technical proposal if certain changes are made or conditions met. c. Rejection of the summary proposal. If requested, the offeror shall submit to the FAA address (Felix Abali) noted above (1) a formal technical proposal with the signature of an authorizing official in original, (2) three additional hardcopies of the formal technical proposal, and (3) a CD containing the formal technical proposal in Microsoft Word. Proposals shall have the signature of an authorizing official. Formal technical proposals shall contain a detailed discussion of the items presented in the selected three-page technical summary. Additionally, formal technical proposals shall address all or some of the research requirements described in section 6 (Formal Proposal Requirements) of this announcement. Formal technical proposals, three additional hardcopies, and a CD containing the proposal in Microsoft Word will be mailed to the FAA (Felix Abali) at the same address as used for the three-page technical summary. In addition (not as a substitute for the paper copy), an electronic version of the formal technical proposal in Microsoft Word or Adobe PDF format will be emailed to Dy Le, contact@example.gov. Submitted electronic proposals shall not have any security protection requiring the FAA to obtain a password or an authorization from the offeror prior to opening the proposal or file. The FAA will not review submitted proposals having security or password protection. The FAA shall receive both versions of the formal technical proposals according to the submission deadlines required in section 3 (Submission Deadlines). Formal proposals shall not exceed 50 pages. Formal technical proposals will be evaluated with an approximate FAA response time of ninety (60) business days or less. 5. Three-Page Technical Summary Requirements There is no specific format for the three-page technical summary. At a minimum the summary shall contain the following items: a. Affiliation, contact or principal investigator name, phone number, and mailing and email addresses. b. The specific purpose/objective of the proposed research applicable to FAA rulemaking on RCDT. c. Description of the research approach. d. Description of research outputs and how they will be incorporated in RCDT regulations. e. Description of the metrics used to measure research progress and performance. f. Description of the current technology level (TRL) of the subject technology being proposed for validation and demonstration and the achieved TRL at the conclusion of the proposed research. Standard TRL, GAO/NSIAD-99-162 Best Practices Appendix I - Technology Readiness Level Descriptions, developed by the General Accounting Office should be used and can be downloaded using the following link: http://www.tswg.gov/tswg/techtrans/TRLDefinitions.pdf. The proposals that do not include the current and proposed TRL's will be considered non-applicable to the above AC and therefore outside the scope of this research program. g. Description of research exit criteria (e.g., criteria used to determine if the defined objectives of research have been met). h. Estimated time (e.g., years) for the proposed research. The research period shall not exceed five (5) years. i. Estimated funds required for the proposed effort, including in-house and sub-contracted funds. The estimated cost shall not exceed $300,000 per fiscal year. j. Description of research collaborations, if applicable. Collaborations with other research entity (e.g., Government agencies, rotorcraft industry, and academia) are not required but will also be considered positively during technical summary and proposal evaluation. 6. Formal Proposal Requirements When requested by the FAA, formal technical proposals shall address all or some of the following approaches: a. Development of rotorcraft material electronic database, handbook, and reference for use in RCDT analysis and certification. b. Systematic evaluation of rotorcraft damage and flaw types and sizes (threat assessment) based on the processes and practices used in design, manufacturing, maintenance and overhaul, and service experience. c. Test, validation, demonstration, and technology transfer of existing fracture mechanics and computational algorithms and codes for rotorcraft design and certification. User support and maintenance plans for validated codes are required. d. Expertise and resource to support FAA in-house DT computation methodologies and codes validation. Plan to allocate resources at the FAA William J. Hughes Technical Center is required. e. Demonstration of DT on full-scaled rotorcraft components. f. Development of rotorcraft DT design and management procedures and certification compliance handbook and/or reference g. RCDT and related expertise including risk analysis and probabilistics to support and provide consultations on the RCDT demonstration, implementation, and certification. Proposed support shall address travel plan to support the FAA projects. h. Risks related to technology development, demonstration and validation, transfer, and/or implementation shall be identified. The proposal shall include mitigating strategies for each risk area. The proposals that do not include risks and mitigation strategies will be considered non-applicable and therefore outside the scope of this research program. i. Implementation and technology transfer plan to describe how validated technologies will be used in applicable regulations. The proposals that do not include the implementation and technology transfer plan will be considered non-applicable and therefore outside the scope of this research program. j. Offerors shall provide a detailed cost proposal. All resources including manpower, equipment, travel, and material shall also be identified and categorized. k. Offerors shall propose a detailed work plan including milestones and schedules for the proposed period of performance. l. Description of the current technology level (TRL) of the subject technology being proposed for validation and demonstration and the achieved TRL at the conclusion of the proposed research is required. Standard TRL, GAO/NSIAD-99-162 Best Practices Appendix I - Technology Readiness Level Descriptions, developed by the General Accounting Office should be used and can be downloaded using the following link: http://www.tswg.gov/tswg/techtrans/TRLDefinitions.pdf. The proposals that do not include the current and proposed TRL's will be considered non-applicable to the above AC and therefore outside the scope of this research program. 7. Method of Evaluation Proposals will be evaluated in the seven technical areas listed in order of decreasing importance: a. Technical merit b. Utility to RCDT regulations c. Investigative team competency and RCDT experience d. Logical and effective validation, demonstration, and certification implementation strategies e. Technical and implementation risks and the mitigation plan for each f. Effective plan for project completion g. Availability and quality of equipment and facilities Cost and cost realism will be evaluated as acceptable or unacceptable only. Acceptable proposals will have costs commensurate with the work load proposed and will not be in excess of $300,000 in any fiscal year. 8. Period of Performance: Efforts lasting five years or less will be considered. Multiyear efforts will be funded in yearly increments, providing measurable and adequate performance is shown prior to each new funding increment. 9. Award: Awards will be made on rolling basis and according to the submission deadlines required in section 3 (Submission Requirements).

More opportunities from Department Of Transportation → AAQ600 692M15 Acquisition & Grants

Same awarding agency

NAICS: 561612
New
Federal
WJHTC Armed Security Guard Services
Solicitation # 692M15-25-R-00012
The Federal Aviation Administration is soliciting proposals for armed security guard services at the William J. Hughes Technical Center for Advanced Aerospace in Atlantic City, New Jersey. This effort is a total Socially and Economically Disadvantaged Business 8(a) set-aside and will be awarded as a firm-fixed-price contract. The period of performance consists of a two-month transition period starting approximately February 1, 2027, followed by a 12-month base period and four 12-month option periods. The scope of work involves protecting approximately 5,059 acres, including the Transportation Security Laboratory, with duties encompassing access control, crime deterrence, emergency response, and command-and-control operations. The acquisition is governed by the Acquisition Management System rather than the FAR and utilizes a best value tradeoff procedure for award. Evaluation factors include staffing approach, management approach, corporate experience, past performance, and cost, with non-price factors carrying more weight than price. Strict personnel requirements are in place, including mandatory drug testing, firearms qualifications, and specific educational degrees for program managers and supervisors. Additionally, the contractor must comply with Service Contract Labor Standards and mandatory minimum economic baselines dictated by Collective Bargaining Agreements. Proposals are due by 4:00 PM Eastern Time on November 4, 2026.
Security Guards and Patrol Services

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 5417
Federal
Aviation Research BAA 2025
Solicitation # 692M15-25-R-00004
The Aviation Research BAA 2025, solicitation number 692M15-25-R-00004, is a long-term initiative sponsored by the Federal Aviation Administration (FAA) to support basic and applied research at the William J. Hughes Technical Center for Advanced Aerospace. Valid from December 5, 2024, through December 4, 2034, this Broad Agency Announcement seeks to advance the state-of-the-art in aerospace safety and efficiency across five primary program branches: Airport Technology R&D, Software and Systems, Structures and Propulsion, Separation Standards Analysis, and Fire Safety. The FAA encourages submissions from a diverse range of offerors, including academia, industry, and small businesses, to address evolving air transportation challenges. The solicitation utilizes a phased submission process where interested parties first submit brief white papers for specific Topics of Interest. If a white paper is deemed meritorious, the FAA may request a formal proposal consisting of a technical volume and a price/cost volume. Awards are made bilaterally based on a favorable feasibility assessment, with cost analyzed for reasonableness and realism rather than being a rated factor. While funding varies by project, rough order of magnitude estimates range from $100,000 to $1.2 million per award, with many projects anticipated to be funded annually for a period of 12 to 36 months. All offerors must maintain active registration in the System for Award Management (SAM) to be eligible for award.
Scientific Research and Development Services

POSTED

10 days ago

DEADLINE

in about 3 years
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS