This Solicitation opportunity from Florida was posted on October 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Airsides 1 & 3 Pond Dredging (BP-00516)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Greater Orlando Aviation Authority (GOAA) is soliciting bids for the rehabilitation of stormwater management ponds at Airsides 1 and 3 of the Orlando International Airport under solicitation 26-995-IFB (BP-00516). The project's primary objective is to restore the designed and permitted capacity of these ponds to ensure regulatory compliance and maintain the airfield drainage system. The scope of work includes the removal of accumulated sediment and the restoration of pond embankments. While initial documents mentioned various methods, Addendum 6 clarifies that hydraulic dredging is the intended basis of the bid, removing requirements for dry excavation. The contract will be awarded to the lowest qualified responsive bidder based on the total bid price, with the owner reserving the right to consider past performance and general qualifications. The project timeline includes a total of 420 calendar days, which incorporates a 60-day submittal period during which no site work is permitted. Substantial completion is required within 210 calendar days from the Notice to Proceed, with final completion due within 60 days thereafter. Contractors must demonstrate experience with at least two similar projects within the last five years and comply with strict airfield safety standards, including FAA AC 150/5370-2 and 14 CFR Part 77. Due to the sensitive nature of the location, awarded contractors must execute a Non-Disclosure Agreement and adhere to Sensitive Security Information (SSI) requirements. Administrative requirements include the submission of a bid bond, performance and payment bonds for 100% of the contract sum, and proof of bondability. Bidders must also comply with Local Developing Business (LDB) and Veteran Business Enterprise (VBE) participation requirements through certified subcontractors. All responses must be submitted electronically via the OpenGov platform by the final deadline of October 30, 2026. Payment is processed through an Application and Certificate for Payment submitted by the 5th of each month, with a 15-business-day review period by the Owner's Authorized Representative.
General Info
Place of Performance
FL, USASet-Aside
Documents
22AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Request for Quote for The Recharge Master Plan Update at Montclair BasinOpen now, due in 7 days
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 16 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (70)
See All 70 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Addendum #1: Timeline modification for 26-995-IFB-Airsides 1 & 3 Pond Dredging (BP-00516) Attachments: Addendum_1.pdf
Official Notice #1: Pre-submittal Meeting and Site Visit for 26-995-IFB-Airsides 1 & 3 Pond Dredging (BP-00516): Greetings, This is to inform you that the pre-submittal meeting for 26-995-IFB-Airsides 1 & 3 Pond Dredging (BP-00516) will take place on September 24, 2026 at 9:00am EST. Please join the meeting via the following Teams link: https://teams.microsoft.com/meet/254962435441815?p=9mOLjN3KWULM7xDuYm Meeting ID: 254 962 435 441 815 Passcode: GA3fT9EK Dial in by phone Sign up to see this detail,,782496434# United States, Chicago Find a local number Phone conference ID: 782 496 434# OR in person at: Greater Orlando Aviation Authority Orlando International Airport Carl T. Langford Board Room One Jeff Fuqua Blvd Orlando, Florida 32827-4392 **** A site visit will take place immediately after the Pre-submittal meeting****
Addendum #2: Timeline modification for 26-995-IFB-Airsides 1 & 3 Pond Dredging (BP-00516) Attachments: Addendum_2.pdf
Official Notice #2: Pre-Submittal Presentation and Attendance Reports for 26-995-IFB- Airsides 1 & 3 Pond Dredging (BP-00516): Attachments: 26-995-IFB_-_Pre-Submittal_Presentation_Final_9.24.26.pdf, 26-995-IFB-Site_Visit.pdf, 26-995-IFB-Sign-in_sheet.pdf
Addendum #3: Additional details for the Pre-Submittal and Site Visit on 26-995-IFB-Airsides 1 & 3 Pond Dredging (BP-00516) Attachments: Addendum_3.pdf
Addendum #4: Modification to add section to 26-995-IFB-Airsides 1 & 3 Pond Dredging (BP-00516) Attachments: Addendum_4.pdf
Addendum #5: Modification to the solicitation for 26-995-IFB-Airsides 1 & 3 Pond Dredging (PB-00516) Attachments: Addendum_5.pdf
Addendum #6: Q&A Responses, Revised Documents, Modified timeline, and Section update for 26-995-IFB-Airsides 1 & 3 Pond Dredging (BP-00516) Attachments: Addendum_6.pdf
More opportunities from Florida → Procurement Services
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
