Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Aquaterra Water Bank

Forecast
2024090124State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Aquaterra Water Bank Project is a large-scale regional water supply and managed groundwater banking facility located on approximately 4,600 acres in Fresno County, California, within the jurisdiction of the McMullin Area Groundwater Sustainability Agency (MAGSA). The project is designed to optimize water storage and recovery to support sustainable groundwater management under the Sustainable Groundwater Management Act. Key infrastructure includes 63.5 miles of conveyance canals, 19 pump stations, over 88 to 90 recovery wells, and approximately 3,480 to 3,500 acres of recharge basins protected by new levees. The facility is engineered to have a total storage capacity of 800,000 acre-feet, with the ability to recharge up to 208,000 acre-feet annually between October and February and recover up to 148,000 acre-feet annually between May and September. At least 10 percent of the banked water will remain in the aquifer to ensure replenishment. The project involves complex environmental and operational considerations, as detailed in the Draft Environmental Impact Report and various technical memoranda. Operational plans emphasize protecting native groundwater quality, ensuring that nearby wells do not go dry or lose more than 50 percent of their pumping efficiency, and coordinating with existing surface water rights holders. Environmental mitigation requirements for construction include strict adherence to air quality standards, such as using CARB and USEPA Tier 4 Interim or better diesel engines, utilizing aqueous diesel fuel, and implementing idling restrictions. Additionally, the project mandates specialized personnel, including a Qualified Project Archaeologist, and requires a Worker Environmental Awareness Program to protect sensitive biological resources and maintain the confidentiality of archaeological sites.

General Info

Aquaterra Water Bank project manages groundwater storage and recovery in Fresno County, California.

Agency

California → McMullin Area Groundwater Sustainability Agency

Place of Performance

Manning Ave. and S. Henderson Rd, CA, 93652

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → McMullin Area Groundwater Sustainability Agency
Contacts3 people available
OfficeN/A
Organization / Agency
California → McMullin Area Groundwater Sustainability Agency
Office AddressN/A
Contacts
David MunroSenior Environmental Scientist
Matt HurleyGeneral Manager

Interested Companies (2)

3005 SE Gladstone StPORTLAND, OR
Tetra TechSuperior, Colorado

Full Description

Show more
The Proposed Project would include construction and operation of a water bank on approximately 4,600 acres located within an agricultural region of the mid-northern portion of Fresno County, California. As part of the Proposed Project, MAGSA would create approximately 63.5 miles of conveyance canals, install 19 pump stations, 88 recovery wells, and 3,480 acres of recharge basins. Water from San Luis Reservoir or O’Neill Forebay would be delivered by bank subscribers from the Mendota Pool, distributed into recharge basins, and stored at the project site as groundwater until it was recovered by Bank depositors when needed and conveyed to the Mendota Pool. Once completed, the Bank would have the capacity to store up to 800,000 acre-feet (AF) of water, with annual recharge of up to 208,000 AF. Up to 148,000 AF could be recovered in any given year. At least 10 percent of the banked water would be left behind to replenish the aquifer.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details
NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The Carroll Creek Stream Restoration project (CIP# 350007), issued by the City of Frederick, Maryland under solicitation IFB-27-11, is a comprehensive construction effort located near Old Gas House Pike. The scope of work includes in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements involve the use of a Stream Restoration Plan, supplemental specifications, and the installation of reinforced soil lifts, riparian seed mixes, and various culverts. The project has an estimated value of approximately 6.88 million dollars and is expected to be completed within 180 days of the Notice to Proceed. Bidders must comply with strict submission requirements via the OpenGov Portal, including a detailed electronic project schedule and a list of three equivalent projects completed within the last four years. The contract emphasizes socioeconomic goals with participation targets of 31 percent for MBE, 11 percent for WBE, and 2 percent for SDVOSB. Financial security is mandated through a 5 percent bid bond, followed by 100 percent performance and materialmen bonds upon award, and a two-year maintenance bond upon final acceptance. Contract administration includes a two-year guarantee on all work and materials, with liquidated damages set at 500 dollars per calendar day for delays beyond the substantial completion date. The City of Frederick reserves the right to withhold payment if the required progress schedule is not submitted. Evaluation for award is based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capability, integrity, and performance record.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS