Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Aquaterra Water Bank

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Aquaterra Water Bank Project is a large-scale regional water supply and managed groundwater banking facility located on approximately 4,600 acres in Fresno County, California, within the jurisdiction of the McMullin Area Groundwater Sustainability Agency (MAGSA). The project is designed to optimize water storage and recovery to support sustainable groundwater management under the Sustainable Groundwater Management Act. Key infrastructure includes 63.5 miles of conveyance canals, 19 pump stations, over 88 to 90 recovery wells, and approximately 3,480 to 3,500 acres of recharge basins protected by new levees. The facility is engineered to have a total storage capacity of 800,000 acre-feet, with the ability to recharge up to 208,000 acre-feet annually between October and February and recover up to 148,000 acre-feet annually between May and September. At least 10 percent of the banked water will remain in the aquifer to ensure replenishment. The project involves complex environmental and operational considerations, as detailed in the Draft Environmental Impact Report and various technical memoranda. Operational plans emphasize protecting native groundwater quality, ensuring that nearby wells do not go dry or lose more than 50 percent of their pumping efficiency, and coordinating with existing surface water rights holders. Environmental mitigation requirements for construction include strict adherence to air quality standards, such as using CARB and USEPA Tier 4 Interim or better diesel engines, utilizing aqueous diesel fuel, and implementing idling restrictions. Additionally, the project mandates specialized personnel, including a Qualified Project Archaeologist, and requires a Worker Environmental Awareness Program to protect sensitive biological resources and maintain the confidentiality of archaeological sites.

General Info

Aquaterra Water Bank project manages groundwater storage and recovery in Fresno County, California.

Agency

California → McMullin Area Groundwater Sustainability Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Manning Ave. and S. Henderson Rd, CA, 93652

Set-Aside

NONE

Documents

(14)

CDFW Comments on Aquaterra Water Bank DEIR 2024090124

PDFcomment

DRAFT_Aquaterra_IS_MND

PDF

Appendix F: Water Quality Technical Memo for Aquaterra Water Bank

PDFsow

Appendix H Noise Calculations

PDFsow

Appendix_D_Bio Resources

PDF

Aquaterra Water Bank Project Notice of Preparation

PDFnotice-of-preparation

Appendix E Tribal Notification Letters for Aquaterra Groundwater Bank Project

PDFtribal-notification-letter

Aquaterra Water Bank Draft Environmental Impact Report Notice of Availability

PDFspecial-notice

Draft Environmental Impact Report Comments for Aquaterra Water Bank Project

PDFcomment

Appendix G: Hydrogeological Technical Memo for Aquaterra Water Bank Operations

PDFtechnical-memo

Aquaterra Water Bank Draft Environmental Impact Report SCH No. 2024090124

PDFdeir

Appendix C Air Quality Calculations and MAGSA2 v2 Detailed Report

PDFsow

Aquaterra Water Bank Notice of Completion

PDFnotice-of-completion

Appendix B: Draft Operations Plan for Aquaterra Water Bank

PDFoperations-plan

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → McMullin Area Groundwater Sustainability Agency
Contacts3 people available
OfficeN/A
Organization / Agency
California → McMullin Area Groundwater Sustainability Agency
Office AddressN/A
Contacts
David MunroSenior Environmental Scientist
Matt HurleyGeneral Manager

Interested Companies (2)

Show more
3005 SE Gladstone St
PORTLAND, OR
Tetra Tech
Pasadena, California

Full Description

Show more
The Proposed Project would include construction and operation of a water bank on approximately 4,600 acres located within an agricultural region of the mid-northern portion of Fresno County, California. As part of the Proposed Project, MAGSA would create approximately 63.5 miles of conveyance canals, install 19 pump stations, 88 recovery wells, and 3,480 acres of recharge basins. Water from San Luis Reservoir or O’Neill Forebay would be delivered by bank subscribers from the Mendota Pool, distributed into recharge basins, and stored at the project site as groundwater until it was recovered by Bank depositors when needed and conveyed to the Mendota Pool. Once completed, the Bank would have the capacity to store up to 800,000 acre-feet (AF) of water, with annual recharge of up to 208,000 AF. Up to 148,000 AF could be recovered in any given year. At least 10 percent of the banked water would be left behind to replenish the aquifer.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS