Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Aquaterra Water Bank

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Aquaterra Water Bank project is a large-scale groundwater storage and management initiative located on approximately 4,600 acres in Fresno County, California, under the oversight of the McMullin Area Groundwater Sustainability Agency. The project involves constructing conveyance infrastructure including 63.5 miles of canals, 19 pump stations, 88 recovery wells, and 3,480 acres of recharge basins to store water diverted from San Luis Reservoir or O'Neill Forebay via the Mendota Pool. Water is injected into the aquifer during a five-month recharge period with an annual capacity of up to 208,000 acre-feet and can be extracted during a five-month recovery period with a maximum annual withdrawal of 148,000 acre-feet. The facility is designed to hold up to 800,000 acre-feet in total storage, with at least 10 percent of banked water permanently retained to sustain aquifer levels. Operations are subject to strict environmental compliance under CEQA, requiring adherence to water quality standards for parameters such as TDS, selenium, boron, arsenic, and molybdenum during recovery and delivery to Exchange Contractors at canal intakes downstream of the Mendota Pool. All equipment used in construction and operation must meet Tier 4 Interim or better emissions standards, and a Stormwater Pollution Prevention Plan must be implemented and maintained. The project site is situated near Raisin City with defined geographic coordinates and is subject to monitoring and inspection by regulatory bodies including the California Department of Fish and Wildlife, U.S. Fish and Wildlife Service, and regional water boards. The project relies on environmental assessments to ensure compliance with state and federal regulations, with impacts evaluated across air quality, biological resources, hydrology, and cultural resources using qualitative ratings and quantitative risk models. Although no formal procurement contract terms, pricing, payment instructions, or evaluation factors are documented in the provided materials, performance is tied to adherence to approved mitigation measures, water quality thresholds, and operational protocols established in the Mendota Pool Group’s 20-Year Exchange Program. Inspection occurs at delivery points downstream of Mendota Pool, with responsibility shared between MAGSA for overall compliance and Exchange Contractors for verifying received water quality. There is no identified contract value, delivery schedule with specific dates, or federal acquisition clauses such as those found in FAR, nor are there any stated requirements for UEI/CAGE codes, socioeconomic certifications, or invoicing systems like WAW

General Info

Aquaterra Water Bank stores and manages up to 800,000 acre-feet of groundwater in Fresno County with strict environmental and water quality compliance.

Agency

California → McMullin Area Groundwater Sustainability Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Manning Ave. and S. Henderson Rd, CA, 93652

Set-Aside

NONE

Documents

(14)

CDFW Comments on Aquaterra Water Bank DEIR 2024090124

PDFcomment

DRAFT_Aquaterra_IS_MND

PDF

Appendix F: Water Quality Technical Memo for Aquaterra Water Bank

PDFsow

Appendix H Noise Calculations

PDFsow

Appendix_D_Bio Resources

PDF

Aquaterra Water Bank Project Notice of Preparation

PDFnotice-of-preparation

Appendix E Tribal Notification Letters for Aquaterra Groundwater Bank Project

PDFtribal-notification-letter

Aquaterra Water Bank Draft Environmental Impact Report Notice of Availability

PDFspecial-notice

Draft Environmental Impact Report Comments for Aquaterra Water Bank Project

PDFcomment

Appendix G: Hydrogeological Technical Memo for Aquaterra Water Bank Operations

PDFtechnical-memo

Aquaterra Water Bank Draft Environmental Impact Report SCH No. 2024090124

PDFdeir

Appendix C Air Quality Calculations and MAGSA2 v2 Detailed Report

PDFsow

Aquaterra Water Bank Notice of Completion

PDFnotice-of-completion

Appendix B: Draft Operations Plan for Aquaterra Water Bank

PDFoperations-plan

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → McMullin Area Groundwater Sustainability Agency
Contacts3 people available
OfficeN/A
Organization / Agency
California → McMullin Area Groundwater Sustainability Agency
Office AddressN/A
Contacts
David MunroSenior Environmental Scientist
Matt HurleyGeneral Manager

Interested Companies (2)

Show more
3005 SE Gladstone St
PORTLAND, OR
Tetra Tech
Pasadena, CA

Full Description

Show more
The Proposed Project would include construction and operation of a water bank on approximately 4,600 acres located within an agricultural region of the mid-northern portion of Fresno County, California. As part of the Proposed Project, MAGSA would create approximately 63.5 miles of conveyance canals, install 19 pump stations, 88 recovery wells, and 3,480 acres of recharge basins. Water from San Luis Reservoir or O’Neill Forebay would be delivered by bank subscribers from the Mendota Pool, distributed into recharge basins, and stored at the project site as groundwater until it was recovered by Bank depositors when needed and conveyed to the Mendota Pool. Once completed, the Bank would have the capacity to store up to 800,000 acre-feet (AF) of water, with annual recharge of up to 208,000 AF. Up to 148,000 AF could be recovered in any given year. At least 10 percent of the banked water would be left behind to replenish the aquifer.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details