Arrowhead Regional Medical Center Lot 1 Parking Structure

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of San Bernardino is soliciting the construction of the Arrowhead Regional Medical Center Lot 1 Parking Structure located at 400 North Pepper Avenue in Colton, California. The project consists of a post-tensioned, cast-in-place structure spanning up to 500,000 square feet across six levels, providing up to 1,600 parking spaces. Key design elements include a finished exterior with an architectural mesh facade on the first floor, two banks of two elevators, and the installation of photovoltaic panels on the top level. The facility will be restricted to employees via badge access and will feature security enhancements such as LED lighting, emergency call boxes, security cameras, and locked gates. The project must comply with the California Building Code, the Americans with Disabilities Act, the 2022 California Building Energy Efficiency Standards (Title 24), and the California Green Building Standards Code (CALGreen) for electric vehicle charging stations. Environmental mitigation includes a landscape plan to offset the removal of approximately 51 trees. To maintain parking capacity during construction, a temporary surface parking lot will be operated at 1351 West Valley Boulevard with shuttle services provided to the campus. The project has undergone CEQA review, resulting in a Mitigated Negative Declaration confirming that the project will not have significant environmental impacts provided mitigation measures are implemented.

General Info

San Bernardino County constructing a 1,600-space, six-level parking structure at Arrowhead Regional Medical Center.

Agency

California → San Bernardino County

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Plum Place and N. Pepper Avenue, Colton, CA, 92324

Set-Aside

NONE

Documents

(7)

Arrowhead Medical Center Parking Structure Notice of Completion

PDFnotice-of-completion

Arrowhead Regional Medical Center Lot 1 Parking Structure Project Initial Study/Mitigated Negative Declaration

PDFmitigated-negative-declaration

Addendum to Initial Study/Mitigated Negative Declaration for ARMC Lot 1 Parking Structure

PDFamendment

Notice of Determination for Arrowhead Regional Medical Center Parking Structure

PDFnotice-of-determination

Arrowhead Regional Medical Center Parking Structure NOI

PDFnotice-of-intent

The Sun_Notice Tear Sheet_Arrowhead Medical Center Parking Structure

PDF

Arrowhead Regional Medical Center Lot 1 Parking Structure Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts3 people available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
Contacts
Javier RuizSenior Project Manager
Gary MaynardSenior Planner
Javier RuizSenior Project Manager

Interested Companies (2)

Show more
David Evans and Associates
Woodinville, WA

Full Description

Show more
The purpose of the project is to provide additional employee parking. The proposed parking garage will be up to 500,000 square feet and include a maximum of six levels with up to 1,600 parking spaces. The outer dimensions of the structure are anticipated to be 370 feet long by 260 feet wide; however, this may vary depending on final design. The parking garage design will utilize a post-tensioned, cast-in-place structure with the first level at grade. Levels 2 through 6 will be open-sided and have up to two banks of two elevators each. On the first floor, the structure will have a finished exterior with an architectural mesh facade on at least two sides for security. Photovoltaic (PV) panels will be installed on the top floor (i.e., Level 6) of the structure in accordance with the 2022 Califomia Building Energy Efficiency Standards (Title 24). The project will also comply with the California Building Code (CBC) and the Americans with Disabilities Act (ADA) and supply ADA spaces in accordance with those requirements. Electric vehicle charging stations will also be installed in accordance with the California Green Building Standards Code (CALGreen). Security features including lighting, emergency call boxes, security cameras, and locked gates will be installed in the parking garage. Light-emitting diode (LED) lighting will be installed and be shielded to prevent light and glare. The parking structure will also have trash receptacles. Access to the parking garage will be from Plum Street with one or two exits / entrances. The parking garage will continue to be accessible only to employees with a badge required for entry at all hours on all days. The proposed parking structure will be constructed completely within the footprint of the existing paved parking lot; therefore, there will be no increase in impervious surface. Power, water, and sewer service to the parking structure will require new tie-ins to the City of Colton’s existing systems within the existing right-of-way (ROW) on Pepper Avenue. No other off-site improvements will be required. Approximately 51 trees will be removed from landscaped areas of the existing surface lot, including broadleaved Paperbark, Monterey pine, red ironbark, and golden rain tree. No trees will be removed from public ROW. A landscape plan will be prepared and implemented to offset impacts from tree removal. Construction staging will be on a portion of the surface parking lot north of Plum Place between 1-10 and Green Circle. Alternate offsite parking with shuttle service to the ARMC campus will be provided to employees while parking spots are temporarily unavailable during construction.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Leavenworth VA Decommissioning
Solicitation # 36C77026R0015
The Department of Veterans Affairs, NCO-15 CMOP division, is soliciting a construction contract for the decommissioning of the Leavenworth VA CMOP facility located at 5000 S 13th St, Leavenworth, KS. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $500,000 and $1,000,000. The scope of work involves the disassembly, demolition, and disposal of Automated Prescription Fulfillment System (APFS) equipment, conveyors, and electrical systems, as well as general building repairs and the decommissioning of a central vacuum system. A key requirement includes providing 5,000 to 10,000 square feet of off-site storage near the Shawnee CMOP to facilitate federal equipment excessing procedures. The contract utilizes a Best Value Tradeoff source selection process, where non-price factors—including technical approach, construction experience, and staff qualifications—are significantly more important than price. The total performance period is 365 calendar days, though the government intends for the actual decommissioning to be completed within 60 days of the Notice to Proceed. Contractors must adhere to strict GSA guidelines for inventory and photography, as well as manufacturer standards for the packaging and palletization of electronic and robotic components to prevent damage. The response deadline is September 23, 2026, at 17:00 Central.
National Cmop Office (36C770)

POSTED

4 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS