Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Arrowhead Regional Medical Center Lot 1 Parking Structure

Forecast
2026010330State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of San Bernardino is soliciting the construction of the Arrowhead Regional Medical Center Lot 1 Parking Structure located at 400 North Pepper Avenue in Colton, California. The project consists of a post-tensioned, cast-in-place structure spanning up to 500,000 square feet across six levels, providing up to 1,600 parking spaces. Key design elements include a finished exterior with an architectural mesh facade on the first floor, two banks of two elevators, and the installation of photovoltaic panels on the top level. The facility will be restricted to employees via badge access and will feature security enhancements such as LED lighting, emergency call boxes, security cameras, and locked gates. The project must comply with the California Building Code, the Americans with Disabilities Act, the 2022 California Building Energy Efficiency Standards (Title 24), and the California Green Building Standards Code (CALGreen) for electric vehicle charging stations. Environmental mitigation includes a landscape plan to offset the removal of approximately 51 trees. To maintain parking capacity during construction, a temporary surface parking lot will be operated at 1351 West Valley Boulevard with shuttle services provided to the campus. The project has undergone CEQA review, resulting in a Mitigated Negative Declaration confirming that the project will not have significant environmental impacts provided mitigation measures are implemented.

General Info

San Bernardino County constructing a 1,600-space, six-level parking structure at Arrowhead Regional Medical Center.

Place of Performance

N. Pepper Ave. and Violet St. or Plum Pl., Colton, CA, 92324

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Navid SadeghiProject and Facilities Management - Project Manager

Interested Companies (2)

David Evans and AssociatesSouth Jordan, Utah

Full Description

Show more
ARMC is requesting an FRP for equipment procurement, contingency planning, and logistical coordination. This includes hiring licensed design professionals to prepare construction documents for HCAI and AHJ approval. The goal is to implement all required systems, modifications, and features to meet safety, regulatory, and facility standards.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence and industry capability assessments for the construction of an F-15EX 8-Bay Maintenance Hangar Complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project, estimated between 150 million and 200 million dollars, involves the creation of an environmentally safe and energy-efficient complex to support 21 Primary Aircraft Authorization F-15 EX aircraft. The scope includes the demolition of buildings 3, 5, 117, and 120, the construction of new parking, and necessary utility and infrastructure upgrades. The facility will be developed in three phases: Hangar 1 for corrosion control and fuel cell maintenance, Hangar 2 as a 4-bay maintenance hangar, and Hangar 6 for munitions and training. The government is considering a fixed-price Other Transaction Agreement under 10 U.S.C. section 2808a, with funding potentially phased at approximately one-third of the total cost per fiscal year. Design completion is anticipated for early 2027. All construction must adhere to DoD, Air Force, and base design standards, including strict antiterrorism, force protection, and flood plain requirements. Interested firms must provide information regarding their bonding capacity, experience with mission-critical operational facilities, and potential labor constraints. An Industry Day is scheduled for December 8, 2026, at the Selfridge Air National Guard Base Dining Facility, with registration required for up to three participants per company.
W7NF Uspfo Activity Miang 127

POSTED

6 days ago

DEADLINE

in 21 days
View Details

More opportunities from California → San Bernardino County

Same awarding agency

NAICS: 237210
New
SLED
TTM 20443 Lovemore Ranch
Solicitation # PROJ-2021-00169
Merrell-Johnson Companies, acting on behalf of Lovemore Investments LLC, is seeking approval for Tentative Tract Map No. 20443 to subdivide an 18.49-acre parcel in Joshua Tree, San Bernardino County, into 64 single-family residential lots and two lettered lots for open space and recreational facilities totaling 2.75 acres. The project includes the development of five private internal streets with primary access via Hillview Road. The scope of work encompasses grading, vegetation removal, and the installation of stormwater infrastructure, all of which must comply with the San Bernardino County Development Code, the Countywide Policy Plan 2020, and California Title 24 building energy efficiency standards. The project is subject to rigorous environmental oversight under the California Environmental Quality Act (CEQA), featuring a recirculated Initial Study and Mitigated Negative Declaration to address court-mandated updates to hydrology and stormwater impact assessments. Key requirements include obtaining an Incidental Take Permit from the California Department of Fish and Wildlife, conducting pre-construction surveys for desert tortoises, burrowing owls, and nesting birds, and employing both Native American and paleontological monitors during ground-disturbing activities. Technical compliance is measured by the San Bernardino County Hydrology Manual, requiring post-development peak flows to be no more than 90 percent of pre-development levels. Administrative oversight is managed by the San Bernardino County Land Use Services Department, with a public review period conducted from August 3 to September 2, 2026.
Land Subdivision

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill
Solicitation # 20261102014
The Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill is a construction solicitation issued by the San Bernardino County Department of Public Works, Solid Waste Management Division. The scope of work involves the installation of Geosynthetic Clay Liners and underlying geomembranes, as well as the provision, calibration, and commissioning of process sensors, monitoring and control devices, and network systems including PLC programming. The project requires a contractor with a State Contractor A License and demonstrated experience in earthwork, geosynthetic membrane installation, and related infrastructure. Bidders must be registered with EPro and submit a comprehensive bid package including specific yellow page forms, non-collusion declarations, and CARB certifications to avoid being deemed non-responsive. Awarding will be based on the lowest responsible bidder, considering general competency, ability to perform the work, and the proposed delivery schedule. The prime contractor must perform at least 50 percent of the work, and any geosynthetics installation subcontractor must have completed at least three landfill projects of ten acres or more. The contract includes strict quality control requirements, including destructive seam testing for geomembranes and NRTL certification for electrical equipment. Payment is processed monthly based on work completed by the 25th of each month, with progress payments made within 30 days of an undisputed application. The contractor is also required to provide a baseline project schedule within 14 days of commencement and maintain comprehensive insurance and bonding, including performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS