This Solicitation opportunity from Utah was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources and the BLM Richfield Field Office, is seeking a single contract award for aerial seeding services across approximately 2,608 acres in Sevier County. The project is divided into three units: Unit 1 (Oak Springs Mastication Phase I) covering 669 acres, Unit 2 (Oak Springs Harrow Phase I) covering 1,688 acres, and Unit 3 (Boobe Hole Mastication Phase III) covering 251 acres. The contractor is responsible for applying approximately 23,912 lbs of government-provided seed using aircraft equipped with GPS to ensure 100 percent coverage, maintaining a maximum 80-foot seeding swath width.
Performance for Units 1 and 2 must begin on or before September 24, 2026, and be completed by October 7, 2026, while Unit 3 must be completed by November 15, 2026. To minimize seed drift, operations should start by 8:00 a.m., and the government may postpone seeding if wind speeds exceed 10 miles per hour. The award will be granted to the lowest total cost responsive and responsible vendor, with bids submitted on a cost-per-acre basis. Upon completion, the contractor must provide electronic coverage files in UTM projection North America Datum 1983. Payment is managed by UDWR, with invoices due within 30 days of delivery and payment processed within 30 days of receipt of a correct invoice.
General Info
Aerial seeding of 2,608 acres in Sevier County for Utah Division of Wildlife Resources.
HighAI Summary for 2026 Oak Springs Phase 1 Bullhog Seeding Map: A technical map document for the Bullhog seeding project (Phase 1) involving the Bureau of Land Management and other agencies. It defines a 661-acre area with specific land status designations and geographic coordinates.
PDF
PDF, High priority: read this first7 pages · ifb
HighAI Summary for 2026 OakSpringsPhase1 Bullhog Seeding Vendor Prerequisites: This document outlines the vendor prerequisites and administrative requirements for an Invitation for Bid (IFB) regarding the 2026 OakSpringsPhase1 Bullhog Seeding project. It details rules on communication, product samples, the Q&A process, submission requirements, price guarantees, and confidentiality claims under Utah Code Annotated (UCA) 63G-6a.
XLSX
XLSX, High priority: read this first2 pages · bid-tabulation
HighAI Summary for 2026 OakSpringsPhase1 Harrow Vicinity Bid Tabulation: A price comparison spreadsheet for the 2026 OakSpringsPhase1 Harrow Vicinity project. The document lists unit and total costs for three specific units of acreage across four vendors: Clark Seed, Hammond Helicopter LLC, Mountain Meadow Ag, and SafeChem Pest.
XLSX
XLSX, High priority: read this first2 pages · bid-tabulation
HighAI Summary for AS27-107 Bid Tabulation: A bid comparison spreadsheet for procurement AS27-107, detailing pricing for seed application across three units (669, 1688, and 251 acres). It compares total costs and unit prices from four vendors: Clark Seed, Hammond Helicopter LLC, Mountain Meadow Ag, and SafeChem Pest.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Boobe Hole Bullhog Mastication Project Phase III 2026 Map: A project map and site identification document for the Boobe Hole Bullhog Mastication Project Phase III 2026, covering an estimated 251 acres across USFS, SITLA, and private lands.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Boobe Hole Bullhog Mastication Project Phase III 2026 Map: A project map for the Boobe Hole Bullhog Mastication Project Phase III 2026, covering an estimated 251 acres across USFS, SITLA, and private lands, including boundaries near County Roads 4390, 4478, and 4453.
DOCX
DOCX, High priority: read this first1 page · sow
HighAI Summary for Boobe Hole Bullhog Mastication Project Phase III 2026 Scope of Work: Scope of Work for the Boobe Hole Bullhog Mastication Project Phase III 2026, covering an estimated 251 acres across USFS, SITLA, BLM, and private lands.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Boobe Hole Mastication Phase III 2026 Map: A topographic map and project outline for the Boobe Hole Bullhog Mastication Project Phase III 2026, covering an estimated 251 acres across USFS, SITLA, and private lands.
DOCX
DOCX, High priority: read this first3 pages · sow
HighAI Summary for Oak Springs and Boobe Hole Aerial Seeding Project SOW: Scope of Work for the 2026 aerial seeding of approximately 2,608 acres across three units in Sevier County, Utah, for the BLM Richfield Field Office and UDWR. The document specifies seeding rates, GPS requirements, seed transport from the Great Basin Research Center, and performance timelines between September and November 2026.
DOCX
DOCX, High priority: read this first3 pages · specifications
HighAI Summary for Oak Springs and Boobe Hole Aerial Seeding Project Specifications 2026: Technical specifications for an aerial seeding project in Sevier County, Utah, involving the BLM Richfield Field Office and Utah Division of Wildlife Resources. The scope includes seeding approximately 2,608 acres across three units (Oak Springs Mastication, Oak Springs Harrow, and Boobe Hole Mastication) with specific bulk rates and GPS requirements. The document outlines seed transport from the Great Basin Research Center, performance windows between September and November 2026, and requirements for pre-work and progress meetings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oak Springs Phase 1 Bullhog Seeding Map: A technical map/specification document for the Oak Springs Phase 1 Bullhog project, covering 663 acres. The document provides geographic coordinates and boundaries for the seeding area, issued by the Bureau of Land Management.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oak Springs Phase 1 Bullhog Vicinity Map: A map document dated September 03, 2026, issued by the Bureau of Land Management (BLM) for Oak Springs Phase 1, depicting the Bullhog Vicinity area with a map scale of 1:21,000.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oak Springs Phase 1 - Harrow Map: A map document dated September 03, 2026, from the Bureau of Land Management (Cedar City, UT) depicting Oak Springs Phase 1 in the Harrow area. The document includes geographic markers, scale (1:21,000), and location data near State Route 84.
DOCX
DOCX, Low priority5 pages · contract-document
LowAI Summary for Attachment A: Purchase Order Terms and Conditions: Standard terms and conditions for the procurement of goods and services for a State of Utah entity. The document outlines definitions, governing law, records administration, E-verify requirements, indemnity, and contractor responsibilities.
PDF
PDF, Low priorityspecifications
LowAI Summary for Oak Springs Bullhog Vicinity Map: A map document for the Oak Springs Bullhog vicinity, detailing land status (BLM, State, Private, US Forest Service), coordinates, and geographic annotations for an area of approximately 661 acres.
PDF
PDF, Low priorityspecifications
LowAI Summary for Oak Springs Phase 1 - Harrow Map: A geographical map and data sheet for Oak Springs Phase 1 (Harrow), covering 1,688 acres. The document includes land status (BLM, State Wildlife Reserve), map scale (1:170,000), elevation markers, and coordinates for the area surrounding Glenwood Mountain and Black Ridge.
PDF
PDF, Low priorityspecifications
LowAI Summary for Oak Springs Phase 1 - Harrow Map: A map document from the Bureau of Land Management (BLM) for Oak Springs Phase 1, Harrow vicinity. It includes land status details for 1,688 acres, geographical annotations, and map scale (1:170,000), serving as a technical reference for land and project boundaries.
XLSX
XLSX, Low priority5 pages · contract-document
LowAI Summary for State of Utah Purchase Order Terms and Conditions: Standard terms and conditions for the State of Utah regarding the purchase of goods and services. The document defines key roles, governing law (Utah), records administration, E-verify requirements, and indemnity clauses.
PDF
PDF, Low priority7 pages · other
LowAI Summary for Vendor Prerequisites for IFB Agency Solicitation: This document outlines vendor prerequisites for an Invitation for Bid (IFB) solicitation by the State of Utah Division of Purchasing. It includes vendor certification requirements, communication restrictions, product sample submission guidelines, and clarifies that a solicitation award is not a contract. The document details the question and answer period procedures, response submission instructions, price guarantee period, and rules for handling protected information and claims of business confidentiality. It also references compliance with Utah Code Annotated and administrative codes governing the solicitation process. The document serves as guidance for vendors participating in the IFB process but does not itself constitute a solicitation or contract.
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Issuing Procurement Unit: State of Utah Division of Purchasing
Conducting Procurement Unit: State of Utah Division of Wildlife Resources The purpose of this IFB is to enter into a contract to provide aerial seeding services according to Attachment B.
Mandatory Site Visit: None It is anticipated that this IFB will result in a single contract award to the lowest total cost responsive and responsible vendor. Length of Contract: Seeding should start on or before September 24th, 2026 and should be completed by October 7th 2026. This will be for units #1 and #2 of the BLM portion. The Boobe Hole Mastication Portion unit #3 will need to be applied on or Before November 15th, 2026. This is due to other restrictions associated with private land.
Vendor must guarantee its pricing through term of the project.