Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on April 27, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C1DA--Upgrade Emergency Power Distribution Design

Closed
36C24121R0141Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
International
RIBA Stage 1 Feasibility Study for William Aston Hall, Wrexham University
Solicitation # HD/PM/08/10/2026
Wrexham University is seeking quotations from qualified consultants or consultant teams to conduct a RIBA Stage 1 Feasibility Study for William Aston Hall on the Plas Coch campus. Operated in partnership with Theatr Clwyd, the venue requires a comprehensive appraisal to develop and compare options for the audience journey, auditorium, technical theatre, backstage facilities, access and inclusion, heritage constraints, and building services. The study must provide broad cost ranges, phasing advice, and delivery risks, with all core services and the final report due by February 19, 2027. The project is funded by the Arts Council of Wales Arts Capital Investment Fund with match funding from the university. The maximum budget for core Stage 1 services is 50,000 GBP including VAT, and any quotations exceeding this amount will be rejected. While the university is requesting optional pricing for Stage 2 Concept Design, the award for that stage is discretionary and subject to available funding. Quotations must be submitted via the Sell2Wales Tender Postbox by 12:00 noon on October 27, 2026. All suppliers must be registered on the Government Central Digital Platform and meet mandatory conditions regarding health and safety, data protection, financial standing, and a minimum of 5,000,000 GBP in employer liability insurance. The contract will be awarded based on the Most Advantageous Quote, with evaluation weighted toward quality (80%) and price (20%). Quality assessments focus on the understanding of the brief, methodology, team experience, programme management, and stakeholder engagement. The successful appointment will be governed by the RIBA Concise Professional Services Contract 2020 (2024 Amendment) for Architectural Services.
Wrexham University

POSTED

about 5 hours ago

DEADLINE

in 9 days
NAICS: 541310
New
Federal
C1DA--Renovate Specialty Clinics on 2nd
Solicitation # 36C24526R0101
Solicitation 36C24526R0101 is a request for Architect/Engineer services to provide a turnkey design package for the renovation of approximately 16,530 square feet of specialty clinic space on the second floor of the Beckley VAMC in West Virginia. The project focuses on creating an updated central check-in and waiting area, improving wayfinding and traffic flow to support a one-stop care approach, and upgrading systems in a facility originally constructed in the 1950s to meet current building codes and VA guidelines. Key deliverables include construction drawings across all disciplines, schematic designs, life-cycle cost analysis, preconstruction risk assessments, and detailed phasing and infection control plans to manage work within an occupied facility. While the A/E service value is not specified, the resulting construction budget is not to exceed 19,912,000 dollars. This procurement is a 100 percent Service-Disabled Veteran-Owned Small Business set-aside conducted under the Brooks Act. Selection is based on qualifications, with a shortlist of three to five firms chosen for interviews. The primary evaluation factors are professional qualifications, specialized experience in healthcare renovation, and past performance, followed by capacity to accomplish the work, organization and quality control, and geographic knowledge of the locality. Interested firms must be registered in SAM and certified in the SBA Veteran Small Business Certification database. The submission deadline for SF 330 qualifications packages has been extended to November 13, 2026, at 2:00 PM EST, with submissions required in PDF format and limited to 5MB per email attachment.
245-NETWORK Contract Office 5 (36C245)

POSTED

about 8 hours ago

DEADLINE

in 23 days
NAICS: 541310
New
SLED
RFQ 2026-04 Annual Architectural Services- Short Listed Firms
Solicitation # RFQ 2026-04
Tallahassee State College issued RFQ 2026-04 to secure a continuing services contract for annual architectural services supporting new construction, renovation, and remodeling projects. The solicitation seeks firms capable of providing ongoing architectural expertise tailored to a public higher education institution, with a maximum potential contract term of three years consisting of an initial period and optional one-year renewals. The selection process involves a rigorous evaluation of written proposals based on a point system covering management adequacy, project workload, experience with similar projects, and cost control methods, alongside pass/fail assessments for licensing and insurance. Following the initial evaluation, the college has short-listed Architects Lewis + Whitlock, BFBS Architects, BKJ, Inc Architecture, DAG Architects, and Fitzgerald Collaborative Group to proceed to in-person presentations and interviews. The final agreement will require compliance with Florida law, the Americans with Disabilities Act, and OSHA regulations, as well as specific federal requirements such as the Davis Bacon Wage Act if federal funding is utilized. Contract administration includes net 30 payment terms and strict invoicing requirements, while the college maintains the right to terminate the agreement for convenience with 30 days written notice.
Tallahassee State College

POSTED

1 day ago

DEADLINE

in 2 days
NAICS: 541310
New
SLED
Architect-Engineering Services for the FL 6th District Court of Appeal – New Courthouse
Solicitation # RFQ REDM2627-01
The Florida Department of Management Services, Division of Real Estate Development and Management, is soliciting Request for Qualifications RFQ REDM2627-01 for architectural and engineering services to design and construct the new State of Florida Sixth District Court of Appeal courthouse. Located on a 5.30-acre state-owned parcel at 4165 Lakeland Hills Boulevard in Lakeland, Florida, the project scope includes the development of an appellate courtroom, judicial chambers, staff offices, a Clerk's Office, a Marshal's Office, secured and public circulation, technology and security systems, and approximately 120 parking spaces. The project has an estimated construction budget of 53.5 million dollars, which excludes the compensation of the selected Architect-Engineer. The procurement utilizes a two-stage qualifications-based selection process in accordance with section 287.055, Florida Statutes. Stage one involves a preliminary screening based on the firm's proximity to the project, relevant design experience, and ability to perform contract delivery. Firms advancing to stage two will be evaluated through interviews and presentations focusing on past performance, understanding of program requirements, and approach and methodology. The anticipated contract start date is March 2, 2027. Respondents must be legally registered in Florida and authorized to practice architecture, engineering, and landscape architecture under applicable state statutes. Mandatory submission requirements include a letter of interest, a Professional Qualifications Supplement, a project listing of relevant experience, current Florida licenses, and a completed Federal GSA Standard Form 330. All responses must be submitted in Adobe PDF format on a thumb drive to the Procurement Liaison, who serves as the sole point of contact. Selected firms must adhere to strict confidentiality requirements regarding building plans under Florida Sunshine laws and comply with all state building codes and fire safety standards.
Department of Management Services

POSTED

1 day ago

DEADLINE

in 5 months

General Info

NAICS

541310 - Architectural Services

Place of Performance

Department of Veterans Affairs VAMC MANCHESTER, NH 718 Smyth Road, Manchester, ME, 03104

Set-Aside

NONE

Documents

1

36C24121R0141.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts
Carol AhNeeContract Specialist

Full Description

Show more
Introduction Network Contracting Office 1 (NCO 1), supporting VA New England Healthcare System (VISN 1), is seeking potential sources for an upcoming requirement for Architect and Engineering Services as described in the attached statement of work. THIS NOTICE IS NOT A REQUEST FOR QUALIFICATION STATEMENTS (SF330). This notice is a market research tool and has not been set-aside for any small business category, but the notice is issued to determine appropriate set-aside categories. Responses to this notice, in conjunction with other Government market research resources, will be used by the contracting officer to determine the applicable socio-economic set-aside for the procurement. Failure to respond to this notice will not impact consideration of architect and engineer firms (or joint ventures) which otherwise meet set-aside requirements and submit responses to the follow-up public announcement. Once the appropriate set-aside is determined, a separate public announcement requesting qualification statements (SF330s) will be publicized on Contract Opportunities in accordance with 40 U.S. Code § 1101 and FAR 36.601. General Project Description and NAICS Synopsis of required services (See attachment for full statement of work): Architectural and Engineer services required to complete the project for the Upgrade of Emergency Power Distribution. This procurement for Architect & Engineering services is assigned NAICS 541330 Engineering Services which has an SBA size standard of $16.5 million in average revenue. Information Sought The Government requests a letter of interest (or similar document) with responses to the following: 1. State your firm name (as it appears in SAM.gov), DUNS number, and socio-economic status of the firm (i.e. verified SDVOSB, WOSB, SB, large business). 2. Provide a brief narrative on the firm s experience providing services like those described in the attached statement of work. 3. What would be the expected make-up of the firm s team in terms of socio-economic categories and estimated percentage of work to be completed by your firm and each subcontractor? If the procurement is set-aside for any category of small business, generally fifty percent of more of the work would need to be performed by the contractor or a similarly situated subcontractor in terms of percentage of cost. For instance, if set-aside for service-disabled veteran-owned small business (SDVOSB), 50% or more of the contract would need to be performed by verified SDVOSBs no other small business categories would count towards the percentage. If set-aside for small business, 50% of the contract would be required to be performed by small businesses which would include performance by a verified SDVOSB because they are also a small business. If the procurement is not set-aside and reaches certain dollar thresholds, the Government would negotiate an acceptable subcontracting plan to utilize small business concerns. 4. A brief statement of overall interest in the project and capability of performing the work in conjunction with ongoing projects. 5. Any additional capabilities statements or other documentation that you feel will assist the Government in performing market research and determining the appropriate set-aside. Submission Instructions Interested parties are requested to submit the requested information not later than 05-10-2021 to Carol AhNee via email to Carol.ahnee@va.gov. Please include 36C24121R0141 Sources Sought Response in the title of the email. the response burden to this notice is expected to be light; lengthy responses are not expected but no maximum page count is assigned. Please keep responses below 7MB or send multiple emails appending to the email subject 1 of n as appropriate. Please contact Carol AhNee, Contract Specialist at Carol.ahnee@va.gov with any questions. Attachments: Scope of Work; BACKGROUND INFORMATION A. For the purposes of this scope of work, emergency power distribution includes all power distribution that has generator back-up. B. The Architect/Engineer (A/E) is to provide a complete design for Project 608-21-208, Upgrade Emergency Power Distribution. The intent of the project is to correct deficiencies and provide a system that can support future growth for the portion of the emergency power distribution system from the generators through the initial distribution panels downstream of the automatic transfer switches. C. Overview of Existing Conditions: Buildings 2, 3, 4, 5, 13, and 14 are planned to be demolished and are not included in this project s scope. Building 1 (190,000 sf, built 1949) is the original main medical center building. All electrical distribution for Building 1 originates in Building 20, which is connected to the basement of Building 1. Above-ceiling space in the basement corridors of Building 1 is very limited and it s becoming difficult to access Building 20 for new power feeds. Building 6 (3,500 sf, built 1949) is an office building. The emergency power distribution for Building 6 originates in Building 7. Building 7 (13,000 sf, built 1949) contains the boiler plant, garage, and generator room. Three fairly new emergency generators and paralleling switch gear, in use since December 2018, are located in this building. These generators supply emergency power for Buildings 1, 6, 7, 18, and 20. Building 15 (72,000 sf, built 1978) contains the Community Living Center, which is the only overnight care provided on the campus. It also contains other medical clinics and is connected to Building 1. Building 15 has its own generator, installed in 2005 and located in a courtyard outside of the building. Building 15 also has dedicated automatic transfer switches and subsequent distribution. Building 18 (12,000 sf, built 1978) contains a Primary Care Clinic and is connected to Building 1. Building 18 has dedicated automatic transfer switches and subsequent distribution. Building 20 (2,500 sf, built 1975) contains the electrical distribution for Building 1. Finding capacity for new power feeds in Building 20 s emergency power distribution is becoming difficult. In particular, the equipment distribution panels are at capacity. Supplement A, Page 2 D. Known Deficiencies: In 2019/2020, a detailed electrical condition assessment was performed for the campus. The assessment identified several deficiencies related to the emergency power distribution system. The report from the assessment is included as Attachment A. Current one-line diagrams for the facility are included in the report. II. Design Task: A. Feed Building 15 from the emergency generators located in Building 7. Remove Building 15 s existing emergency generator. B. Evaluate and redesign the electrical distribution system from the generators through the first level of distribution downstream of the automatic transfer switches. 1. Correct all deficiencies from the May 2020 Electrical Condition Assessment (Attachment A, see Section 7 of the report) for this portion of the distribution system. 2. Provide the ability to load shed. 3. Increase the capacity of the emergency power distribution system. Provide capacity on all branches for future improvements. 4. Provide improved access to power distribution for future power feeds. This may include recommending new electrical room locations, providing new conduit paths to Building 20, or any solution that will make it possible for multiple future projects (on the scale of building additions and new HVAC units) to access emergency power distribution. C. Supply Panel DX2 with emergency power. Panel DX2 is a 480V panel that provides power for most of Radiology s imaging equipment. III. EXPERIENCE REQUIRMENTS A. The A/E firm shall have a minimum of 5 full time personnel dedicated to electrical design, not including CAD technicians. At least 2 of these staff shall be licensed Professional Engineers, with their PE obtained in electrical engineering. B. The A/E firm shall have completed a minimum of 5 designs for projects correcting or retrofitting electrical systems in facilities with at least 150,000 square feet and that are at least 40 years old. These projects each shall have had a total project cost of at least $1M and been designed in the last 7 years. C. At least two members of the proposed electrical design team shall have each worked on at least two of the projects from paragraph B above (they do not need to have worked on the same projects). D. A/E shall supply references for at least 3 of the projects from paragraph B above. Supplement A, Page 3 E. Due to current pandemic travel restrictions, the entire design team proposed for the project shall be located in New England (New Hampshire, Maine, Vermont, Massachusetts, Connecticut or Rhode Island). Personnel who have traveled outside of New England in the previous 14 days won t pass the screening to get onto the site and thus wouldn t be able to conduct site investigations or attend meetings. IV. CONSTRUCTION BUDGET A. The construction budget is $3,000,000. B. The intent of the design shall be a project that can be built without changes or change orders, within budget, and function as intended. C. The design shall not exceed the construction budget at any stage of design past the initial study report. Any design submission that exceeds the construction budget will be rejected. The A/E is responsible for correcting and resubmitting all rejected design submissions before moving on to the next submission, at no added cost to the VA. No extensions to the period of performance will be granted for resubmission of rejected design submissions. D. If, at any time, the A/E suspects that the project cannot be designed within the established construction budget, they shall notify the contracting officer and contracting officer s representative (COR) in writing immediately. V. DUTIES OF THE A/E A. The A/E shall provide complete investigative and design services needed to provide a fully coordinated, functionally integrated, and operational design and subsequent project. B. The work shall include: 1. Preliminary meetings and site survey investigations to define the necessary elements of the project scope of work. A preliminary meeting shall be devoted to discussion with facility staff to discuss project goals, current emergency power distribution issues, and potential solutions. 2. A detailed analysis of the various options available, covering design constraints, access requirements and all applicable codes and standards. 3. A full field investigation of all areas affected by this design. Site investigations shall measure, photograph, and document the conditions of areas to be renovated and/or impacted. This information shall be physically reviewed in the field with the COR and clearly conveyed in the construction documents. Supplement A, Page 4 4. Any investigations necessary for the proper design of this project. The costs of such investigations shall be included in this task order. Examples include electrical metering, equipment inspections, subsurface exploration, utility locating, etc. 5. Preparation of drawings, specifications, estimates, and phasing schedules, as called for in this scope of work and within the established construction budget. 6. Specific phasing instructions to minimize the impact of the work on the facility. Examples include afterhours work, utilizing one shutdown for multiple connections (may require multiple work crews), providing temporary power if needed, etc. 7. Design Review Meetings: a. Professional architects, engineers, and related design disciplines familiar with the work shall be provided to attend the VA design reviews at the VA Medical Center in Manchester, NH. Review meetings may be held virtually, depending on pandemic restrictions. b. The A/E shall provide minutes of each review meeting to the Contracting Officer for review within 3 business days following the review meeting. 8. Construction Period Administration (CPA) Services, including: a. Review and approval of construction submittals covering products that have been listed within the contract documents, including cut sheets, manufacturer s data/performance sheets, samples, shop drawings, schedules, and phasing plans. b. Recommendations associated with acceptance or rejection of alternate materials and products. c. Responses to Request for Information (RFI). d. Cost/time/impact estimates and recommendations relevant to design errors or omissions. e. Participation by conference call in weekly project review meetings with the contractor. f. Active participation in construction coordination. g. 20 site visits, spread across the various design disciplines, as required and/or requested by the VA Contracting Officer and Project Engineer for inspection of ongoing construction, including final tests and inspections. (a) A site inspection report shall be furnished to the Contracting Officer and Project Engineer within three workdays following all site visits during the construction period. Supplement A, Page 5 (b) The site inspection report shall include the purpose of the inspection, items reviewed, deficiencies observed, recommendations and additional actions required. h. Providing a punch list within 5 working days of being notified of construction substantial completion. The A/E shall keep a log of all punch list findings and conduct follow-on site visits to verify completion of the punch list. i. Verification that all devices (valves, circuits, equipment, etc.) have been properly labeled and/or tagged with charts and cards as noted in the specifications or per codes. j. Preparation of record documents (also known as as-built documents) in accordance with Supplement B, which the VA will retain permanently. (a) Record documents shall be based on verification of as-built conditions from contractor-supplied marked up prints, issued SK s, RFI s, coordination drawings, shop drawings, photos, and site inspections. (b) The A/E shall be responsible for assuring that record documents are accurate at the end of the construction of the project. (c) The A/E shall also update the facility s existing AutoCAD space utilization, site, and utility (electrical, plumbing, and steam) as-built drawings with the asbuilt information from this project. The updated AutoCAD files shall be provided to the VA no later than 30 days after completion of the project record drawings. C. Provide all necessary engineering and design services for architectural, site development, mechanical (plumbing, fire protection and HVAC), electrical, structural, asbestos abatement, signage, and other specialty consultant elements within the limits of the project goals established to support Supplement B submissions. Each discipline shall document and investigate the relevant existing conditions, review the building available information, and verify all essential elements pertinent to their discipline. D. At each stage of design, the VA will provide review comments. The A/E shall provide a response/resolution to each comment within one week of the design review meeting. The VA and the A/E shall agree on the appropriate resolution of each comment before the design moves forward to the next stage. E. Any design document submission that has not fully addressed the comments from the previous submission, or which is clearly not coordinated between disciplines, may be rejected by the VA, at the VA s discretion. The A/E is responsible for correcting and resubmitting all rejected design submissions before moving on to the next submission, at no added cost to the VA. No extensions to the period of performance will be granted for resubmission of rejected design submissions. Supplement A, Page 6 F. Design shall comply with the latest editions of all applicable VA guidelines (eg, Construction Standards, Design Guides, Design Manuals, Master Construction Specifications, Standard Details, Special Design Criteria); NFPA; Joint Commission; and federal, state and local codes pertinent to the project scope. G. Comply with all applicable VA Design Manuals, available at http://www.cfm.va.gov/til/dManual.asp. H. At each stage of design, submit the appropriate design review checklists, available at https://www.cfm.va.gov/til/aeDesSubReq.asp I. In the design of this contract, consider all requirements (other than procedural requirements) of: 1. zoning laws; 2. laws relating to landscaping, open space, historic preservation, and aesthetic qualities of a building, and similar laws, of the State and local political division which would apply to the building if it were not to be constructed or altered by the U.S. Government; and 3. Depart of Labor, Occupational Safety and Health Standards, and occupancy requirements. The A/E shall provide prompt, written notification to the Contracting Officer concerning conflicts with or recommended deviations from codes, laws, regulations, standards, and opinions of review officials as described above. J. No work altering the scope of this contract shall be undertaken prior to receipt of written approval of the Contracting Officer. The COR/Project Engineer does not have the authority to modify the contract. K. The required response time for all submittals, RFIs and VA requests, unless otherwise stated by the VA, shall be 14 calendar days. If the scope of the required action is extensive, the A/E shall notify the Contracting Officer and request additional time as soon as possible. The VA may occasionally request a faster turn-around time in order to avoid construction delays. The A/E is expected to make every reasonable effort to expedite items that may cause construction delays. L. Construction Document Requirements: 1. Provide in accordance with Supplement B sets of both drawings (Revit or AutoCAD and PDF) and specifications (MS Word and PDF). a. Provide a separate Adobe Acrobat PDF file for each drawing. b. Provide a complete set of drawings in a single Adobe Acrobat PDF file. Supplement A, Page 7 2. Drawing size is 30 inches by 42 inches. 3. Drawings shall be provided in Revit or AutoCAD formats. Specifications shall be compatible with MS Word 2010. 4. File names shall be the drawing/specification number followed by the drawing/specification title, or as approved by the VA Project Engineer. 5. Final specification sections shall be merged into a single pdf file to include separate full document pagination in the right-hand side of Footer without the loss of individual file Headers/Footers. Each specification section shall be bookmarked in Adobe Acrobat, with bookmark labels of the specification number and specification title (i.e. 010000 General Conditions). M. The A/E shall provide an estimated period of performance with the final construction documents. VI. DESIGN INSTRUCTIONS A. Facility Standard Items: The A/E shall incorporate items from the attached list of facility standard items (Attachment B) as applicable. Brand-name products must be specified as or equal and shall include the salient characteristics of products that would be considered equal. B. Specifications: VA Master Construction Specifications, available at www.cfm.va.gov/TIL/spec.asp, shall be the basis for the construction specifications. These specifications are written to cover a wide variety of project types and sizes. EACH SPECIFICATION MUST BE CAREFULLY EDITED FOR THIS PROJECT. The track changes tool in Microsoft Word shall be utilized when editing specifications so that VA reviewers can see the changes that have been made. C. Signage: All signage required to meet OSHA, NFPA, and any other regulatory requirements shall be included in the design. This includes labels for all electrical panels affected by the project. Signage style is to match existing Medical Center signage, specifications are available from the VA. D. Industrial Hygienist (IH): IH services shall include identification of, and abatement plans and specifications for, all hazardous materials, including asbestos, lead, and mold. E. Seismic: The design shall comply with VA Handbook H-18-8 Seismic Design Requirements, available at http://www.cfm.va.gov/til/etc/seismic.pdf . F. Physical Security: 1. Ensure that the design complies with the current version of the VA Physical Security and Resiliency Design Manual, available at https://www.cfm.va.gov/til/PhysicalSecurity/dmPhySec.pdf. Supplement A, Page 8 2. Vehicle barriers, where required, shall be aesthetically pleasing and/or serve a dual purpose. For example, planters, rocks, and benches are strongly preferred over bollards. 3. Security systems shall be compatible with and integrated into the medical center s existing systems. 4. If the Physical Security guidelines cannot be met, the A/E (and/or their consultant) shall provide alternatives to the guidelines and assist with any waivers that may be required for security measures that cannot be met. G. Sustainability: Ensure that the design complies with the sections of the VA Sustainable Design Manual applicable to NRM Construction Projects, available at https://www.cfm.va.gov/til/sustain/dmSustain.pdf

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 541330
New
Federal
C221--402-27-001 Repair Chiller 3 (AE)
Solicitation # 36C24127R0009
Network Contracting Office 1, supporting the VA New England Healthcare System, is conducting market research to identify potential sources for Architect and Engineering (AE) services at the VA Maine Health Care System in Togus. The project focuses on evaluating existing conditions and designing corrective measures to repair Chiller 3, specifically addressing low voltage faults and refrigerant and oil leaks. The scope is limited to Type A services, concluding with a 35 percent design submission, and includes investigative services such as site visits, field studies, and user interviews. The period of performance for this work is 90 calendar days. This notice is a sources-sought tool used to determine the appropriate socio-economic set-aside for the eventual procurement under NAICS 541330, which has an SBA size standard of 22.5 million dollars in average revenue. Interested firms must submit a letter of interest by November 20, 2026, to Diane C. Davis, including their UEI number, socio-economic status, a narrative of similar experience, and proposed team composition. The government requires that if a set-aside is implemented, at least 50 percent of the work must be performed by the prime contractor or similarly situated subcontractors. All design work must adhere to the VA Technical Information Library standards, and sensitive infrastructure data must be marked as For Official Use Only.
Engineering Services

POSTED

about 8 hours ago

DEADLINE

in 30 days
View Details
NAICS: 811310
New
Federal
H146--Hach Water Quality Monitoring Service
Solicitation # 36C24127Q0031
The Department of Veterans Affairs Networking Contracting Office intends to enter into a sole source procurement with Hach Company under FAR 6.302-1 for water quality monitoring services at the VA Medical Center in White River Junction, Vermont. This requirement is designated under NAICS code 811310. The scope of work involves the inspection, maintenance, repair, and annual calibration of ten Hach water quality monitoring instruments located across several facility buildings, as well as the annual calibration of one colorimeter. The contract includes two scheduled visits per 12-month period, 24/7 emergency service, and monthly reagent refills. These services are critical for ensuring the supply of safe drinking water and generating the daily data reports required by the State of Vermont Drinking Water Protection Division. The procurement is awarded to Hach Company because the equipment and services are proprietary, and the manufacturer does not authorize other organizations to perform repairs or recalibrations. Because the work is performed within a functioning hospital, the contractor must adhere to strict infection control practices and submit an Infection Control Plan, Activity Hazard Analysis, and Material Safety Data Sheets for approval. All work must comply with NFPA, OSHA, EPA, and specific VA specifications and handbooks. The government retains all rights to data and electronic records produced under the contract, and the contractor must comply with the Privacy Act of 1974 and the Freedom of Information Act. Interested parties must submit their capabilities to Kenya Mitchell by the specified deadline to determine if competitive procedures are feasible.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 561730
New
Federal
S208--West Haven Grounds and Maintenance
Solicitation # 36C24127Q0004
The Department of Veterans Affairs, Network Contracting Office 1, is soliciting proposals for a firm-fixed-price contract to provide comprehensive grounds maintenance, snow and ice removal, and storm drain cleaning services at the West Haven VA Medical Center in Connecticut. This total small business set-aside under NAICS 561730 includes a base year and four option years, with a total duration not to exceed five years. The scope of work requires 24/7 availability for snow and ice events, with a mandatory response time of one hour and the requirement for a field service representative located within 200 miles of the campus. Key services include mowing 30 acres of improved grounds, fall leaf removal, bi-annual storm drain cleaning for both West Haven and Newington campuses, and specialized snow removal for parking garages. Fertilization, pest control, and soil aeration are expressly excluded from the contract. Award will be granted to the Lowest Priced Technically Acceptable (LPTA) offeror. Technical acceptability is based on the capability to perform all services, equipment inventory, and personnel qualifications, while past performance is evaluated on a go/no-go basis requiring at least three references from the last five years. Proposals must be submitted in two volumes, consisting of a technical capability statement and a completed CLIN pricing schedule, by October 29, 2026, at 10:00 AM Eastern Time. Performance is monitored via specific acceptable quality levels based on customer complaints, and the contractor must adhere to Service Contract Labor Standards for the West Haven and Newington areas.
Landscaping Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS