Calaveras Dam Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goat Rock Bioregional Habitat Restoration Pond PA163 De-sedimentation and Repair Project is executed under Lake or Streambed Alteration Agreement EPIMS-ALA-59863-R3 by the California Department of Fish and Wildlife for the San Francisco Public Utilities Commission. Pursuant to Section 1602 of the Fish and Game Code, the project is located in Alameda County at two unnamed tributaries to Alameda Creek. The scope of work is limited to repairing an on-stream pond through the removal of sediment and vegetation and the stabilization of the pond bank and spillway, which requires a temporary stream crossing for site access. The project was approved on September 11, 2025, with the City and County of San Francisco Planning Department serving as the Lead Agency. The California Department of Fish and Wildlife acted as the Responsible Agency and determined that the project would not have a significant environmental effect within its jurisdiction, provided that specific mitigation measures are implemented as conditions of approval. The project is categorized under NAICS code 237990 and is associated with the Calaveras Dam Replacement Project forecast.

General Info

San Francisco Public Utilities Commission approved to repair pond in Alameda County, remove sediment, stabilize banks, install temporary crossing under state environmental permit.

Agency

California → City and County of San Francisco

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-ALA-59863-R3 Notice of Determination for Goat Rock Bioregional Habitat Restoration Pond Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
Contacts2 people available
OfficeN/A
Organization / Agency
California → City and County of San Francisco
Office AddressN/A
Contacts
Amanda CulpepperSenior Environmental Scientist (Specialist)
Chris KernLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed LSA Agreement EPIMS Notification No. EPIMS-ALA-59863-R3, pursuant to Section 1602 of the Fish and Game Code to San Francisco Public Utilities Commission. The project is limited to repairing an on-stream pond by removing sediment and vegetation and stabilizing the pond bank and spillway. Access to the pond will require a temporary stream crossing.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, vegetation clearance, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole through clearing, grubbing, and stone rework. The estimated value of the work ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Bids must be submitted as sealed envelopes to Fort Shafter, Hawaii, as electronic submissions are not permitted. Award is based on the lowest responsive and responsible bidder. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is contingent upon pre- and post-dredge multi-beam surveys meeting USACE accuracy standards. Failure to meet the delivery schedule may result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Mines Road Portal Project
Solicitation # 27AML01-2
The Mines Road Portal Project, solicitation number 27AML01-2, is a unit price contract issued by the Virginia Department of Energy for the reclamation of one priority 1 portal and one priority 1 vertical opening located at 6196 Mines Road in Pulaski County, Virginia. The scope of work includes the construction of a portal closure using VDOT gabion stone and a bat gate, the installation of HDPE piping for wet seals and bat gates, general clearing of clogged streams, revegetation, and the implementation of erosion and sediment control measures. Due to environmental restrictions, all work must be performed between August 15 and October 15. The project has a strict performance timeline, requiring work to begin within five calendar days of the contract award and reach completion within 16 calendar days. The contract will be awarded to the lowest responsive and responsible bidder, with priority given to DSBSD-certified micro or small businesses. Bidders must submit their proposals via the eVA portal by September 18, 2026, and provide necessary documentation including a small business subcontracting plan and specific performance and payment bonds. The project is subject to the Davis-Bacon Act and the Build America, Buy America Act, requiring adherence to prevailing wage rates and domestic material preferences. Invoicing is based on actual, documented costs, and mobilization costs are capped at 10 percent of the total base bid. Final acceptance is contingent upon inspection and approval by the Agency's Project Inspector.
Virginia Department of Energy

POSTED

about 15 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS