San Francisco Bay Aggregate’s Global Innovation Center

Forecast
AP-24-0067State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Francisco Bay Aggregate's Global Innovation Center project, under Planning Application No. AP-24-0067, involves the establishment of a permanent carbon sequestration plant on a 2.5-acre site at 895 E. 3rd Street in Pittsburg, California. Led by the City of Pittsburg and applied for by Blue Planet Systems Inc, the project requires a Use Permit, Design Review, and height Variance to convert an existing pilot concrete aggregate production facility into a continuous production operation. The facility will utilize proprietary Blue Planet process technology to combine CO2 from local vendors with recycled concrete aggregate to produce upcycled rock aggregates that exceed ASTM C33 standards. Construction is estimated to take 12 to 18 months, with a projected start date in 2025. Environmental assessments through a Mitigated Negative Declaration have identified less-than-significant impacts, though specific mitigation is required for air quality. The Department of Toxic Substances Control has mandated detailed assessments regarding the integrity of the existing site cap, construction impacts, and vapor intrusion risks from volatile organic compounds. Additionally, the project requires the on-call retention of a qualified archaeologist to oversee ground-disturbing activities and ensure compliance with California state codes regarding cultural resources and human remains. The facility will be constructed on an impervious surface with integrated industrial fire safety systems and ADA-compliant site access.

General Info

Blue Planet Systems will build a carbon sequestration plant in Pittsburg, California by 2025.

Agency

California → City of Pittsburg

Place of Performance

E 3rd Street, Pittsburg, CA, 94565

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Interested Companies (1)

Car & AssociatesMartinez, CA

Full Description

Show more
The proposed project consists of: Planning Application No. AP-24-0067 for a Use Permit, Design Review and height Variance to establish a permanent carbon sequestration plant at a 2.5-acre subject site located at 895 E. 3rd Street, Pittsburg CA 94565 in the IG (General Industrial) District. Assessor’s Parcel No. 073-020-019.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS