Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Caltrans Encroachment Permit 02-25-6-BB-0286 for the CVIN, dba Vast Networks State Route 299 Middle-Mile Broadband Network Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

CVIN, doing business as Vast Networks, in coordination with the California Department of Technology and Caltrans, is implementing a middle-mile broadband network project to install critical infrastructure on State Route 299 in Modoc County, specifically between post mile 38.29 and 39.498. This initiative is part of a larger statewide effort mandated by Senate Bill 156 to create an open-access network that connects to third-party last-mile providers, thereby increasing the affordability and availability of high-speed internet for homes, businesses, and community institutions across California. The project is governed by Caltrans Encroachment Permit 02-25-6-BB-0286 and is statutorily exempt under Public Resources Code Section 21080.51. The scope of work involves the installation of approximately 6,200 linear feet of broadband conduit and fiber optic cable, utilizing two 1.5-inch high-density polyethylene ducts buried at a minimum depth of 48 inches. Additional technical requirements include the use of 5-inch cased bores for roadway crossings and the installation of four standard poly/concrete vaults measuring 3 by 5 by 3 feet. Most activities will occur within 30 feet of highway rights-of-way, focusing on existing paved surfaces and maintained Caltrans right-of-way. Site preparations include the placement of temporary traffic control devices, minor vegetation removal, and the implementation of erosion control measures.

General Info

Vast Networks installing 6,200 feet of broadband fiber on State Route 299, Modoc County.

Agency

California → Caltrans, District 2 - Redding

Place of Performance

Alturas, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Mike StewartDirector of Marketing and Business Development

Full Description

Show more
CVIN, dba Vast Networks, in coordination with the California Department of Technology and the California Department of Transportation (Caltrans), proposes the installation of broadband infrastructure consisting of conduit, fiber optic cable, and vaults on State Route 299 between post mile (PM) 38.29 and PM 39.498 in Modoc County. This project would include the installation of approximately 10,000-miles of broadband infrastructure throughout California within the State Highway System, including Interstate routes. Due to the varied topography and locations of the 10,000-mile broadband infrastructure across the State of California, the design would be dependent on project site features. Work would include the installation of subsurface broadband conduit and fiber, the installation of network repeater hubs at approximately 50-mile intervals, as well as the installation of vaults (Pull, Splice, and Buried) at various locations. All work will take place within 30-feet of highway rights-of-way except where not feasible. The areas of project impact in most areas will be limited to the existing paved surfaces, disturbed shoulders, and maintained Caltrans right-of-way. Purpose: This Middle-Mile Broadband Network project will install the broadband infrastructure along the State Highway System (SHS) necessary to connect to a third-party operated Last Mile Broadband Network which will bring internet connectivity to homes, businesses, and community institutions. Need: In July 2021, California Governor Gavin Newsom signed into law Senate Bill (SB) 156 to create an open-access middle-mile network to bring high-speed broadband service to all Californians. The lack of available middle-mile broadband infrastructure has been a major issue in connecting California’s communities. The statewide open-access middle-mile network included in SB 156 is a foundational investment to ensure every Californian has access to broadband Internet service that meets the connectivity needs of today, and well into the future. This project intends to support providing critical statewide broadband infrastructure to enhance access to and increase the affordability of high-speed internet for all Californians. Scope of Work Work within the existing Caltrans right-of-way would include the following: • Placement of temporary traffic control devices and signage. • Removal of minor vegetation. • Install approximately 6,200 linear feet of broadband conduit and fiber optic cable, generally consisting of two (2) 1 ½-inch high-density polyethylene (HDPE) ducts, with a minimum depth of cover of 48 inches. • 5-inch cased bore would be used to cross Caltrans roadways. • Installation of underground fiber optic cable. • Excavation of bore pits planned within project limits. Standard bore pits typically measure 3 feet wide by 5 feet long by 4 feet deep. o Dewatering within and adjacent to bore pits would occur as necessary, with water removed from the site. • Anticipated installation of four (4) standard poly/concrete vaults measuring 3 feet wide by 5 feet long by 3 feet deep. • Application of temporary and permanent erosion control, as needed.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
0411 Aq Hq Contract Augmented

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of buried fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work includes all labor, materials, supervision, and equipment necessary for staking, material coordination, property owner contacts, and right-of-way restoration. The project involves the installation of both contractor-provided 48-strand buried fiber optic cable and district-provided 48-strand all-dielectric fiber, starting from the Hoskins 345kV substation control building and proceeding to District structure 79. Bids are due by November 13, 2026, with an expected award date on or before November 25, 2026. The project must be completed by April 15, 2027. Qualified bidders must have completed at least three similar buried fiber optic installation projects within the last five years and must provide a safety program compliant with OSHA standards, including OSHA 300 and 300A reports from the last three years. Award decisions will be based on the best evaluated bid, considering factors such as quoted price, conformance with specifications, past performance, and general financial and technical qualifications. Contractors are required to maintain comprehensive insurance coverage, including Workers Compensation with a 500,000 dollar employers liability limit, Commercial General Liability with a 1,000,000 dollar per occurrence limit, and Automobile Liability with a 1,000,000 dollar combined single limit. Payments will be made within 30 calendar days of receipt of a proper invoice containing the contractor's Federal Taxpayer Identification Number and the district's 10-digit Purchase Order Number. Final acceptance of the work is contingent upon a district inspection to ensure all specifications and Rural Utilities Service material standards are met.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS