Cedar Street Improvement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cedar Street Improvement project in Monterey, California, involves the removal and installation of storm drains and the posting of trail signage along Cedar Street between Roosevelt Street and W Franklin Street, within the public right-of-way. The project is designed to enhance drainage functionality and pedestrian wayfinding while minimizing environmental impact, and it qualifies for a categorical exemption under the California Environmental Quality Act (CEQA) Guidelines, Section 15301, Class 1, as it constitutes a minor public infrastructure improvement with no significant effects on historical, archaeological, or sensitive environmental resources. All work is confined to previously disturbed areas, and no additional technical standards beyond CEQA compliance are specified. The City of Monterey serves as the lead agency, with Christy Sabdo, Principal Planner in Public Works, listed as the primary point of contact for project oversight. The project was posted as a forecast on December 22, 2025, indicating preliminary planning status, and no formal contract value, solicitation number, or procurement type has been established. There is no indication of a competitive bidding process, contract types such as FFP or IDIQ, or federal acquisition regulation clauses, as the initiative falls solely under state and municipal jurisdiction. No details regarding period of performance, delivery schedules, invoicing methods, payment offices, or contract administration roles such as COR or PCO are provided. The place of performance is confirmed as Monterey, CA, ZIP 93940, and while inspection and acceptance are implicitly expected at the project site, no formal criteria or responsible parties beyond the City are defined. No attachments beyond the CEQA exemption justification, packaging requirements, evaluation factors, offeror certifications, or special contract conditions are included, reflecting a streamlined, environmentally compliant municipal improvement effort without federal procurement structures.

General Info

Cedar Street storm drain and signage project in Monterey, CA, qualifies for CEQA exemption, no bid or contract value yet.

Agency

California → City of Monterey

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Monterey, CA, 93940

Set-Aside

NONE

Documents

(1)

NOE Cedar Street Improvement Project Monterey CA

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Monterey
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Monterey
Office AddressN/A
Contacts
Christy SabdoPrincipal Planner

Full Description

Show more
The project consists of removal and installation of storm drains, and posting trail signage.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details