This Government Contract opportunity from Department Of Defense was posted on October 7, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Chicago Harbor Lock Chamber Wall All Resurfacing Project, Chicago Harbor Lock, Chicago, IL

Awarded
W912P619B0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the Pennsauken Community Pool Improvements project, solicitation number 2026-BID-15. The scope of work involves the rehabilitation, construction, and general improvement of the community pool, including site clearing, reinforced concrete flooring and wall construction, sandblasting the pool interior, and the installation of shade structures and electrical conduits. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction and comply with the Americans with Disabilities Act of 1990. The contract will be awarded to the lowest qualified responsible bidder. Bids must be submitted electronically via the OpenGov Procurement Portal. Per Addendum #01, the submission deadline is November 10, 2026, at 10:30 AM, and submissions must include a signed Acknowledgment of Receipt of Changes. Required documentation includes a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, and a Public Works Contractor Registration Certificate. The contract period is one year, with a possible one-year extension. Awarded contractors must comply with the New Jersey Prevailing Wage Act, mandatory affirmative action language, and provide a two-year maintenance bond. Payment is processed through the Township's governing body meeting cycle, contingent upon the submission of certified payrolls and itemized invoices.
Procurement

POSTED

about 11 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by Volusia County, Florida, to restore beach access at Seaview Avenue in Daytona Beach following destruction by Hurricane Ian. The project scope includes the demolition of damaged infrastructure and the construction of a new reinforced and unreinforced concrete vehicular ramp, a pedestrian sidewalk, curbing, and a composite sheet pile bulkhead with a concrete cap. The estimated construction cost is 1,213,413.00 dollars, with bids due electronically by November 5, 2026. Award will be granted to the lowest responsive and responsible bidder based on price, verified references, and demonstrated experience with similar projects. The project is subject to strict regulatory and technical requirements, including a Florida Department of Environmental Protection coastal construction permit that mandates specific protections for turtle nesting and lighting restrictions. Contractors must comply with FDOT traffic control standards, OSHA safety regulations, and federal provisions including the Davis-Bacon Act and E-Verify. Required deliverables include a payment and performance bond, comprehensive insurance coverage, and an as-built survey. Contract administration involves a 30-day payment cycle for undisputed invoices and a specific sales tax exemption procedure for materials. The County maintains the right to inspect all finished work, providing the contractor 20 days to remedy any punch list items before final acceptance.
Coastal

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Chicago Harbor Lock Chamber Wall All Resurfacing Project, solicitation W912P619B0021, is a construction effort managed by the U.S. Army Corps of Engineers, Chicago District. The project focuses on repairing deterioration caused by vessel wear and freeze-thaw cycles by resurfacing the lock chamber walls with steel armor plate panels. This acquisition is restricted to small business concerns under NAICS code 237990, with an estimated project value ranging between 5 million and 10 million dollars. The scope of work includes lock wall demolition, cofferdam and dewatering operations, and the installation of steel wall panels utilizing a specific coating system. According to the final amendments, the performance completion date is established as April 14, 2022. The contract includes detailed price and payment procedures for mobilization and demobilization across construction seasons, as well as technical specifications regarding armor plate thickness and drilling requirements.

General Info

Contract Value

$2,394,767.97

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Chicago Harbor Lock, Chicago, IL, IL, USA

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment 0001 - W912P619B0021 Chicago Lock Chamber Walls Resurfacing

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912P619B0021 - Chicago Harbor Lock Chamber Wall Resurfacing

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation W912P619B0021 - Chicago Lock Chamber Walls Resurfacing

PDF, High priority: read this firstamendment
High

Amendment 0004 - Chicago Lock Chambers Wall Resurfacing (W912P619B0021)

PDF, High priority: read this firstamendment
High

Amendment 0005 - W912P619B0021 Chicago Lock Chambers Wall Resurfacing

PDF, High priority: read this firstamendment
High

Amendment 0006 - W912P619B0021 - Chicago Lock Wall Chambers Resurfacing

PDF, High priority: read this firstamendment
High

Chicago Harbor Lock Chamber Wall Repair - Price and Payment Procedures (AMD 0003)

PDF, High priority: read this firstspecifications
High

Chicago Lock Chamber Wall Repair - Plans

PDF, High priority: read this firstspecifications
High

W912P619B0021 Chicago Harbor Lock Chamber Wall Resurfacing Project

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

10 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Sep 12, 2019 to Sep 24, 2019. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Chicago
Contacts2 people available
OfficeCHICAGO, IL, 60604-1437, USA
Office AddressCHICAGO, IL, 60604-1437, USA
Contacts
Annette.H. LakesContract Specialist
Regina G. BlairChief, Contracting Branch

Full Description

Show more
As the Contracting Chief for the Chicago District Office, I am advancing the USACE's responses to Contractor's questions. Please be mindful, the below questions and responses will be captured via an impending amendment that will be issued today, 23 Sept 2019. The amendment will also extend the Bid Opening date to 26 Sep 2019. Regina G. Blair Contracting Chief - USACE, Chicago District Question 1: Drawing S-102 Elevation A1 has a note for an expanded detail A1 on drawing S-509. There is not a drawing S-509 in the set. I think the intent might be drawing S-503 , please clarify. USACE RESPONSE 1: "The correct detail number is A1 on S-503. " 2. Question 2: Drawing S-503 shows the elevation of a typical Armor Plate / Ladder elevation and details. However no details are provided for the connection between the existing ladder and the proposed ladder. Please provide details for how this connection is to be made. USACE RESPONSE 2: "As shown on Sheet S-503, there is no special connection requirement for the existing ladder to the new steel ladder and armor plate. The armor plate of the ladder is to rest on the seat concrete as shown in detail B6, S-503. " QUESTION 3: Will shop and field welds need to be scanned ? USACE RESPONSE 3: "All weld inspection is per specification section 05 50 15 and AWS D1.1." FQUESTION 4:The Lock Wall Steel Ladder is noted as a separate pay item. Is the intent that the ladder steel be fabricated and grouted separately from the adjoining armor plates ? USACE RESPONSE 4: "Please see detail E6, sheet S-503, which indicates that the ladder steel and adjoining armor plates are connected and can be grouted together." QUESTION 5: Page 6 in Section 01 22 00 .00 10 paragraph 1.1 . 9 . 1 description for Cast In Place Concrete directs us to section 05 50 15 but there is no cast in place information in that specification. Please provide a cast in place specification. USACE RESPONSE 5: "Cast in place concrete is provided in specification section 03 30 53. Grouting for the armor plate is provided in specification section 05 50 15." QUESTION 6: How is the existing top of lock corner armor anchored / embedded into the concrete? This has to be removed under this contract however the reference drawings appear to only show radiused concrete. USACE RESPONSE 6: "Please see reference sheet R-106 for armor plate anchorage." QUESTION 7: "Priority Option Items" in 52.217-7 state that we cannot commence work for Priority X items until its full completion of Priority X-1 Option work. Does this include armor plate fabrication? USACE RESPONSE 7: SEE AMENDMENT NO. 0002 QUESTION 8: 01 57 20.01 03 3.3.1 states that the effluent from cofferdam dewatering operations cannot be discharged into Lake Michigan. Please confirm that the lock chamber is not "Lake Michigan" in this instance. USACE RESPONE 8: "The Contractor shall discharge the effluent to the Chicago River side of the lock chamber. The effluent is NOT to be discharged to Lake Michigan or the lock chamber. By way of amendment 3, section 01 57 20.01 03 and paragraph 3.3.1 will include a statement for clarification" QUESTION 9: Will cofferdam dewatering effluent be allowed to be pumped directly into the river / lock chamber or does a settling basing need to be constructed? If there is a need for this basin, will it be allowed to be constructed on shore in the immediate facility of the work being performed? USACE RESPONSE 9: "In accordance to Section 01 57 20.01 03, paragraph 1.7.3 -p, the Contractor needs to submit a detailed waste water management plan that shows the details (such as the design, size, and location) of the proposed settling basin". QUESTION 10: SD-301 Note #2 states that "all cofferdams must be designed, as a minimum, for an ice load of 5k/lf". Due to specified ice flushing, there will not be any instance where the cofferdam is subject to an ice load of this magnitude. Please delete this requirement and insert verbiage stating that any ice loading will either be designed for by the Contractor or preventative measures taken to prevent ice loading. Structural USACE RESPONSE 10: "The cofferdam is to be designed for a 5 kip/ft ice load as indicated in note 2 on sheet SD-301." QUESTION 11: If care is taken to preserve the existing finish of the existing bollards, will the USACE not require them to be painted (called for in 09 97 02)? Structural USACE RESPONSE 11: "All bollards are to be painted yellow IAW Specification section 09 97 02" QUESTION 12: 6. S-504 states to paint the exposed hook concrete safety yellow. Will each of the coats of System 5-E-Z be applicable to coating this concrete? Structural USACE RESPONSE 12: "As indicated in the table in paragraph 3.5 of Specification 09 97 02, the concrete only is to receive yellow top coats." QUESTION 13: Can the horizontal portions of the lock wall be removed and replace in one continuous operation or is this horizontal portion governed by the "1 at a time" or "hopscotch" requirement of the vertical portions of the wall? Structural USACE RESPONSE 13: "Please see note 5 on sheet SD-301. The "Hop scotch" requirement applies only to the lock wall concrete." QUESTION 14: If no active heating is in process, will the Contractor still be required to inspect the cold weather protection "once per day on non-work days"? Structural USACE RESPONSE 14: "As per paragraph 3.2.1 of Specification section 03 30 53, the Contractor must inspect cold weather protection systems once per shift and once per day. This include any cold weather protection systems and heating systems." QUESTION 15: It does not appear to be required to field paint the reused cleats. Is this accurate? Structural USACE RESPONSE 15: "Correct, no requirement exists to paint re-used cleats." QUESTION 16: Will additional holes be allowed in the armor plates to anchor the strongbacks required by 05 50 15 3.3 ? USACE RESPONSE 16: "Please see SD-301, note 10. Anchoring to the newly installed armor panels is not allowed." QUESTION 17: It appears that the existing handrail is both of the anchored flange and grouted in a cored hole variety. Please provide as-builts or denotation where each section starts / ends. Structural USACE RESPONSE 17: "The as-built quantity of the types of handrails is not available but should be replaced in kind as shown on S-102 to S-105." QUESTION 18: It appears that there are locations in the scope of work where the horizontal portion of the lock wall ramps up to be higher than the top of armor plate. Will this ramp need to be removed prior to the 6" of removal required on A3 of S-501 or does the 6" start from the top of the existing surface - whether it is a ramp or not? Further, provide concurrence that the armor is installed horizontal and not ramped up to meet this ramp. Structural USACE RESPONSE 18: "The ramp in front of the control building is not to be removed or replaced. The 6" removal line for the horizontal concrete is from Elevation 586.0 as shown on SD-301."

More opportunities from Department Of Defense → W072 Endist Chicago

Same awarding agency

NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
Power and Communication Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details
NAICS: 236220
Federal
PRESOLICITATION NOTICE FOR GATE HOIST MACHINERY PAINTING AND HOIST HOUSE REHABILITATION FOR FOX RIVER DAMS, WISCONSIN
Solicitation # W912P626BA026
The U.S. Army Corps of Engineers Chicago District is preparing to solicit a contract for the repainting of gate hoisting machinery and the rehabilitation of hoist houses across nine dams on the Fox River in Wisconsin, including Kaukauna, Little Chute, Cedars, Appleton Lower, Menasha, Appleton Upper, DePere, Little Kaukauna, and Rapid Croche Dams. The scope of work includes surface preparation and painting of all gate hoisting equipment as well as comprehensive structural upgrades to each hoist house such as replacing shingle roofing with metallic sheet roofing, installing heavy duty commercial doors with modified framing, swapping exterior vinyl siding for galvalume, renewing soffit and fascia, and adding insulation to ceiling and wall cavities. All work must comply with USACE EM 385-1-1 safety and construction standards, and the contract will be executed under a single-year performance period beginning after award. This acquisition is strictly reserved for small business concerns as defined by the North American Industry Classification System code 236220, with a size standard of $45 million in annual receipts. Interested vendors must be actively registered in the System for Award Management (SAM) at the time of proposal submission and must also register in the DoD’s Procurement Integrated Enterprise Environment (PIEE) system to access the official solicitation, which will be released in the fourth quarter of fiscal year 2026. Proposals submitted via telephone, fax, or email will not be accepted. All correspondence must reference the solicitation number W912P626BA026, and inquiries should be directed to the primary point of contact, Ericka Hillard. Contractors are encouraged to review the USACE Contract Changes Playbook for guidance on equitable adjustments and change order processes under the contract.
Commercial and Institutional Building Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS