Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City Attorney Office (CAO) Refresh & Renovation Project

Closed
8179State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc. for the installation of emergency shut-off switches on power tools within the Facility Engineering Storage/Maintenance Shop in Edinburgh, Indiana. The scope of work requires the provision and installation of two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with OSHA, EPA, and FNC guidelines, as well as state and local Indiana codes, which prevail if more stringent than federal regulations. The contract will be awarded based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and a valid Indiana Contractor's License. A mandatory site visit was scheduled for November 10, 2026, with a response deadline of November 20, 2026. Key administrative requirements include Net 30 payment terms and strict adherence to Davis-Bacon Act wage rates. Contractors must provide proof of automobile liability, general liability, and workers compensation insurance, naming Adams and Associates, Inc. and Atterbury Job Corps Center as additional insureds. Final payment is contingent upon the submission of a completed SF 1413, certified payroll records, and a release of liens. Workmanship is guaranteed for one year following the acknowledgment of substantial completion.
Atterbury Job Corps. – Adams & Associates

POSTED

about 1 hour ago

DEADLINE

in 2 days
NAICS: 238210
New
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to install code-compliant emergency and exit lighting at its center in Minot, North Dakota. The project focuses on correcting deficiencies identified in the 2026 Facility Survey, specifically within the mechanical and electrical rooms of Building 26 (Female Dormitory) and Building 27 (Single Parent Dormitory). The scope of work requires the contractor to provide all labor, materials, and supervision to install LED emergency/exit light fixtures and directional markings in accordance with NFPA 70 (National Electrical Code) and NFPA 101 (Life Safety Code). This solicitation is set aside for Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Bidders must submit a detailed, itemized quotation using the provided bid sheet, along with a current insurance certificate and any applicable state or trade licenses. Compliance with the Davis-Bacon Act regarding prevailing wages and fringe benefits is mandatory. A bond is required for any proposal exceeding 150,000 dollars. Proposals must be submitted to Leana Leavitt by December 4, 2026, at 4:00pm CST, with a scheduled site walk-through on November 23, 2026. Payment terms are Net 30 following service verification and invoice receipt.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 1 hour ago

DEADLINE

in 17 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work includes performing visual and infrared thermographic inspections on energized transformers, installing standardized external oil sampling devices to eliminate the need for internal compartment access, and conducting comprehensive oil testing analysis. Additionally, the contractor is responsible for evaluating nitrogen blanket systems, ensuring positive pressure to prevent oxidation, and installing corrosion-resistant nitrogen pressure gauges readable from ground level. Key deliverables include annotated infrared images, written condition assessment reports with severity classifications, standard operating procedures, and on-site training for up to 20 agency staff members. This is a fixed-pricing contract with a not-to-exceed total price to be quoted by the offeror. The agency intends to make a single award to the most capable and cost-effective respondent. Proposals must be submitted electronically via PlanetBids by December 23, 2026, at 3:00 pm. Qualified contractors must adhere to ASNT Level 1 thermography certification, ASTM D923 sampling standards, and NFPA 70E safety protocols. Required submission documents include a detailed project approach, a company profile, three references from the last five years, and various certifications including a non-collusion statement and workers compensation certificate. Payment is processed monthly via ACH, with expedited payment options available for those offering specific invoice discounts.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems across the facility, specifically targeting deficiencies in the cafeteria, recreation, education, and dorm buildings. Key requirements include performing functional tests by simulating utility outages, applying durable tracking labels to fixtures, integrating maintenance schedules into the operator's Computerized Maintenance Management System, and adhering to NFPA 101 and NFPA 70 standards. The estimated contract value ranges from $25,000 to $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond equal to 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. The award will be based on overall best value. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, FAR safety and overtime standards, and the submission of a UEI number and SF 1413 form. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 14 days
NAICS: 238210
New
Joliet Job Corps- Replacement of Water Damaged Transformer
Solicitation # joliet-job-corps-replacement-water-damaged-transformer
Management & Training Corporation is seeking a subcontractor for a fixed-price, single lump sum project to replace a water-damaged 30KVA, 480V primary, 120/208V secondary transformer at the Joliet Job Corps center in Illinois. The scope of work includes coordinating electrical outages, implementing OSHA-compliant lockout/tagout procedures, removing and disposing of the damaged unit, and installing a new transformer on a structurally adequate elevated support platform anchored to the building. The estimated price range for this effort is between 0 and 25,000 dollars. All work must adhere to the National Electrical Code, OSHA regulations, and local building codes, with a requirement for the contractor to provide all necessary equipment and circuit identification labels and remove all debris upon completion. Bids are due by November 25, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form along with a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bidding. Award decisions will be based on overall best value and bidder responsiveness. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent and Performance and Payment Bonds from a surety with at least an A- rating are required. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wage rates and the submission of weekly certified payroll reports. Once a Notice to Proceed is issued, the contractor must complete the work within 60 consecutive business days, or face liquidated damages of 100 dollars per calendar day.
Joliet Job Corps

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 238210
New
SLED
Unit Price Construction: Districtwide Marquee Sign And Scoreboard Installation, Repair, And Replacement
Solicitation # 26/27-0018
The Fontana Unified School District is soliciting bids for a unit price construction contract for the installation, repair, and replacement of electronic marquee signs and athletic scoreboards across its campuses and administrative facilities. The primary objective is to establish consistent equipment standards using high-quality, durable signs manufactured and assembled in the United States, with a strict prohibition on components manufactured in China. The contract includes a construction cost estimate of 1,300,000.00 dollars and features an initial one-year term with up to four optional one-year renewals. Key requirements include a 48-hour warranty response commitment and the maintenance of a California-based service facility with available technicians and parts. Award decisions are based on the lowest responsible and responsive bidder, calculated by the sum of the base bid and a ten percent unidentified conditions allowance. Bidders must provide comprehensive unit pricing for various marquee sizes and configurations, ranging from 3ft x 6ft to 6ft x 12ft, in freestanding single, double, and wall-mounted options. Compliance with California building and electrical codes, the Federal Davis-Bacon Act, and prevailing wage laws is mandatory. Furthermore, the contractor must provide 100 percent performance and payment bonds issued by a California admitted surety and undergo criminal background checks for all employees to ensure student safety.
Purchasing Department

POSTED

about 1 hour ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The City Attorney Office (CAO) Refresh & Renovation Project involves a comprehensive renovation encompassing multiple phases. The initial phases focus on upgrading the flooring and painting within the office, including demolition of existing materials, installation of new flooring and baseboards, and painting walls with priming and two coats of Sherwin Williams paint. During this process, the contractor must ensure the protection of existing furniture and equipment, carefully remove and store wall-mounted items for reinstallation, and manage dust control, cleaning, and waste removal effectively. The later phase centers on the Multi-Purpose Room, involving demolition of existing walls, framing new walls with recessed door openings, and executing electrical work such as installing new receptacles and circuits. This phase also includes drywall installation, flooring, ceiling tiles, door hardware, wall and ceiling painting, seismic bracing, and temporary lighting setup, with all work detailed further in the scope of work document. The project is set to be awarded under a solicitation posted by the City of Riverside, California, with a contract value estimated between $250,000 and $500,000. The solicitation was posted on April 25, 2025, with a response deadline of May 16, 2025. The project falls under NAICS code 238210, indicating a specialty in building finishing contractors, and is managed by the California State Local Economic Development (SLED) organization. Additional detailed specifications and requirements are outlined in the referenced scope of work document available through the provided portal link.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FRSMP277009/JLM-Lighting Phase 2Open now, due in 16 days
  • 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 24, 2024 to May 16, 2025. The notice title changed. NAICS code added: 238210. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of Project. The scope of work for the City Attorney Office (CAO) Refresh & Renovation Project consists of the following phases:Phase 1-3 - Painting and Flooring Projecti. Demolition of existing flooring and preparation of subfloor.ii. Installation of new flooring, including baseboards.iii. Painting of walls, including priming and applying two coats of Sherwin Williams paint.iv. Protection of existing furniture and office equipment during construction.v. Careful removal and storage of wall-mounted items, with reinstallation after construction.vi. The contractor is responsible for dust control, cleaning, and waste removal.Phase 4 - Multi-Purpose Roomi. Demolition of existing walls and framing of a new wall with a recessed door opening.ii. Electrical work, including installation of new receptacles and circuits.iii. Installation of drywall, flooring, and ceiling tiles.iv. Door installation, including all necessary hardware and finishes.v. Adjustments to the T-bar and painting of walls and ceiling.vi. Seismic bracing of walls and installation of necessary temporary lighting.For detailed and additional specifications, See “Exhibit A Scope of Work”.

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
New
SLED
Riverside Police Department Headquarters
Solicitation # 8303
The City of Riverside is soliciting bids for the Riverside Police Department Headquarters project, specifically focusing on the 11th Street Site Utilities relocation. This solicitation, identified as Bid 8303, is open for responses until December 11, 2026. The contract will be awarded to the lowest responsive and responsible bidder who holds a valid California contractor's license. A specific allowance of 50,000 dollars is noted for the site utilities portion of the work. The scope of work involves site utility relocation, requiring the submission of shop drawings for prefabricated components and electronic maintenance manuals. Contractors must adhere to strict waste management standards, recycling 100 percent of cardboard, plastic, polystyrene, wood crates, and plastic pails. Performance is triggered by a Notice to Proceed, after which the contractor has ten calendar days to submit manpower loading and procurement lead times. Bidders must submit their proposals via the City's bidding website, including a bid bond or cashier's check for at least 10 percent of the proposal amount. Mandatory documentation includes a non-collusion declaration, an Iran affidavit, and workers' compensation certifications. The contractor is also required to provide payment and performance bonds, comply with the Americans with Disabilities Act, and complete a Disabled Veteran Business Enterprise close-out statement. Inspections will be conducted on-site by the agency having authority, with the contractor required to provide two working days' notice prior to scheduling.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 24 days
View Details
NAICS: 237110
SLED
Water Well Rehabilitation Program Fy2026/2027
Solicitation # RPU-8298
Solicitation RPU-8298 is a project for the City of Riverside Public Utilities Department focused on the rehabilitation, redevelopment, and testing of the Thorne 12 potable water well in San Bernardino, California. The scope of work includes brushing, bailing, air lifting, video surveys, cleaning, chemical treatment, and redevelopment. The contractor is responsible for furnishing and installing a new motor-driven, oil-lubricated line-shaft, tube, column, vertical turbine pump unit and appurtenances, as well as performing motor inspections and repairs. Specialized requirements include spinner, gyroscopic, and caliper surveys, water quality testing for Title 22, PFOA/PFOS, and coliform/HPC analysis, and the installation of a removable permanent shade structure over the pump motor. Additionally, the contractor must utilize CIPO Cloud Construction Management Software for project management. The contract will be awarded to the lowest responsive and responsible bidder who completes all portions of Bid Schedule A. Bidders must hold a current C-57 contractor license and submit all proposals electronically by November 20, 2026. The project has a total performance period of 300 calendar days, with a specific 120-day window for the completion of well rehabilitation. Requirements include providing performance and payment bonds for 100 percent of the contract price, adhering to California prevailing wage rates, and complying with NPDES discharge permits. Payment is processed via progress applications consisting of invoices, schedules of values, and certified payroll records, with the City paying undisputed requests within 30 days.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS