Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

General Requirements & Project Coordination

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Riverside, CA, 92501, USA

Set-Aside

NONE

Documents

This scope was carved out of 8303.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Riverside Police Department Headquarters

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 25 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom Riverside Police Department Headquarters
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides administrative and coordination services for prime contractors on City of Riverside public works projects. Manages electronic document control, schedules of values, daily reports, and payment applications. Maintains current as-built drawings and annotated specifications. Delivers daily reports, updated schedules of values, and certified as-built drawings.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Design Services For Water Well No. 30 Rehabilitation
Solicitation # UH26004
The City of Stockton is soliciting professional engineering services for the Water Well No. 30 Rehabilitation Project located in Lodi, California. The primary objective of this project is to ensure that water quality meets all Title 22 drinking water quality standards while maintaining a well capacity of approximately 2,000 gallons per minute. The scope of work includes the development of a Preliminary Design Report that identifies treatment options for 1,2,3-TCP and provides a 10-year capital and O&M cost analysis, the creation of full construction documents, the preparation of water system permit amendment applications, and the provision of engineering support during the bidding process. Proposals are due by December 3, 2026, and must be submitted to the Office of the City Clerk in Stockton. The submission must include one original with wet ink signatures, three copies, and a USB containing an electronic version, with the fee proposal submitted in a separate sealed envelope and a passcode-protected file on the USB. The City will use a ranking process to select the most qualified consultant, evaluating proposals based on technical merit before reviewing cost proposals. Selected contractors must comply with prevailing wage requirements, ADA standards, and non-discrimination laws, and must provide a Certification of Financial Condition to ensure financial soundness and tax compliance. Payment for services is processed within 30 days of receiving an approved invoice.
City of Stockton

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
Thornton Road And Don Avenue Sewer Pump Stations Rehabilitation
Solicitation # UW13009
The City of Stockton Municipal Utilities Department is soliciting design services for the rehabilitation of the Thornton Road and Don Avenue Sewer Pump Stations. The project aims to improve system reliability and minimize failures by updating outdated electrical and mechanical systems and addressing operational concerns. The scope of work includes performing investigations, hydraulic, mechanical, and electrical evaluations, and developing comprehensive rehabilitation recommendations. Key tasks are divided into project management, existing conditions investigation and preliminary engineering, and the creation of design and bid documents. Award selection is based on the firm best qualified for the project, with specific scoring preferences granted to local businesses: 5% for City of Stockton businesses, 2% for San Joaquin County businesses, and 1% for subconsultants within the city. Proposals must adhere to strict formatting guidelines, including a 40-page total limit and a 30-page limit for the body, with a minimum 10-point font. Technical proposals must be submitted on white paper with wet ink signatures, while proposal fees and the list of tasks must be submitted in a separate sealed envelope. Contract administration requires that invoices include a description of work, time spent, and a City reference number, with payments processed within 30 days of receipt subject to City Council appropriations. The contractor is responsible for maintaining safety, implementing dust control, and preparing a Stormwater Pollution Prevention Plan to comply with state and local regulations. Additionally, the successful proponent must provide a certification of financial condition and adhere to prevailing wage and non-discrimination requirements.
City of Stockton

POSTED

about 6 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
SLED
5671 Medical Center La Jolla (MCLJ) Outpatient Pavillion Geotechnical Testing And Inspection Services
Solicitation # 20261113029
The University of California San Diego is soliciting a Geotechnical Testing and Inspection Services firm for the 5671 Medical Center La Jolla Outpatient Pavilion. This project involves the construction of an approximately 180,000 gross square foot HCAi/OSHPD 3 compliant facility designed to LEED Gold standards. The selected firm will be responsible for geotechnical testing and inspection across various construction phases, including earthwork, shoring, foundations, flatwork, utility installation, and site work. Key deliverables include the review of construction documentation for site excavation and grading, as well as verifying that all earthwork and backfill align with approved drawings and geotechnical recommendations. Design review services may begin as early as December 2026, with the project breaking ground in January 2027 and reaching completion by September 2029. Selection is based on proven capabilities, staff qualifications, and a requirement that the firm and its testing lab be located within 30 miles of the project site. Applicants must submit a proposal limited to 25 pages, including a letter of interest, a response to selection criteria, and a fee estimate based on current prevailing wage criteria and a 40-hour work week. The University will only contract with a single executive design professional entity, excluding joint ventures or associations. All services will be governed by the standard University Professional Services Agreement, and shortlisted firms must sign a Statement of Understanding regarding these terms. Proposals are due by November 18, 2026, and the selection process includes a mandatory interview.
University of California San Diego

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
New
SLED
Riverside Police Department Headquarters
Solicitation # 8303
The City of Riverside is soliciting bids for the Riverside Police Department Headquarters project, specifically focusing on the 11th Street Site Utilities relocation. This solicitation, identified as Bid 8303, is open for responses until December 11, 2026. The contract will be awarded to the lowest responsive and responsible bidder who holds a valid California contractor's license. A specific allowance of 50,000 dollars is noted for the site utilities portion of the work. The scope of work involves site utility relocation, requiring the submission of shop drawings for prefabricated components and electronic maintenance manuals. Contractors must adhere to strict waste management standards, recycling 100 percent of cardboard, plastic, polystyrene, wood crates, and plastic pails. Performance is triggered by a Notice to Proceed, after which the contractor has ten calendar days to submit manpower loading and procurement lead times. Bidders must submit their proposals via the City's bidding website, including a bid bond or cashier's check for at least 10 percent of the proposal amount. Mandatory documentation includes a non-collusion declaration, an Iran affidavit, and workers' compensation certifications. The contractor is also required to provide payment and performance bonds, comply with the Americans with Disabilities Act, and complete a Disabled Veteran Business Enterprise close-out statement. Inspections will be conducted on-site by the agency having authority, with the contractor required to provide two working days' notice prior to scheduling.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 25 days
View Details
NAICS: 237110
SLED
Water Well Rehabilitation Program Fy2026/2027
Solicitation # RPU-8298
Solicitation RPU-8298 is a project for the City of Riverside Public Utilities Department focused on the rehabilitation, redevelopment, and testing of the Thorne 12 potable water well in San Bernardino, California. The scope of work includes brushing, bailing, air lifting, video surveys, cleaning, chemical treatment, and redevelopment. The contractor is responsible for furnishing and installing a new motor-driven, oil-lubricated line-shaft, tube, column, vertical turbine pump unit and appurtenances, as well as performing motor inspections and repairs. Specialized requirements include spinner, gyroscopic, and caliper surveys, water quality testing for Title 22, PFOA/PFOS, and coliform/HPC analysis, and the installation of a removable permanent shade structure over the pump motor. Additionally, the contractor must utilize CIPO Cloud Construction Management Software for project management. The contract will be awarded to the lowest responsive and responsible bidder who completes all portions of Bid Schedule A. Bidders must hold a current C-57 contractor license and submit all proposals electronically by November 20, 2026. The project has a total performance period of 300 calendar days, with a specific 120-day window for the completion of well rehabilitation. Requirements include providing performance and payment bonds for 100 percent of the contract price, adhering to California prevailing wage rates, and complying with NPDES discharge permits. Payment is processed via progress applications consisting of invoices, schedules of values, and certified payroll records, with the City paying undisputed requests within 30 days.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
SLED
Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal
Solicitation # RPU-8289
The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.
Water and Sewer Line and Related Structures Construction

POSTED

27 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS