Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Riverside Police Department Headquarters

Open
8303State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Riverside is soliciting bids for the Riverside Police Department Headquarters project, specifically focusing on the 11th Street Site Utilities relocation. This solicitation, identified as Bid 8303, is open for responses until December 11, 2026. The contract will be awarded to the lowest responsive and responsible bidder who holds a valid California contractor's license. A specific allowance of 50,000 dollars is noted for the site utilities portion of the work. The scope of work involves site utility relocation, requiring the submission of shop drawings for prefabricated components and electronic maintenance manuals. Contractors must adhere to strict waste management standards, recycling 100 percent of cardboard, plastic, polystyrene, wood crates, and plastic pails. Performance is triggered by a Notice to Proceed, after which the contractor has ten calendar days to submit manpower loading and procurement lead times. Bidders must submit their proposals via the City's bidding website, including a bid bond or cashier's check for at least 10 percent of the proposal amount. Mandatory documentation includes a non-collusion declaration, an Iran affidavit, and workers' compensation certifications. The contractor is also required to provide payment and performance bonds, comply with the Americans with Disabilities Act, and complete a Disabled Veteran Business Enterprise close-out statement. Inspections will be conducted on-site by the agency having authority, with the contractor required to provide two working days' notice prior to scheduling.

General Info

Bids for Riverside Police Department site utility relocation due by December 11, 2026.

Place of Performance

Riverside, CA, 92501, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this firstbid-schedule
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High

Read all 5 documents

Due in 25 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 25 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 5 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kristan Nordmeyer

Full Description

Show more
Bid #8303: $2e

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Bonniebrook Water Service Lateral Reconnection
Solicitation # UH21004
The City of Stockton is soliciting bids for the Bonniebrook Water Service Lateral Reconnection project (UH21004), which involves the installation of approximately 300 linear feet of 1-inch potable water service lines using Horizontal Directional Drilling (HDD). The scope of work covers six residential homes along Bonniebrook Drive, between Woodside Drive and Fernvale Drive, in Stockton, California. The contractor is responsible for all labor, materials, and equipment required to extend service lines from new water meter boxes in residential front yards to existing potable water systems. Key deliverables include HDD installation, residential service transfer, capping and abandoning existing services, testing, flushing, disinfection, commissioning, and final surface restoration and cleanup. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of the base bid and any selected alternates. Bidders must submit sealed envelopes containing official bid documents, a non-collusion declaration, and bid security. The successful contractor must provide both a Faithful Performance Bond and a Labor and Materials Bond, each for 100 percent of the contract bid price, issued by a company authorized in the State of California. Additionally, the contractor must adhere to prevailing wage rates and Title VI non-discrimination requirements. All work and materials are subject to inspection by the Construction Manager, and no work may be concealed without prior approval. Materials must be stored according to manufacturer instructions and hazardous materials must be handled in accordance with Material Safety Data Sheets and federal, state, and local regulations.
City of Stockton

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
SLED
Water Well Rehabilitation Program Fy2026/2027
Solicitation # RPU-8298
Solicitation RPU-8298 is a project for the City of Riverside Public Utilities Department focused on the rehabilitation, redevelopment, and testing of the Thorne 12 potable water well in San Bernardino, California. The scope of work includes brushing, bailing, air lifting, video surveys, cleaning, chemical treatment, and redevelopment. The contractor is responsible for furnishing and installing a new motor-driven, oil-lubricated line-shaft, tube, column, vertical turbine pump unit and appurtenances, as well as performing motor inspections and repairs. Specialized requirements include spinner, gyroscopic, and caliper surveys, water quality testing for Title 22, PFOA/PFOS, and coliform/HPC analysis, and the installation of a removable permanent shade structure over the pump motor. Additionally, the contractor must utilize CIPO Cloud Construction Management Software for project management. The contract will be awarded to the lowest responsive and responsible bidder who completes all portions of Bid Schedule A. Bidders must hold a current C-57 contractor license and submit all proposals electronically by November 20, 2026. The project has a total performance period of 300 calendar days, with a specific 120-day window for the completion of well rehabilitation. Requirements include providing performance and payment bonds for 100 percent of the contract price, adhering to California prevailing wage rates, and complying with NPDES discharge permits. Payment is processed via progress applications consisting of invoices, schedules of values, and certified payroll records, with the City paying undisputed requests within 30 days.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
SLED
Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal
Solicitation # RPU-8289
The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.
Water and Sewer Line and Related Structures Construction

POSTED

27 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS