Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Citywide Water Main Replacement Phase 2

Active
2026-NIBCONST-580State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Citywide Water Main Replacement Phase 2 project, solicitation number 2026-NIBCONST-580, is issued by the Public Works agency for the City of Prescott, Arizona. The project focuses on replacing existing water mains of various diameters and materials that date back to the early 1960s, while also rebuilding roads that are currently in poor condition. The solicitation was posted on August 28, 2026, with a response deadline of October 1, 2026. Primary contact for the project is Capital Project Manager Stephen Stanley. The contract is governed by the City of Prescott Construction Contract and is supplemented by the 2019 City of Prescott Supplement to the MAG Uniform Standard Specifications, which provides detailed technical guidance on earthwork, streets, and traffic control. Because the project involves water infrastructure, it must comply with strict domestic sourcing mandates, including the American Iron and Steel requirements and the Buy America preference implementation guidance from OMB Memorandum M-22-11. These regulations require that iron, steel, and manufactured construction materials be produced in the United States to support domestic supply chains.

General Info

City of Prescott water main replacement and road rebuilding project due October 1, 2026.

Agency

Arizona → Public WorksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

(10)

City of Prescott Supplement to MAG Uniform Standard Specifications - Technical Specifications Feb 14 2019

PDF132 pagesspecifications

OMB Memorandum M-22-11 on Buy America Preference Implementation Guidance

PDF17 pagesguidance-memorandum

CIP# 2210-002 Roadway Improvements & Water Main Replacement Plans

PDFsow

Phase 2 Street Improvements and Waterline Replacement Bid Form

PDF3 pagesbid-form

CIP 2210-002 Phase 2 Street & Water Main Improvements Special Provisions

PDF40 pagessow

American Iron and Steel Requirement Guidance - EPA March 20, 2014

PDF8 pagesguidance

CIP 2210-002 Final Engineer's Opinion of Probable Cost

PDF3 pagessow

City of Prescott Construction Contract

PDF15 pagescontract-document

Citywide Water Main Replacement Phase 2 - Notice Inviting Bids

PDF20 pagesifb

MAG Supplement Technical Specifications (Feb. 14, 2019)

PDF132 pagesspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Public Works
Contacts2 people available
OfficePrescott, AZ, 86301, USA
Organization / Agency
Arizona → Public Works
View Agency Profile
Office AddressPrescott, AZ, 86301, USA
Contacts
Stephen StanleyCapital Project Manager
Jaimie SventekContracts Coordinator

Interested Companies (42)

Show more
LJL Construction & Environmental
Chandler, AZ
ConstructConnect
Cincinnati, OH
Fann Contracting
Prescott, AZ

See All 42 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The existing watermains are constructed of various diameters and materials, dating back to the early 1960s. Some of the roads are in poor condition and will be rebuilt.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. The project requires the provision of all necessary labor, materials, transportation, tools, and equipment to deliver a complete and operational water transmission system, including final disinfection, startup, and commissioning. Issued by Garney Pacific, Inc. for the Jurupa Community Services District, this solicitation seeks subcontractor and supplier quotes by September 18, 2026, at 2:00 PM PT. The project is open to various set-aside categories, including Small Business, SDB, WOSB, HUBZone, DBE, and DVB. Key requirements for subcontractors include the mandatory use of union labor and the ability to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Requested trade scopes encompass a wide range of services, including traffic control, SWPPP monitoring, utility potholing, survey and staking, asphalt and concrete restoration, steel pipe welding, electrical and instrumentation, and materials testing.
Garney Pacific, Inc.

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of green infrastructure designed to treat 1.7 acres of impervious surface within a 3.3-acre drainage area. Key deliverables include the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants. The scope also encompasses necessary drainage, underdrain, inlet, pipe, and downspout work, along with ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, concluding with final stabilization and restoration. This solicitation specifically seeks subcontractors and suppliers from minority-owned, disadvantaged, and women-owned business enterprises, as well as other small business categories including HUBZone, veteran-owned, and service-disabled veteran-owned firms. Small businesses are encouraged to form consortiums if individual bid items exceed their capacity. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a formal response indicating their intent to bid.
Harbel, Inc.

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

1 day ago

DEADLINE

in 21 days
View Details

More opportunities from Arizona → Public Works

Same awarding agency

NAICS: 237110
New
SLED
South Tank Pipe Relining Project
Solicitation # 2026-NIBCONST-592
The City of Prescott is soliciting bids for the South Tank Pipe Relining Project, identified as solicitation 2026-NIBCONST-592. This project represents the second phase of a rehabilitation effort for a 5-million-gallon concrete reservoir constructed in the early 1990s. While the first phase addressed the interior shell and columns with epoxy coating, this phase focuses on resolving persistent leakage by performing trenchless rehabilitation and lining of the piping beneath the reservoir. The scope of work includes the exposure and cast-in-place pipe lining of two 24-inch inlet and outlet pipes located within a concrete vault, as well as the exposure and lining of two 8-inch drainpipes located in an earthen area. The contract is managed by the Public Works agency and requires a completion timeframe of 120 calendar days, with a strict requirement that the reservoir be returned to service by March 1, 2027. Bids must be submitted by October 1, 2026. The project is subject to the City of Prescott Supplement to MAG Uniform Standard Specifications and must comply with federal domestic procurement mandates, including the Buy America preference and American Iron and Steel requirements for federally funded water infrastructure. The agreement establishes the contractor as an independent entity and mandates that work commence within 10 days of notification.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS