CO NP BLCA 10(1) South Rim Drive
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The South Rim Drive Improvement project, solicitation 6982AF26Q000022, is a small business set-aside request for quote issued by the Federal Highway Administration for the restoration of roadside protection in Montrose County, Colorado. The project aims to address safety hazards caused by wildfires by removing existing boulder barriers and installing modern, crash-tested steel guardrail systems with specialized weathered-look finishes and Natina stain coatings across twelve distinct locations. The scope of work includes selective boulder removal, site grading, shoulder stabilization, and comprehensive traffic control, including one-lane closures and flagging. All work must adhere to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and include environmental compliance measures such as a Stormwater Pollution Prevention Plan. The government intends to award a single bilateral firm-fixed-price contract with an estimated value between $700,000 and $2,000,000. Award is based on a comparative evaluation of price, technical approach, and relevant experience. The project timeline is structured to accommodate an eight-week lead time for specialized materials, with a notice to proceed anticipated in mid-October 2026 and on-site construction scheduled from May 3, 2027, through a completion date of June 15, 2027. Key contract terms include liquidated damages of $2,500 per day, requirements for performance and payment bonds, and the use of the DOT DELPHI system for electronic invoicing.
General Info
Place of Performance
Montrose, CO, 81401, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This is a Request for Quote. Plans and specifications are available.
PROJECT NUMBER: CO NP BLCA 10(1)
PROJECT NAME: South Rim Drive Improvement
PROJECT DESCRIPTION:
The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons.
SCOPE OF THE WORK:
The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve (12) distinct locations along South Rim Drive.
Principal work elements include, but are not limited to, the following:
- Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries.
- Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement.
- Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings).
- Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors.
Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction.
To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway.
ANTICIPATED SCHEDULE:
- Advertisement: Mid-September 15, 2026
- Award: Mid-October 2026
- Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter)
- Construction: Early April 2027 – Late May 2027
ESTIMATED COST RANGE:
The estimated bid range for Schedule A is between $700,000 and $2,000,000.
More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS