Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Coachella Vault

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Coachella

Place of Performance

Harrison Street and Avenue 48, Coachella, CA, 92236

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Coachella
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Coachella
Office AddressN/A
Contacts
Adrian MorenoAssociate Planner
Nicole VannProject Manager

Interested Companies (1)

MSA ConsultingRancho Mirage, CA

Full Description

Show more
The Coachella Vault project is proposing the development of a storage facility and office/clubhouse located on approximately 11 acres in the City of Coachella. The site is formed by APN 603-290-005 east of Harrison Street and approximately 1,300 feet south of Avenue 48. The 11-acre property is currently vacant and undeveloped; however, the site has been previously disturbed and cleared of vegetation. Previous onsite disturbance is evident from the vehicle tracks onsite. The 11-acre site has a General Plan designation of Industrial District and is zoned Wrecking Yard (M-W). At buildout, the project will consist of an office/clubhouse, nine storage buildings, and an industrial lease space. The office/clubhouse will be two stories and 3,970 square feet (1,230 square feet first floor, 2,740 square feet second floor). The industrial space for lease will be 3,140 square feet. The storage buildings will range in size between 17,750 square feet and 34,650 square feet each, for a total building area of 225,230 square feet of storage space. In addition to the proposed buildings, development of the site would also include landscaping, street improvements, drive aisles, and parking. Access to the project will be provided from two entry points on Harrison Street. The project proposes a total of 272 parking spaces (3 ADA spaces, 64 surface parking spaces, and 205 spaces within the storage units). The project will also develop roof-top solar panels and associated electrical equipment (batteries and generator) to support the solar facilities.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
SLED
E & P Technology Way, Buildings A & B – Use Permits #P22-00307 & #P22-00308The E and P Technology Way project involves the development of two industrial buildings on approximately 20.07 acres within the Napa Valley Business Park in southern unincorporated Napa County, California. Building A is a 143,312-square-foot wine production facility designed for processing, storage, bottling, and accessory office use with an annual capacity of 450,000 gallons. Building B is a 66,915-square-foot warehouse and distribution center with accessory office space. The project includes the construction of truck loading areas, 211 parking spaces with electric vehicle charging, truck trailer parking, and internal circulation improvements. Infrastructure upgrades will include new driveways from Technology Way and Morris Court, as well as new sidewalks, curb and gutter improvements, and pavement upgrades along the project frontages. Managed by the County of Napa as the lead agency with FCS International, Inc. serving as the consulting firm, the project is currently in the environmental review phase. A Notice of Preparation was issued on October 1, 2026, to initiate a Draft Environmental Impact Report, with a public scoping meeting scheduled for October 21, 2026. The site will be supported by water services from the City of American Canyon and wastewater services from the Napa Sanitation District. Environmental and sustainability features include water-efficient landscaping and bioretention stormwater treatment facilities.
Napa County

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Department Of Commerce Nist

POSTED

4 days ago

DEADLINE

in 12 days
View Details
NAICS: 236210
New
SLED
3800 Via Oro Project
Solicitation # 2026030940
The 3800 Via Oro Project is a proposed redevelopment initiative by the City of Long Beach, California, involving the demolition of existing on-site structures, landscaping, and at-grade parking to make way for a speculative industrial complex. The project features a concrete tilt-up building of approximately 332,090 square feet designed for a mix of warehousing, manufacturing, and office uses. The structure will have a maximum height of 49 feet, include a mezzanine, and maintain a floor area ratio of 0.56. To comply with Long Beach Municipal Code, the building is intended to achieve LEED Silver Certification. The scope of work also encompasses comprehensive site improvements, including new utilities, infrastructure, lighting, signage, fencing, and landscaping. The project is undergoing a rigorous environmental and regulatory review process to ensure compliance with CEQA and local standards. This includes the preparation of an Environmental Impact Report and various technical assessments covering air quality, greenhouse gas emissions, acoustical impacts, vehicle miles traveled, and cultural and paleontological resources. Additional technical studies have been conducted regarding geotechnical stability, hydrology and hydraulics for stormwater management, and an arborist report for tree preservation and removal on the 13.8-acre site. Necessary approvals include CEQA clearance, Site Plan Review, a Tentative Parcel Map for parcel consolidation, and building permits from the City of Long Beach, with additional operational oversight from the South Coast Air Quality Management District and the Los Angeles Regional Water Quality Control Board.
City of Long Beach

POSTED

4 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS