Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cold Milling of Bituminous Pavement

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
FY 2027 Patching and Repair Project
Solicitation # PE-66204-NONST-2027-000000005
The FY 2027 Patching and Repair Project is a unit price contract issued by the City of Walnut Grove, Georgia, for asphalt patching and mill, patch, and inlay services. The scope of work includes providing all labor, materials, and equipment necessary for repairs at various locations, such as Greenhill Way, Valley Drive, Woodland Circle, and Walnut Court. Key technical requirements include the use of asphalt containing hydrated lime and adherence to GDOT 652 and 653 standards for striping and marking, as well as MUTCD Chapter 6 for temporary traffic control. The contract term is 180 calendar days from the notice to proceed, with a mobilization period of 60 business days. Work is restricted to between 7:00 AM and sundown on weekdays, with specific restrictions for residential areas on weekends and a total prohibition of work on Sundays and select holidays. The contract will be awarded to the lowest responsible bidder who is prequalified by the Georgia Department of Transportation. Bidders must submit a comprehensive proposal including a 5% bid bond, bidder qualifications, and proof of insurance. The successful contractor is required to provide a 100% performance-payment bond and a certificate of insurance naming the City of Walnut Grove as additionally insured within seven days of the award. Payments are processed monthly based on certified invoices for services performed and accepted. Final payment is contingent upon the submission of all test results, including cores and photo reports, and the completion of a final site cleanup.
City of Walnut Grove

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project
Solicitation # 2600030
The MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project is a construction solicitation issued by the City of Lawrence, Kansas, with a response deadline of October 13, 2026. The project focuses on street maintenance and reconstruction, featuring the installation of 8,000 square yards of concrete separated bike lanes, pavement reconstruction via milling and overlay, storm sewer improvements, and the replacement of sidewalks, including two blocks of 5-foot-wide sidewalk infill. Additional work includes improvements at the 19th and Mass Streets intersection and partial disturbance of a 16-foot-wide grass planter strip. Contractors must coordinate concurrent relocation efforts with AT&T and Black Hills Energy, who are permitted to operate within the contractor's temporary traffic control. The contract requires substantial completion within 340 calendar days and final completion within 365 calendar days of the Notice to Proceed. Bidders must provide an electronic bid bond of at least 5 percent of the bid amount and are subject to KDOT required documents, Davis-Bacon and Related Acts, and Buy America domestic steel requirements. Evaluation for award considers total cost, bidder location, and Disadvantaged Business Enterprise participation efforts. Technical standards include NEMA TS-1 for traffic signals and NSF 61 for potable water materials. Payment is structured through a mix of unit pricing and lump sum for demolition, with payments due within 30 days after completion. Final acceptance by the City is followed by a joint inspection 11 months later.
MSO - CMED

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
EMERGENCY CULVERT REPLACEMENT PROJECT¿ FOR THE UPSON COUNTY BOC - Rocky Bottom Road
Solicitation # PE-77031-NONST-2026-000000021
The Upson County Board of Commissioners is soliciting sealed bids for the Emergency Culvert Replacement Project on Rocky Bottom Road in Georgia. The scope of work involves two separate pipe crossings, specifically the demolition and replacement of approximately 60 linear feet of 84-inch corrugated metal pipe and 60 linear feet of 72-inch corrugated metal pipe, along with other improvements detailed in the project plans. All work must be completed within 45 consecutive calendar days following the receipt of the Notice to Proceed. Bidders must be properly licensed in the State of Georgia and comply with E-Verify requirements. A mandatory pre-bid conference is scheduled for September 22, 2026, at 10:00 AM at the Thomaston-Upson County Government Complex, with sealed bids due by 10:00 AM on October 6, 2026. Submission requirements include a bid bond of at least 5% of the base bid, while the successful contractor must provide performance and payment bonds each totaling 100% of the contract amount. Comprehensive insurance coverage is required, including general liability, commercial automobile liability, and worker's compensation, each with minimum limits of 1,000,000 dollars per occurrence or accident. The project is managed by Chris Brazell of EMC Engineering Services, Inc.
Upson County Board of Commissioners

POSTED

about 21 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

This contract involves the cold milling and removal of bituminous pavement at Fort Pierre, categorized into three layers for removal: surface layers up to 2 inches, layers between over 2 inches up to 4 inches, and full-depth reclamation for resurfacing purposes. It is designated as a complete small business set-aside under the SBA program, specifically targeting businesses eligible under FAR 19.5 guidelines. The work falls under NAICS code 237310, which pertains to highway, street, and bridge construction. The solicitation was posted on June 4, 2026, and responses are due by July 7, 2026, at 7:00 PM. The contracting agency overseeing this opportunity is the Department of Defense, specifically through the W071 Endist Omaha office. Although specific address details and a point of contact are not provided, all performance is expected at Fort Pierre. This subcontract opportunity is focused on specialized pavement milling services critical to road maintenance and infrastructure improvements in the area.

General Info

Cold milling and removal of pavement at Fort Pierre; SBA small business set-aside, due July 7, 2026.

Agency

Department Of Defense → W071 Endist OmahaView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Fort Pierre, SD, USA

Set-Aside

SBA

Documents

This scope was carved out of W9128F26BA019.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Oahe IDCC Road Maintenance 2026

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W071 Endist Omaha
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of asphalt surface in layers: ≤2", >2"–4", and full-depth reclamation for resurfacing.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 236220
New
Federal
Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for Other Transaction (OT) - Initial Minot Sentinel Beddown (IMSB), Minot Air Force Base, North Dakota (ND)
Solicitation # W9128F26SM025
The Initial Minot Sentinel Beddown (IMSB) project suite, managed by the USACE Omaha District, involves the construction of three primary facilities at Minot Air Force Base, North Dakota: a Consolidated Vehicle Maintenance Complex (CVMC), a Security Forces Operations Complex (SFOC) of approximately 130,000 square feet, and an Athletic Complex. This initiative supports the Ground Based Strategic Deterrent (GBSD) Sentinel Program and includes extensive site work such as paving, fencing, landscaping, utility expansions, and the demolition of building B425. The combined project suite magnitude is estimated between 200 million and 300 million dollars, with individual project values ranging from 2 million to 250 million dollars. Performance periods vary by facility, with the SFOC estimated at 1,440 calendar days and the Athletic Complex at 550 calendar days from the construction Notice to Proceed. The acquisition will be executed as a firm-fixed-price, Design-Bid-Build contract utilizing Other Transaction Authority under 10 U.S.C. Section 2808a. Selection will be based on a Qualifications Based Selection (QBS) process, evaluating white papers and pitch meetings rather than price. Key evaluation factors include the understanding of project objectives, collaboration approach under OTA, subcontractor retention strategies, risk mitigation, budget management, and relevant experience with complex DoD facilities. All construction must adhere to DoD Unified Facilities Criteria, including specific standards for building codes, antiterrorism, and cybersecurity. The current phase is a request for industry feedback on draft requirements and solicitations, with the official Request for Qualifications expected in October 2026.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Federal
Industry Day - Space Force Operations Centers - Various Locations
Solicitation # W9128F26SM026
The USACE Omaha District is conducting market research via solicitation W9128F26SM026 to gauge industry interest and capabilities for the construction of four mission-critical Space Operations Facilities (SOF). These facilities will be located at Grand Forks AFB, North Dakota; Schriever SFB, Colorado; Redstone Arsenal, Alabama; and Kirtland AFB, New Mexico. The total estimated portfolio value is 1 billion dollars, with approximately 250 million dollars allocated per site. The government intends to utilize a Progressive Design-Build approach executed through an Other Transaction Agreement under 10 USC 2808a, which exempts the project from standard Federal Acquisition Regulation clauses. Each facility must meet stringent technical and security standards, including the Uptime Institute Tier III fault-tolerant standard, Protection Level 2 requirements, and ICD 705 standards for secure spaces. Key deliverables for each site include a 500-person secure auditorium, a 6,297 square foot dining area for 24/7 operations, and redundant power and cooling distribution paths. The selection process will be qualifications-based, involving a Request for Qualifications, down-selection based on past performance, and collaborative oral pitches. Interested parties must submit their capabilities narratives, company identifiers, and CMMC status to Sarah Martin by October 15, 2026.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS