Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

CPH26-0005 Sheephouse – Bank Stabilization and Restoration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The CPH26-0005 Sheephouse Bank Stabilization and Restoration project is a coastal permit forecast issued by Sonoma County, California. The project focuses on a 11.5 acre parcel along Sheephouse Creek, specifically targeting the 100 foot Riparian Corridor setback. The primary objective is to protect the structural integrity of the stream bank to prevent the collapse of an unpaved access road while reducing future sediment delivery into the waterway. In addition to structural stabilization, the proposal includes efforts to enhance both riparian and instream riparian habitats. The project is managed by Robert Pennington, a Professional Geologist, with Ernest Ricioli serving as the project applicant. Performance of the work is slated for the 95450 zip code area in California.

General Info

Sonoma County project stabilizing Sheephouse Creek banks to protect roads and enhance habitats.

Agency

California → Sonoma County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Highway 116 and Highway 1, CA, 95450

Set-Aside

NONE

Documents

(1)

Notice of Exemption CPH26-0005 and Fish and Wildlife Receipt

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Robert PenningtonProfessional Geologist
Ernest RicioliProject Applicant

Full Description

Show more
Coastal Permit for bank stabilization within the 100 foot Riparian Corridor setback along Sheephouse Creek on a 11.5 acre parcel. Proposal includes enhancement of riparian and instream riparian habitat, reduce future sediment delivery, and restore and protect the structural integrity of the stream bank where an unpaved access road is vulnerable to collapse.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the project involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The estimated contract value ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for small businesses, including specific preferences for HUBZone, SDB, WOSB, VOSB, and SDVOSB concerns. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Mandatory requirements for responsiveness include active SAM registration, a bid guarantee, and the submission of Standard Form 1442. The contractor is required to provide key personnel, including a Project Manager, Superintendent, QC Manager, and Site Safety and Health Officer, and must adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Failure to meet the delivery schedule will result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details