CVIN, dba Vast Networks, United States (U.S.) Highway 50 Middle-Mile Broadband Network Project (Encroachment Permit 03-26-6-BB-0946)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

CVIN, doing business as Vast Networks, is undertaking a broadband infrastructure project in coordination with the California Department of Technology and Caltrans to deploy fiber optic cable and associated vaults along a segment of U.S. Highway 50 in El Dorado County, specifically between post mile R15.063 and R15.081. This initiative aims to enhance middle-mile connectivity by establishing a high-capacity telecommunications backbone through public right-of-way, supported by an encroachment permit issued under number 03-26-6-BB-0946. The project is planned for implementation in the vicinity of Placerville, California, and involves close collaboration with state agencies to ensure compliance with transportation and infrastructure regulations. The project is forecasted with a posted date of June 30, 2026, and is managed through Caltrans District 3 based in Marysville/Sacramento. Key points of contact include Cindy Kinkade, Project Manager at AECOM, who can be reached at 619-917-8235, and Dotrik Wilson, Branch Chief with the California Department of Transportation, reachable at 530-821-3054. All project details and documentation are accessible via the provided digital link, ensuring transparency and coordination among stakeholders. No specific set-aside provisions or NAICS codes are indicated, and the contract remains focused on the physical deployment of network infrastructure within the designated highway corridor.

General Info

CVIN deploys fiber optic cable along U.S. Highway 50 in El Dorado County via Caltrans and CDT collaboration.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Placerville, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for CVIN U.S. Highway 50 Broadband Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Cindy KinkadeProject Manager
Dotrik WilsonBranch Chief

Full Description

Show more
CVIN, dba Vast Networks, in coordination with the California Department of Technology and the California Department of Transportation (Caltrans), proposes to install broadband infrastructure consisting of fiber optic cable and vaults on U.S. Highway 50 between post mile (PM) R15.063 and PM R15.081 in El Dorado County.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Feeder 7 Repair
Solicitation # W50S8526BA007
The U.S. Air Force, through the W7NF Uspfo Activity Miang 127, is preparing to issue an Invitation for Bids under solicitation number W50S85-26-B-A007 for the construction of Electrical Repair Feeder 7 at Selfridge Air National Guard Base in Michigan. This is a firm fixed-price contract entirely set aside for small businesses under FAR 19.5, with the NAICS code 237130 for Power and Communication Line and Related Structures, and a size standard of $45 million. The project requires the contractor to furnish all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete approximately 5,706 feet of new underground and overhead conductors, demolition of existing cables, full-depth pavement repairs, mill/overlay, crack repairs, and associated site restoration work along Perimeter Road and Jefferson Ave. All work must strictly adhere to Drawings VGLZ262005 Repair Feeder #7, the Statement of Work, and project specifications, with any conflicts resolved in favor of the more stringent or higher-quality requirement. A Macomb County Soil Erosion Permit is mandatory and the responsibility of the contractor to obtain and pay for. The contract period is 240 calendar days from notice to proceed, inclusive of inspection and punch list items. The solicitation is being issued under FAR Part 14 procedures, with award determined solely on price and price-related factors. The prime contractor must comply with limitations on subcontracting, prohibiting payments exceeding 85 percent of the contract value (excluding materials) to non-similarly situated subcontractors under FAR clause 52.219-14(e)(3) with deviation 2021-O0008. All bidders must be registered in SAM.gov, and inquiries must be submitted in writing via email to TSgt Jack Garrettson. The formal solicitation is tentatively scheduled for release on July 13, 2026, with a pre-bid conference on July 22, 2026, and bid opening anticipated on or about August 31, 2026. The estimated contract value ranges between $1 million and $5 million, with the final amount to be determined upon bid submission.
W7NF Uspfo Activity Miang 127

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237130
New
Federal
Request for Information - Sentinel Utility Infrastructure, Malmstrom Air Force Base, MT
Solicitation # W912DW26S1CE0
The U.S. Army Corps of Engineers, Seattle District, is issuing this Request for Information to gather market intelligence for the Sentinel Utility Infrastructure Project at Malmstrom Air Force Base, Montana. This critical enabling project supports the modernization of the land-based intercontinental ballistic missile force by constructing a comprehensive utilities distribution system, including electrical distribution and substation expansion, water and wastewater systems, natural gas service, and a fiber-optic telecommunications backbone. The scope also includes associated site work such as grading, drainage, and access paving. The project is estimated to cost between 160 million and 200 million dollars with an anticipated period of performance of approximately 1,278 calendar days. Because this infrastructure is on the critical path for the overall Sentinel beddown, any schedule delays will impact all subsequent facility construction. The government intends to utilize Other Transaction Authority under 10 U.S.C. section 2808a, meaning the agreement will not be subject to the Federal Acquisition Regulation or standard small-business set-aside rules. The proposed acquisition strategy employs a Construction Management at Risk approach divided into two phases: a preconstruction collaborative phase for constructability reviews and cost development, followed by an at-risk construction phase based on a negotiated Guaranteed Maximum Price. Design is nearly complete and is being managed by Jacobs Engineering, who will remain the Designer of Record. Interested parties must respond via an online questionnaire and may submit a supplemental capabilities statement of no more than five pages to Kyla Couch by 10:00 AM Pacific Time on August 28, 2026. Selection will be based on a trade-off process evaluating qualifications, past performance, proposed approach, commercial terms, and price.
W071 Endist Seattle

POSTED

1 day ago

DEADLINE

in 13 days
View Details