Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Energy was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Data Center Construction and Critical Facility Infrastructure

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
Federal
Galley Renovation at USCG Station Lake Tahoe
Solicitation # 30670PR260000032
Solicitation 30670PR260000032 is a firm-fixed-price request for proposal issued by the US Coast Guard Regional Support Team – Southwest for the renovation of a 210 square foot galley at Station Lake Tahoe in California. This project is a total set-aside for small businesses with an estimated magnitude between 25,000 and 100,000 dollars. The scope of work includes the demolition and removal of existing cabinetry, countertops, sinks, griddles, and freezer units, followed by the installation of new commercial-grade cabinetry, stainless-steel countertops, a sink and faucet assembly, a combination griddle/burner unit, and a commercial-grade freezer. The existing refrigerator must be preserved and integrated into the new layout. All plumbing, electrical, and gas work must be performed by licensed professionals in accordance with state and local codes. The contract requires performance to commence within 15 calendar days of award, with a mandatory completion period of 60 calendar days. Award will be based on the lowest priced technically acceptable offer, requiring a reasonable technical approach and complete pricing. Key safety and environmental requirements include compliance with OSHA Lead in Construction Standards due to lead-based paint in the southeast corner and adherence to EPA Section 608 regulations for refrigerant reclamation from the old freezer. Offerors must be registered in SAM.gov and provide a detailed pricing breakdown of materials, personnel, and equipment. Proposals must be submitted via email by September 18, 2026, and include a technical approach addressing all statement of work tasks.
Base ALAMEDA(00031)

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) for the DHS Office of Firearms and Tactical Programs, provides design-build services for life, safety, and operational improvements at Fort Benning, Georgia. The project scope includes a variety of facility enhancements such as installing aluminum awnings, replacing turf at Fiske Range, demolishing and restoring Building 2294, improving gutters and drainage at Building 234, and performing commercial HVAC replacements. Additional work involves general improvements to Building 301 and the DAGr Team facility, including office refreshes, the installation of AV equipment and gear storage lockers, and the reconfiguration of restrooms to include walk-in showers. The estimated magnitude of the project is between 4.0 million and 4.5 million dollars, with a period of performance not to exceed 365 days from the date of award. Award will be based on the lowest total evaluated price, provided the offeror demonstrates a technical understanding of the requirements and possesses the necessary licensed professional resources. The contract is subject to the Davis-Bacon Act, requiring adherence to wage determination GA20260320, including specific federal paid sick leave and minimum wage mandates. Performance and payment bonds are required per FAR 52.228-15. Administrative oversight is managed by the Contracting Officer's Representative, Mr. Joseph Addison, and all payment requests must be submitted electronically via the Invoice Processing Platform with accompanying certified payroll.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This project involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The objective is to replace corroded and obsolete HVAC equipment with high-quality, durable, and coastal weather-resistant systems that exceed commercial and industrial standards. The SCADA portion of the project requires replacing current software and installing two chemical feed pumps to ensure effective water production and wastewater management in compliance with Texas Commission of Environmental Quality standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between 1.2 million and 1.5 million dollars. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price. Key requirements include the submission of a Quality Control Plan, a one-year contractor warranty for installation and craftsmanship, and the appointment of a Project Manager with at least five years of recent federal contracting experience. The project is subject to the Davis-Bacon Act and requires performance and payment bonds. All personnel must undergo background checks to access the secure facility. The contractor is responsible for providing a detailed project schedule following the Notice to Proceed and must adhere to specific working hours, typically 7:00 AM to 3:30 PM. Proposals must be submitted by September 24, 2026, and include a detailed pricing breakdown by CSI division.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation (MTC) is seeking fixed-price lump sum bids for a subcontracting opportunity to replace a 20hp motor connected to the rooftop HVAC system at the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes providing all labor, supervision, materials, equipment, and permits necessary for the removal and replacement of the motor, ensuring the system is fully operational upon completion. Deliverables include the successful installation and the provision of startup, testing, and commissioning documentation. All work must comply with federal, state, and local codes, OSHA requirements, and site safety procedures. Bids are due by September 19, 2026, at 3:00 PM MST and must be submitted via email to Patricia Willover and Nelson Dar. To be considered, bidders must conduct a physical site visit, sign the attendance roster, and submit a bid bond guarantee. The submission package must include a signed MTC Bid for Lump Sum Contract form and a detailed cost breakout on company letterhead. Award will be based on overall best value. The project is a small business set-aside and requires contractors to provide a 12-digit Unique Entity ID and a 9-digit Tax ID. Compliance with Davis-Bacon prevailing wage rates for Davis County, Utah, is mandatory. Additionally, the successful contractor must provide performance and payment bonds from a surety company with at least an A- rating within five business days of an Intent to Award letter. Payment will be processed via pay applications using AIA G702 and G703 forms based on a previously submitted Schedule of Values.
Management & Training Corporation

POSTED

about 14 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 11 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking subcontractors to replace a failing air-cooled chiller in Building 214/215 at the North Texas Job Corps Center in McKinney, Texas. The project requires the installation of a like-kind, similar model to the existing 246-ton Carrier unit, including demolition and disposal of the old equipment. The scope of work extends to building automation controls via the installation of a JACE 9000 central integration point with a graphical user interface, the installation of four 3-way control valves, and the replacement of three out of four air handler VFDs. Additionally, the contractor must clean and inspect four air handling units, including blower motors, wheels, coils, and screens. Bids must be submitted by September 18, 2026, and must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1 million dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. The contractor is responsible for performing startup and operational tests and providing all warranty information and final job documentation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 14 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) 1091 – Glazing/Welding/Heavy Mechanics Bldg
Solicitation # 26-140
Adams and Associates, Inc. is soliciting a single lump sum contract to replace a failing 10-ton gas-fired packaged HVAC unit at the Atterbury Job Corps Center in Edinburgh, Indiana, specifically within Building 1091. The project requires the installation of a new 12.5 SEER packaged unit utilizing non-R22 refrigerants, such as R-410A or R-454B, while reusing existing ductwork, thermostat wiring, and electrical disconnects. The contractor must leave the old unit at the maintenance building for parts and provide labeled recovered refrigerant to the facility. Proposals are due by October 5, 2026, and require a mandatory site visit on September 23, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible bidders must possess a valid Indiana Contractor's License, an active SAM.gov registration with a Unique Entity ID, and provide proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. The contractor must comply with EPA, OSHA, and Davis Bacon Act wage determinations. Deliverables include a sequenced construction schedule within 10 days of the notice to proceed, a one-year workmanship guarantee, and manufacturer product warranties. Final payment is contingent upon a successful substantial completion walk-through, submission of a completed SF 1413, and the release of liens from all subcontractors.
Adams & Associates, Inc.

POSTED

about 14 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract pertains to the design and construction of a high-density, modular data center featuring advanced power delivery systems and liquid cooling infrastructure, intended to support high-performance computing and mission-critical operations. The project will be executed at a facility located in Lemont, Illinois, with a NAICS code of 238220 indicating specialized construction services for commercial and industrial building systems. As a subcontract opportunity under the Department of Energy through its contractor Argonne National Laboratory, the work requires expertise in modular construction techniques, thermal management for dense computing environments, and redundant power architectures to ensure operational resilience and energy efficiency. Responses to this solicitation are due by August 21, 2026, and the contract is structured as a subcontract, meaning interested parties must be prepared to operate under a prime contractor’s umbrella rather than directly with the government agency. The facility will need to accommodate rapidly evolving computational demands while adhering to stringent reliability, scalability, and environmental control standards. No set-aside provisions are specified, and the absence of detailed point of contact information suggests that all inquiries must be directed through the official SAM.gov portal linked in the posting. The emphasis on modularity and advanced cooling underscores the need for innovative, future-proof design solutions capable of supporting long-term technological upgrades and sustained high availability.

General Info

Design and construct modular data center in Lemont, IL with liquid cooling and redundant power for DOE via Argonne National Lab.

Agency

Department Of Energy → Argonne National Labor - DOE ContractorView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Lemont, IL, 60439, USA

Set-Aside

NONE

Documents

This scope was carved out of AI-Capability-RFI(22-utilities).

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Information (RFI) on Opportunities and Business Models Regarding AI Supercomputing Capability at Argonne National Laboratory

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Argonne National Labor - DOE Contractor
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Argonne National Labor - DOE Contractor
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and construction of a high-density, modular data center with advanced power delivery and liquid cooling systems.

More opportunities from Department Of Energy → Argonne National Labor - DOE Contractor

Same awarding agency

NAICS: 54171
New
Federal
Chain Reaction Innovations - Energy Technology Innovation
Solicitation # 6-BB47-P-00203-00
The Chain Reaction Innovations program, managed by Argonne National Laboratory for the Department of Energy, is seeking individual innovators for its 2027 cohort to accelerate the commercialization of high-impact physical science and energy technology. This initiative supports early-stage innovations that align with the DOE mission of advancing national, economic, and energy security. Selected participants are embedded within Argonne National Laboratory for up to 24 months, receiving a personal stipend, travel allowance, and health benefits through an ORISE fellowship. The engagement is structured via non-negotiable Cooperative Research and Development Agreements (CRADAs), beginning with a scope and planning phase of typically less than six months focused on market studies and the development of an Intellectual Property Management Plan. Eligibility is restricted to individuals who are U.S. citizens or lawful permanent residents with at least five years of R&D experience; incorporated entities are prohibited from applying. Evaluation is based on the project leader's technical strength and entrepreneurial drive, the project concept's technical merit and economic impact on the U.S., and the overall fit with laboratory resources. Applicants must submit a comprehensive package via the online portal, including a one-page resume, a five-page technical deck, and detailed narratives regarding their vision and business idea. Continuation into the second year of the program is subject to a midpoint review at the end of the first year to ensure performance meets minimum criteria.

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 541611
Federal
Outplacement Services
Solicitation # 6-B191-P-00213-00
Argonne National Laboratory, operated by UChicago Argonne, LLC, is seeking a contractor to provide professional and confidential outplacement services for employees involuntarily separated due to workforce restructuring. The scope of work focuses on career transition support, specifically emphasizing skills assessment and resume preparation. Required services include two-day workshops for groups and individuals, online programs, executive one-on-one private sessions, and ongoing counseling for one year following the termination date. These services may be delivered at the contractor's facility or through virtual and remote methods. The contract is structured as a Basic Ordering Agreement with a primary period of performance starting October 4, 2026, for one year, with two additional one-year option periods. Work will be authorized through firm fixed price work orders. Award selection is based on best-value tradeoffs, with the technical proposal—covering similar work experience, technical approach, and personnel qualifications—carrying the most weight. Proposals must be submitted in three parts: technical, business/management, and price. The business/management portion includes a pass-fail evaluation of corporate and financial stability, while the price proposal follows a specific format for various service units. All offerors must provide completed representations and certifications, including compliance with FAR standards regarding telecommunications equipment and human trafficking.
Administrative Management and General Management Consulting Services

POSTED

11 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS