Deputy Chief of Mission Residence (DCMR) Driveway and Stormwater Drainage Rehabilitation, Canberra/Australia
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Deputy Chief of Mission Residence in Canberra, Australia, is undergoing a comprehensive driveway and stormwater drainage rehabilitation project under solicitation number 19AS2026Q0020, posted on June 23, 2026, with a response deadline of August 6, 2026. The scope of work involves a full investigation, repair, and upgrade of the stormwater drainage system, including the complete removal and replacement of deteriorated asphalt pavement with a minimum 50 mm compacted thickness, rehabilitation of the subgrade and base course, and replacement of existing stone edging with 150 mm concrete kerbs. Additional requirements include entrance apron asphalt works, restoration of landscaping, irrigation, lighting, and utilities, and full site reclamation to ensure all areas are returned to proper condition. The contractor is responsible for supplying all labor, materials, equipment, and incidental costs necessary to execute every aspect of the project as detailed in Section B of the Statement of Work. This procurement is administered by the U.S. Embassy Canberra under the Department of State, with the primary point of contact being Malenereynee Carr and secondary contact Paul Rau. The NAICS code for the project is 812930, indicating a classification under Other Support Activities for Building Equipment Contractors. The solicitation is not subject to any set-aside, and the place of performance is located in Canberra, Australian Capital Territory, 2600. Proposals must be submitted through the SAM.gov portal, and inquiries should be directed using the provided contact information. Any response must address the technical specifications and logistical demands of executing the work on a diplomatic residence site under strict standards of quality and environmental restoration.
General Info
Agency
NAICS
Place of Performance
Canberra, AU-ACT, 2600, AUSSet-Aside
Documents
(2)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
DCMR Driveway and Stormwater Drainage Rehabilitation. Work includes stormwater drainage investigation, repair, and upgrade; full removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness); subgrade and base course rehabilitation; replacement of existing stone edging with 150 mm concrete kerbs; entrance apron asphalt works; and full site restoration of landscaping, irrigation, lighting, and utilities. The contractor shall furnish all labor, materials, equipment, and miscellaneous costs required to complete the installation as specified herein..
Please refer to Section B for the detailed Statement of Work.