Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Design-Build Repair/Renovate Bldg. 10251, 10253 & 10263, Project Number: MPLS 97-1156

Active
FA3047-11-B-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves a design-build project to repair, renovate, and upgrade three buildings (10251, 10253, and 10263) at Lackland Air Force Base. The contractor is responsible for providing complete design analyses at 60% and 100% design submittals based on an existing 35% conceptual design package, with an option to reference a fully renovated mirror-image building design. The work includes comprehensive repair and upgrades to building 10251 covering all major systems such as interior finishes, structural elements, HVAC, plumbing, roof, electrical systems, exterior finishes, and fire suppressant systems. For buildings 10253 and 10263, the scope is limited to HVAC systems repair and upgrade, including mold abatement, replacement of the existing 2-pipe heating and cooling system with a more efficient 4-pipe system, ventilation, and connection to the base’s energy management control system. The project carries a magnitude estimated between $5 million and $10 million, with a performance period of 300 days for construction. It is designated as a HUBZone set-aside under NAICS code 236220 (Commercial and Institutional Building Construction). Contractors must provide a bid bond of up to $3 million and participate in a mandatory pre-bid site visit. Compliance with DoD criteria, Air Force regulations, life safety codes, and ADA requirements is mandated. The contract includes detailed investigations and testing of current systems, requiring the contractor to recommend and design necessary repair, replacement, or upgrades subject to government approval. Upon final design approval, a construction notice to proceed will be issued. Prospective bidders must be registered in the Central Contractor Registration system with an updated ORCA record to be eligible for award.

General Info

Design-build project repairing and upgrading three Lackland AFB buildings with HVAC and system improvements.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Buildings 10251, 10253 & 10263, Lackland AFB, TX, 78236, USA

Set-Aside

HZC

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhasePresolicitation
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
RYAN D. BUENOContract Specialist
Jackie L. MurrayTeam Lead/Contracting Officer

Full Description

Show more
*** UPDATES - ATTENTION CONTRACTORS!!! *** The NAICS code has been changed from "238220" to "236220." The NAICS code for this project is now "236220." (26 JUL 2011) ***** TITLE: Design-Build Repair/Renovate Bldg. 10251, 10253 & 10263, Project Number: MPLS 97-1156 GENERAL DESCRIPTION: The contractor shall provide a complete design analysis (60% and 100% design submittals) for the design-build contract to repair / renovate / upgrade buildings 10251, 10253 and 10263; to include: equipment selection, investigations, calculations, studies, referenced design instructions, and design drawings as required for construction. The contractor shall utilize and adapt the 35% conceptual design package (dated 24 June 2011, JACOBS) provided by the government for buildings 10251-10253-10263. Upon award of contract, the contractor shall re-evaluate the 35% conceptual design package (dated 24 June 2011, JACOBS) for value-engineering purposes and will have the option of utilizing an existing 100% design (by Robles Service Group) for B10261 as a mere reference or guide to go by. Building 10261 is a mirror image design to building 10251 and has already been fully renovated. If the contractor chooses to utilize the existing design for B10261, the contractor shall re-evaluate it for value engineering purposes as well. The contractor shall provide a working design at the 60% benchmark and final design at 100% for approval by government; the contractor shall provide in writing to the government any/all deviations from the existing design(s) that will be applied to the new designs for buildings 10251-10253-10263. This project will consist of a complete repair / renovation / upgrade for building 10251 to include all major systems and finishes. This project will only repair/renovate/upgrade HVAC for buildings 10253 and 10263. The contractor shall provide a design for the repair / renovation / upgrade of the following: Building 10251 Interior Spaces - The contractor shall investigate existing conditions of all interior spaces of the facility to include walls, ceilings and floor finishes, doors/windows and door/windows frames of all dorm rooms/bathrooms and determine the conditions of said finishes. The contractor shall make recommendations for their repair and/or replacement. The contractor shall provide a design for the replacement of all finishes for the facility to include walls, ceilings doors/windows, door/window frames and floors. All finishes shall be as approved by the contracting officer or his representative. Structural System - The contractor shall investigate the structural integrity of the facility and determine the condition of the structural elements. There has been evidence of cracking on the building exterior. Based upon this investigation, the contractor shall repair all cracks and recommend whether the structural integrity of the building needs repair and/or upgrade. The contractor shall design for the repair and upgrade of the structural elements of the facility if so approved by the contracting officer or his representative. HVAC - The contractor shall investigate the entire Heating Ventilation and Air Conditioning (HVAC) system including ductwork (air distribution), controls, air handler units, tanks, valves, distribution piping, boiler, etc for the facility. The contractor shall recommend whether the system and/or its components need to be repaired or replaced. The contractor shall investigate issues with mold and mildew in the dorm rooms and incorporate a solution in the design for de-humidification. The contractor shall design an HVAC system from the source at the heating and chilled water plant (building 10263) to the terminal units with the upgrade to a four pipe system from the existing 2 pipe system. The contractor shall investigate and recommend solutions and design for the repair/replacement/upgrade of said system and its components as approved by the contracting officer and to include test and balancing of the system and system to be connected to base Energy Management Control System (EMCS). The contractor shall investigate the existing ventilation and exhaust system to determine whether the systems need to be repaired, replaced and/or upgraded and bring each to compliance with current/applicable codes. The contractor shall provide a design of new ventilation and exhaust systems. The cooling and heating systems for the dorm consist of chilled water supplied by a central plant and local boilers on a 2-pipe system. The current system is beyond its useful life and replacement with a 4-pipe system is recommended. All chilled/hot water piping insulation shall be replaced throughout the building for this project after all repairs and testing has been completed. Replacement of the existing limited and outdated 2-pipe system consists of removing the existing black iron and copper piping, piping insulation, and in-room fan coil units. This system will be replaced with new 4-pipe black iron and copper piping as well as new fan coil units. All ductwork and fans within the bathroom exhaust system will be replaced. Ceilings will be removed and replaced. This project will include mold abatement. The power supply for these units will be replaced in the process. Plumbing - The contractor shall investigate the existing water supply piping (to/from the main) and sanitary sewer/drainage piping (to/from the main) to the building, to determine whether the piping needs to be repaired, replaced and/or upgraded. The contractor shall investigate the existing water supply distribution piping (within the building) and sanitary sewer/drainage piping (within the building), to determine whether the piping needs to be repaired, replaced and/or upgraded. The contractor shall provide a design for the repair/replacement/upgrade of all water supply and sanitary sewer piping from the main to within the building and finally to all plumbing fixtures. The contractor shall provide testing of all sanitary sewer lines (to/from) the main before any work to begin. The contractor shall provide a design to replace all bathroom, shower and laundry plumbing fixtures with Moen brand fixtures. Roof - The contractor shall investigate the condition of the roof system, gutters, down spouts and recommend whether each or all need repair and/or replacement. The gutters and downspouts are concealed in horizontal chases and masonry brick columns. The contractor shall test each and then provide his recommendations for repair/replacement. The contractor shall provide a design for the repair and/or replacement of the entire roof system/gutters/down spouts. Any/all recommendations for repair/replacement/upgrades shall be approved by the contracting officer or his representative. Electrical - The contractor shall investigate the entire electrical system for the facility to include the exterior power supply and determine if it is sufficient supply to meet the building demand. All major systems work; however, they have reached the end of their useful life. The contractor shall design a complete upgrade of all electrical elements to the building, which includes but is not limited to the following: interior/exterior lighting, outlets/receptacles/switches, branch wiring, electrical panels, etc. The contractor shall investigate whether any new requirements are needed to bring the electrical system up to code. The contractor shall replace the existing fire alarm system and associated emergency lighting system; along with replacement of all exit lighting (do not want hanging type fixture). Exterior - The contractor shall investigate the existing condition of the exterior finishes to include wall finish, doors, door hardware, door locking system, door thresholds, door/window framing (one piece), windows, window locks, stairs and handrails, etc for the facility. Door signage will not require Braille surface type. Based on contractor's recommendations and those made by 802d CES, the contractor shall provide a design for the upgrade/replacement of all exterior finishes of the facility. The contractor shall install CAC access control (card swipe) locks for all exterior doors to the dormitory, as approved the contracting officer and/or his representative. Fire Suppressant System - The contractor shall investigate the current fire suppressant system and provide a design for the upgrade and replacement of the existing system to meet current standards. Buildings 10253 and 10263 HVAC - The contractor shall investigate the entire Heating Ventilation and Air Conditioning (HVAC) system including ductwork (air distribution), controls, air handler units, tanks, valves, distribution piping, boiler, etc for each facility. The contractor shall recommend whether the system and/or its components need to be repaired or replaced. The contractor shall investigate issues with mold and mildew in the dorm rooms and incorporate a solution in the design for de-humidification. The contractor shall design an HVAC system from the source at the heating and chilled water plant (building 10263) to the terminal units with the upgrade to a four pipe system from the existing 2 pipe systems, for each facility. The contractor shall investigate and recommend solutions and design for the repair/replacement/upgrade of said system and its components as approved by the contracting officer and to include test and balancing of the system and system to be connected to base EMCS. The contractor shall investigate the existing ventilation and exhaust system to determine whether the systems need to be repaired, replaced and/or upgraded and bring each to compliance with current/applicable codes. The contractor shall provide a design of new ventilation and exhaust systems. The cooling and heating systems for the dorm consist of chilled water supplied by a central plant and local boilers on a 2-pipe system. The current system is beyond its useful life and replacement with a 4-pipe system is recommended. All chilled/hot water piping insulation shall be replaced throughout the building for this project after all repairs and testing has been completed. Replacement of the existing limited and outdated 2-pipe system consists of removing the existing black iron and copper piping, piping insulation, and in-room fan coil units. This system will be replaced with new 4-pipe black iron and copper piping as well as new fan coil units. All ductwork and fans within the bathroom exhaust system will be replaced. Ceilings will be removed and replaced. This project will include mold abatement. The power supply for these units will be replaced in the process. Upon approval of the final 100% design the government shall issue a construction Notice to Proceed (NTP) to the Contractor. The proposed construction requirements in Section 3 are recommendations made by the government and may be re-evaluated by the contractor for value engineering purposes. The contractor shall investigate and comply with all applicable DoD design criteria including those that may have become applicable subsequent to the completion of the JACOBS design, Air Force regulations, equipment specifications, handicap accessibility requirements, life safety codes, fire safety codes, asbestos and lead-based paint abatement requirements and local, state and Lackland Air Force Base (LAFB) criteria in order to perform the services covered by this SOW in accordance with them. Period of Performance and Magnitude: The magnitude for this requirement is between $5,000,000.00 and $10,000,000.00. The period of performance is 300 days for construction. SET ASIDE: HUBZone NAICS Code: North American Industry Classification System (NAICS) code. The applicable NAICS code for this acquisition is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $33,500,000.00. BID BOND: In accordance with FAR 52.228-1 Bid Guarantee an original bid bond must be submitted with your bid package to be responsive. The amount of the bid guarantee shall be 20% of the bid price or $3,000,000.00, whichever is less. Pre-Bid Conference / Site Visit is Scheduled for 16 Aug 11 (Estimated) at 9:00am (CST). This will be a one time site visit. Vendors not attending this site visit will not receive access to the site after this visit. Location: 802D Contracting Squadron 1655 Selfridge Ave, Bldg. 5450, (Legacy Room), Lackland AFB, TX 78236. Bids are due on 7 Sep 11 (Estimated) no later than 1:00pm (CST). Specific instructions can be found in Section H, L and M of the upcoming Invitation for Bid (IFB). It is anticipated that the following viewers will be needed to view the solicitation: Microsoft Word (.doc), Adobe Acrobat Reader (.pdf), WinZip (.zip or .exe.), and / or AutoCAD. More information concerning these viewers can be found on the FBO website. Note: Any prospective contractor must be registered in the Central Contractor Registration (CCR) database in order to be eligible for award. Registration requires applicants to have a DUNS number from Dun and Bradstreet. Registration may take up to three weeks to process. Recommend registering immediately in order to be eligible for timely award. Effective 01 Jan, 2005, the Federal Acquisition Regulation (FAR) requires the use of Online Representations and Certifications Application (ORCA) in Federal solicitations as part of the proposal submission process. All prospective contractors submitting an offer in response to the subject solicitation must go to http://www.bpn.gov/ to add/update its ORCA record. Primary POC is Ryan D. Bueno, Contract Specialist at (210) 925-1842; email: ryan.bueno.1@us.af.mil; Alternate POC are SSgt Chad J. Stemick, Contract Specialist at (210) 671-1712; email:chad.stemick@us.af.mil; Sandra Bernard, Contract Specialist at (210) 925-1841; email: sandra.hypolitebernard@us.af.mil; and Mr. Basilio Solis, Contract Specialist at (210) 671-1706; email:basilio.solis@us.af.mil; or Mr. Jack Murray, Contracting Officer at (210) 671-1711; email: Jackie.murray@us.af.mil.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS