DMP Pipe Removals

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The DMP Pipe Removals project, managed by the Central Valley Flood Protection Board in California, involves the removal of seven 24-inch corrugated metal pipes and their associated structures. The scope requires removal to extend at least 15 feet beyond the landside levee toe, with any remaining segments outside the levee easement being plugged with concrete. To ensure accuracy, pipe locations will be verified using exploratory potholing within 25 feet of staked locations. Following the removals, the levee must be restored to its original condition, with backfill and compaction adhering to California Code of Regulations Title 23 standards. Final restoration includes reseeding the levee slopes with approved native grasses. This forecast project is coordinated by Jordan Robbins and Scott Cole.

General Info

Central Valley Flood Protection Board project removing seven pipes and restoring levee conditions.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

WA2026104_NOE

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Scott ColeDistrict President

Full Description

Show more
To remove the seven existing 24-inch corrugated metal pipes and their associated appurtenant structures. The removal will extend to a minimum of 15 feet beyond the landside levee toe. Remaining pipe segments beyond the levee easement will be left in place and plugged with concrete. Pipe locations will be verified through exploratory potholing along an assumed perpendicular alignment, up to 25 feet on either side of the staked locations. The levee will be restored to pre-construction conditions. The backfill and compaction will conform to California Code of Regulations, Title 23, Waters, Division 1 (Title 23), Section 120 – Levees standards. The levee slopes will be reseeded with approved native grasses.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) provisions, Davis-Bacon Related Acts, and DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the project involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The estimated contract value ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for small businesses, including specific preferences for HUBZone, SDB, WOSB, VOSB, and SDVOSB concerns. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Mandatory requirements for responsiveness include active SAM registration, a bid guarantee, and the submission of Standard Form 1442. The contractor is required to provide key personnel, including a Project Manager, Superintendent, QC Manager, and Site Safety and Health Officer, and must adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Failure to meet the delivery schedule will result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details