Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Pier Repair (Lake Alteration Agreement EPIMS Notification No. PLA-66783-R2)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has entered into Lake Alteration Agreement PLA-66783-R2 with applicant Atte Lahtiranta for the modification of a private pier at 1510 N Lake Tahoe Boulevard. The scope of work includes upgrading the existing pier girders, joists, and decking, replacing a fixed catwalk with a new 3 by 30 foot adjustable version, and upgrading the boat lift from 6,000 to 12,000 pounds. To facilitate these installations, two H beams will be driven into the lakebed to a depth of at least 6 feet or until refusal, resulting in a total lakebed disturbance of approximately 0.75 square feet. As part of the agreement, the project will also include the installation of a rock and cobble pyramid to provide 4 square feet of fish habitat enhancement.

General Info

Atte Lahtiranta will modify a private pier and enhance fish habitat in Tahoe.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

PLA-66783-R2_NOE

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
Contacts
Patrick MoeszingerSenior Environmental Scientist, Specialist
Atte LahtirantaApplicant

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake Alteration Agreement EPIMS Notification Number PLA-66783-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Atte Lahtiranta. The project is limited to the modification of an existing private pier located lakeward of the residence at 1510 N Lake Tahoe Boulevard. The project entails upgrading/updating the existing pier girders, joists, and decking. Additionally, a new 3'x30' adjustable catwalk will replace the existing fixed catwalk, and an upgraded 12,000 lb. boat lift will replace the existing 6,000 lb. boat lift. To install the boat lift and catwalk, two (2) H beams will be driven into the lakebed at least 6' in depth or until refusal. The total lakebed disturbance will be approximately 0.75 sq. ft. Project activities will also include the installation of 4 sq. ft. of fish habitat enhancement consisting of one (1) rock/cobble pyramid.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) provisions, Davis-Bacon Related Acts, and DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the project involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The estimated contract value ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for small businesses, including specific preferences for HUBZone, SDB, WOSB, VOSB, and SDVOSB concerns. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Mandatory requirements for responsiveness include active SAM registration, a bid guarantee, and the submission of Standard Form 1442. The contractor is required to provide key personnel, including a Project Manager, Superintendent, QC Manager, and Site Safety and Health Officer, and must adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Failure to meet the delivery schedule will result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details