Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Arroyo Conejo Utility and Road Maintenance (Streambed Alteration Agreement, No. EPIMS-VEN-60353-R5)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has amended Streambed Alteration Agreement No. EPIMS-VEN-60353-R5 with the City of Thousand Oaks, represented by Patrick McCulloch. This agreement authorizes regular maintenance and inspection activities for wastewater interceptor Units W and Y, covering twenty utility facilities across seven access road segments. Primary activities include vegetation trimming, access road and culvert maintenance, and the management of utility facilities such as valves, manholes, and pipeline cleanout access points. The amendment specifically updates the protocols for temporary water crossings, establishing the use of steel plates on top of I-beams across the stream as the preferred method. These activities are conducted in accordance with Section 1602 of the Fish and Game Code to ensure proper environmental management during the maintenance of the utility infrastructure in Thousand Oaks, California.

General Info

CDFW amended agreement for City of Thousand Oaks wastewater interceptor maintenance and inspections.

Agency

California → Fish and Wildlife, Region 5 - South Coast, San Diego

Place of Performance

Thousand Oaks, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A
Contacts
Angela CastanonEnvironmental Scientist
Patrick McCullochUtilities Maintenance Supervisor City

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has amended Streambed Alteration Agreement No. EPIMS-VEN-60353-R5, pursuant to Section 1602 of the Fish and Game Code to the City of Thousand Oaks as represented by Patrick McCulloch. The Project is limited to regular maintenance activities and inspection activities along the wastewater interceptor Unit W and Y. These activities will mainly consist of vegetation trimming, access road maintenance, culvert/crossing maintenance, and the implementation of four temporary crossings but several unique maintenance activities will occur at specific facilities. There are a total of 20 utility facilities across seven distinct access road segments. Within the facility are access roads, pedestrian access paths, and utility facilities (pipeline cleanout access points, valves, and manholes). The Streambed Alteration Agreement was amended to include differing temporary water crossing methods. These methods involve the use of steel plates on top of I-beams across the entirety of the stream as a preferred method.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS