2nd Street Erosion Repair and Water Quality Protection Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The 2nd Street Erosion Repair and Water Quality Protection Project, managed by the San Mateo County Resource Conservation District, involves the emergency stabilization of an eroding drainage ditch bank in Montara, California. To prevent the bank from failing during storm events, approximately 22 tons of rock slope protection will be installed along a section of the bank, accompanied by minor grading and site preparation. The primary objective is to protect critical public infrastructure, specifically a gravity-fed sanitary sewer line and the adjacent roadway. By stabilizing the bank, the project aims to prevent the release of untreated sewage into the drainage channel and the Fitzgerald Marine Reserve. This initiative benefits local residents and utility customers by ensuring public health and safety while protecting sensitive marine resources and water quality.
General Info
Agency
NAICS
Place of Performance
2nd St between Farallone Ave and East Ave, CA, 94037Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
