Hilltop Park Slope Stabilization, CIP No. DRN0221
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Hilltop Park Slope Stabilization project, identified as CIP No. DRN0221, is managed by the Regional Water Quality Control Board in San Diego and located in Chula Vista, California. The primary objective is to restore damaged drainage infrastructure and mitigate seasonal erosion of channel bank slopes. This involves repairing and replacing approximately 250 linear feet of failed concrete channel to restore its original alignment, grade, and structural capacity, while ensuring no modification to existing drainage patterns. Slope stabilization efforts across the 2.27-acre project area will include removing grass, minor grading, installing a new irrigation system, applying geosynthetic matting, laying new sod, and repairing deteriorated grouted rip rap. Construction is scheduled to last five months once all necessary permits are approved. Primary points of contact for the project include Senior Planner Dai Hoang and Environmental Scientist Hayley Sue.
General Info
Agency
NAICS
Place of Performance
Chula Vista, CA, 91911Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
