Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Hilltop Park Slope Stabilization, CIP No. DRN0221

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hilltop Park Slope Stabilization project, identified as CIP No. DRN0221, is managed by the Regional Water Quality Control Board in San Diego and located in Chula Vista, California. The primary objective is to restore damaged drainage infrastructure and mitigate seasonal erosion of channel bank slopes. This involves repairing and replacing approximately 250 linear feet of failed concrete channel to restore its original alignment, grade, and structural capacity, while ensuring no modification to existing drainage patterns. Slope stabilization efforts across the 2.27-acre project area will include removing grass, minor grading, installing a new irrigation system, applying geosynthetic matting, laying new sod, and repairing deteriorated grouted rip rap. Construction is scheduled to last five months once all necessary permits are approved. Primary points of contact for the project include Senior Planner Dai Hoang and Environmental Scientist Hayley Sue.

General Info

Hilltop Park project restores 250 feet of drainage and stabilizes slopes in Chula Vista.

Agency

California → Regional Water Quality Control Board, Region 9 - San Diego

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Chula Vista, CA, 91911

Set-Aside

NONE

Documents

(1)

907270_NOE_Hilltop Park signed dwg 08-27-26

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 9 - San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 9 - San Diego
Office AddressN/A
Contacts
Hayley SueEnvironmental Scientist

Full Description

Show more
The purpose of the Project is to restore damaged drainage infrastructure and address seasonal erosion of channel bank slopes following rain events. The Discharger proposes to restore damaged drainage infrastructure to its pre-failure condition by repairing and replacing approximately 250 linear feet of the failed concrete channel to restore the original alignment, grade, and hydraulic and structural capacity. The slope stabilization component will remove existing grass, involve minor grading, install a new irrigation system, install geosynthetic matting, install new sod, and repair deteriorated grouted rip rap. No channel expansion or modification of drainage patterns is proposed. The total size of the entire area for all Project activities is 2.27 acres. Construction is expected to begin once all permits are approved and will continue for 5 months.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the project involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The estimated contract value ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for small businesses, including specific preferences for HUBZone, SDB, WOSB, VOSB, and SDVOSB concerns. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Mandatory requirements for responsiveness include active SAM registration, a bid guarantee, and the submission of Standard Form 1442. The contractor is required to provide key personnel, including a Project Manager, Superintendent, QC Manager, and Site Safety and Health Officer, and must adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Failure to meet the delivery schedule will result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details