This Solicitation opportunity from California was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Eagle and Magnolia Park Electrical Equipment Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves the replacement and upgrade of electrical switchgear at two parks in Rohnert Park, California, specifically at Eagle Park and Magnolia Park. At Eagle Park, located at 1075 Emily Avenue, the scope includes replacing one electrical switchgear cabinet along with a concrete pad. At Magnolia Park, situated at 1401 Middlebrook Way, the work entails replacing two electrical switchgear cabinets, furnishing and installing two new electrical enclosures, and removing and reinstalling existing irrigation controllers with new enclosures. The total estimated cost for the project is approximately $315,000, with a requirement that work at Magnolia Park be completed first, followed by Eagle Park, unless directed otherwise by the City Engineer. The contractor must hold a valid California C-10 Electrical license and commence work within 15 days of notice, diligently progressing to complete within 240 working days. Bidding procedures include a mandatory prebid conference scheduled for November 4, 2025, with site visits at both locations. Bids are due by November 14, 2025, at 2:00 PM, with detailed specifications and plans available digitally on the City of Rohnert Park’s website and in hard copy through Draftech Blueprinting for a fee. The project documents encompass comprehensive technical plans, specifications, and legal provisions, including bonding, insurance, prevailing wages, and project-specific requirements. The contract emphasizes adherence to applicable codes such as the California Building Code and ASCE standards, and requires RFIs to be submitted by November 7, 2025, to clarify project details. Overall, this project aims to modernize electrical infrastructure at the parks, ensuring compliance with safety and engineering standards while maintaining a structured timeline for completion.
General Info
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California → City of Rohnert Park
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
