Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Effluent Force Main Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
This firm-fixed-price contract, with an estimated magnitude between 1.5 million and 2 million dollars, tasks a contractor with comprehensive infrastructure repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The scope of work encompasses several critical facility improvements, including the replacement of boilers in the admin, processing, medical, and dining areas; the installation of a new fire alarm system in the dining facility; and extensive plumbing repairs in Multipurpose Building 3. Additionally, the project requires the repair and upgrade of the wastewater treatment plant infrastructure, specifically replacing worn valves, installing sewage grinders in the influent trough, and repairing aeration ditch piping to ensure the systems are durable and coastal weather resistant. The project also includes the painting and protective coating of 11 identified facilities using specific latex elastomeric masonry paint and the installation of galvanized ribbed metal on certain windows. The period of performance is 365 days from the date of award. Award will be based on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach and a robust safety and quality control program. Key requirements include the designation of a Project Manager with at least five years of recent federal contracting experience and the submission of a detailed Quality Control Plan. All work must be performed by licensed personnel in accordance with industry standards and manufacturer instructions, with specific manufacturer certification required for fire alarm and wastewater treatment installations. The contract is subject to the Davis-Bacon Act for prevailing wages, and the contractor must provide performance and payment bonds. Payment will be processed electronically via the Invoice Processing Platform, accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 14 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, and fittings, as well as connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the final disinfection, startup, and commissioning of the pipeline system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trade scopes, including steel pipe welding, electrical and instrumentation, trenchless construction, and materials testing. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. The solicitation is open to various set-aside categories, including Small Business, Women-Owned Small Business, and HUBZone entities. Quotes are due by September 18, 2026, at 2:00 PM PT, and all inquiries should be directed to Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 8 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project on South Marsham Street in Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of green infrastructure between Gravel Lane and US Route 50. Key deliverables include the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants. The scope also encompasses necessary drainage, underdrain, inlet, pipe, and downspout work, as well as limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business designations, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, with an encouragement for these entities to form consortiums if individual bid items are too large. Bids are due by September 17, 2026, at 4:00 P.M. The primary point of contact for the solicitation is Jennifer Wilson, with contract administration handled by Jonah Leith.
Harbel, Inc.

POSTED

about 8 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the installation of pressurized effluent force mains using HDPE or other approved piping materials, specifically for wastewater conveyance under municipal or utility infrastructure systems. The work falls under NAICS code 237110, which categorizes it as water and wastewater line and structure construction, indicating a focus on engineered underground systems designed to handle pressurized flow from treatment facilities or collection points. The project is solicited as a subcontract under the Department of Economic Development in Vermont, suggesting alignment with local economic or environmental infrastructure initiatives, though no specific location or set-aside provisions are detailed. The opportunity was posted on June 30, 2026, with a response deadline set for July 29, 2026, at 6:00 AM, providing potential bidders a nearly four-week window to prepare and submit proposals. The contract does not specify city, state, or zip code for performance, nor does it include a point of contact, which may indicate that further details will be released upon initial bid evaluation or are managed through a centralized agency portal. Interested parties must review the full solicitation through the provided Vermont Business Registry link to access technical specifications, material requirements, compliance standards, and performance expectations beyond the general scope of force main installation.

General Info

HDPE force main installation for wastewater under Vermont economic development subcontract, bid due July 29, 2026

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73907.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Center Community Decentralized Wastewater Treatment and Disposal System

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of pressurized effluent force mains using HDPE or other approved piping.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS