Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Electrical Feeder Installation (River Crossing)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of electrical feeder infrastructure for prime contractors on PG&E utility projects in Rio Dell, specifically focusing on segments that cross the Eel River. The scope of work includes performing horizontal directional drilling, trenching for feeder lines, and the installation of conduits or utility poles. To complete these tasks, the contractor must utilize specialized equipment such as HDD rigs, trenching machinery, and utility bucket trucks. The project requires the contractor to hold a valid electrical contracting license and strictly adhere to all PG&E engineering and safety standards to deliver a fully operational electrical feeder line. This opportunity is associated with the California State Lands Commission under NAICS code 237130 and was posted on July 16, 2026.

General Info

Electrical feeder infrastructure installation for PG&E utility projects in Rio Dell, California.

Agency

California State Lands Commission

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Rio Dell, CA

Set-Aside

NONE

Documents

This scope was carved out of Pacific Gas & Electric Company Rio Dell Feeder 352395524 Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State Lands Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
California State Lands Commission
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs Rio Dell Feeder infrastructure for prime contractors on PG&E utility projects, specifically segments crossing the Eel River. Performs horizontal directional drilling (HDD), trenching for feeder lines, and installation of utility poles or conduits. Utilizes HDD rigs, utility bucket trucks, and trenching equipment. Requires electrical contracting license and adherence to PG&E safety and engineering standards. Delivers an operational electrical feeder line.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 13 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission and distribution laterals from the existing backbone ring to splitter cabinets and public right-of-way access points. The scope of work encompasses cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and the use of FieldSmart Fiber Scalability Center equipment. The contract will be awarded to the lowest responsible and eligible bidder, with bids due by September 29, 2026. The project is governed by Massachusetts General Laws, requiring compliance with prevailing wage rates, anti-discrimination statutes, and debarment certifications. Bidders must provide a 5% bid deposit and the selected contractor must furnish a payment bond for 100% of the contract price. Performance is tied to a strict baseline schedule, with full completion, including final deliverables and punch list items, required within 30 weeks of mobilization. SELCO will retain 25% of the total contract value until a final audit and verification of all as-built documentation and testing results are completed. All work must adhere to OSHA safety regulations and local Shrewsbury noise and hour ordinances.
SELCO1 - SELCO

POSTED

about 24 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS